HomeMy WebLinkAboutAgenda Report - March 16, 1983 (28)Ccuncil was apprised that the reconstruction of curb and gutter in Howard Street beizaeen Lake Street and Holly Drive was approved in the 1982-83 Capital Improvement Budget with an estimated expenditure of $13,000.00 In general, the work consists of replacing broken curb and gutter and installing wheelchair ramps at the intersection of Howard Street and Holly Drive. During the design of the project it was determined that additional curb and gutter repla tmnt is needed on the south side of Holly Drive east and %,est of Howard Street and that a catch basin is needed. This additional work is included in the project, and additional funds will be requested at the time of award. The total cost of the project excluding the overlay is estimated at $23,0OO.Ou COUNCIL APPROVED THE PLANS AND SPDCIFICATIONS FOR STREET CURB AND GUMER REPLACEMENT, LAKE STREET STREET CURB DRIVE" AND AtlIi-iORIZED TILE CITY CLERK TO ADVERTISE AND Q 7= THEREON. REPLACEMEW LAKE ErREET TO HOLLY DRIVE x M 4 t 7�. "I�iOWARD TO HOLLY FOR BIDS i b f CITY COUNCIL MEETING:-. -MARCH 16, 1983;. Ccuncil was apprised that the reconstruction of curb and gutter in Howard Street beizaeen Lake Street and Holly Drive was approved in the 1982-83 Capital Improvement Budget with an estimated expenditure of $13,000.00 In general, the work consists of replacing broken curb and gutter and installing wheelchair ramps at the intersection of Howard Street and Holly Drive. During the design of the project it was determined that additional curb and gutter repla tmnt is needed on the south side of Holly Drive east and %,est of Howard Street and that a catch basin is needed. This additional work is included in the project, and additional funds will be requested at the time of award. The total cost of the project excluding the overlay is estimated at $23,0OO.Ou COUNCIL APPROVED THE PLANS AND SPDCIFICATIONS FOR STREET CURB AND GUMER REPLACEMENT, LAKE STREET STREET CURB DRIVE" AND AtlIi-iORIZED TILE CITY CLERK TO ADVERTISE AND Q 7= THEREON. REPLACEMEW LAKE ErREET TO HOLLY DRIVE x M 4 t 7�. "I�iOWARD TO HOLLY FOR BIDS 1 Z CITY OF L COUNCIL COMMUNICATION PUBLIC WORKS DEPARTMENT TO: City Council FROM: City Manager DATE: March 11, 1983 SUBJECT: Howard Street Curb and Gutter Replacement Lake Street to Holly Drive RECOMMENDED ACTION: That the City Council approve the plans and specifications Tor "Howard Street Curb and Gutter Replacement, Lake Street to Holly Drive'' and authorize the City Clerk to advertise for bids to be receivtd Wednesday, L April 6, 1983. BACKGROUND INFORMATIOV: The reconstruction of curb and gutter in Howard Street between Lake Street and Hol'.y Drive was approved in the 1982/83 Capital Improvement Budget with an estimated expenditure of $13,000. In general, the work consists of replacing broken curb and gutter and installing wheelchair ramps at the intersection of `coward Street and Holly Drive. During the design of the project it was determined that additional curb and gutter replacement is needed on the south side of Holly Drive east and west of Howard Street and that a catch basin is needed. This additional work '.s included in the project, and additional funds will be requested at the tame of award. The total cost of the project excl'ud{ng the overlay is estimated at $23,000. Jac�. Ronsko Publ c Storks Director 1.JLR/R P/ns