HomeMy WebLinkAboutAgenda Report - March 16, 1983 (28)Ccuncil was apprised that the reconstruction of curb and
gutter in Howard Street beizaeen Lake Street and Holly Drive
was approved in the 1982-83 Capital Improvement Budget with
an estimated expenditure of $13,000.00
In general, the work consists of replacing broken curb and
gutter and installing wheelchair ramps at the intersection
of Howard Street and Holly Drive. During the design of the
project it was determined that additional curb and gutter
repla tmnt is needed on the south side of Holly Drive east
and %,est of Howard Street and that a catch basin is needed.
This additional work is included in the project, and
additional funds will be requested at the time of award.
The total cost of the project excluding the overlay is
estimated at $23,0OO.Ou
COUNCIL APPROVED THE PLANS AND SPDCIFICATIONS FOR
STREET CURB AND GUMER REPLACEMENT, LAKE STREET
STREET CURB DRIVE" AND AtlIi-iORIZED TILE CITY CLERK TO ADVERTISE
AND Q 7= THEREON.
REPLACEMEW LAKE
ErREET TO HOLLY DRIVE
x M
4
t 7�.
"I�iOWARD
TO HOLLY
FOR BIDS
i
b
f
CITY
COUNCIL MEETING:-.
-MARCH
16, 1983;.
Ccuncil was apprised that the reconstruction of curb and
gutter in Howard Street beizaeen Lake Street and Holly Drive
was approved in the 1982-83 Capital Improvement Budget with
an estimated expenditure of $13,000.00
In general, the work consists of replacing broken curb and
gutter and installing wheelchair ramps at the intersection
of Howard Street and Holly Drive. During the design of the
project it was determined that additional curb and gutter
repla tmnt is needed on the south side of Holly Drive east
and %,est of Howard Street and that a catch basin is needed.
This additional work is included in the project, and
additional funds will be requested at the time of award.
The total cost of the project excluding the overlay is
estimated at $23,0OO.Ou
COUNCIL APPROVED THE PLANS AND SPDCIFICATIONS FOR
STREET CURB AND GUMER REPLACEMENT, LAKE STREET
STREET CURB DRIVE" AND AtlIi-iORIZED TILE CITY CLERK TO ADVERTISE
AND Q 7= THEREON.
REPLACEMEW LAKE
ErREET TO HOLLY DRIVE
x M
4
t 7�.
"I�iOWARD
TO HOLLY
FOR BIDS
1
Z
CITY OF L COUNCIL COMMUNICATION
PUBLIC WORKS DEPARTMENT
TO: City Council
FROM: City Manager
DATE: March 11, 1983
SUBJECT: Howard Street Curb and Gutter Replacement
Lake Street to Holly Drive
RECOMMENDED ACTION: That the City Council approve the plans and specifications
Tor "Howard Street Curb and Gutter Replacement, Lake Street to Holly Drive'' and
authorize the City Clerk to advertise for bids to be receivtd Wednesday,
L
April 6, 1983.
BACKGROUND INFORMATIOV: The reconstruction of curb and gutter in Howard Street
between Lake Street and Hol'.y Drive was approved in the 1982/83 Capital Improvement
Budget with an estimated expenditure of $13,000.
In general, the work consists of replacing broken curb and gutter and installing
wheelchair ramps at the intersection of `coward Street and Holly Drive. During the
design of the project it was determined that additional curb and gutter replacement
is needed on the south side of Holly Drive east and west of Howard Street and that
a catch basin is needed. This additional work '.s included in the project, and
additional funds will be requested at the tame of award. The total cost of the
project excl'ud{ng the overlay is estimated at $23,000.
Jac�. Ronsko
Publ c Storks Director
1.JLR/R P/ns