Loading...
HomeMy WebLinkAboutAgenda Report - March 6, 2013 C-06AGENDA ITEM COO tp CITY OF LODI COUNCIL COMMUNICATION • TM AGENDA TITLE: Approve Plans and Specifications and Authorize Advertisement for Bids for Hale Park Sports Court Resurfacing Project, 209 East Locust Street MEETING DATE: March 6, 2013 PREPARED BY: Public Works Director RECOMMENDED ACTION: Approve plans and specifications and authorize advertisement for bids for Hale Park Sports Court Resurfacing Project, 209 East Locust Street. BACKGROUND INFORMATION: Acrylic court surfaces have a useful life of approximately ten years under normal conditions. The Hale Park sports courts were last resurfaced in 2002 and are again in need of resurfacing. The Hale Park Sport Court Resurfacing Project includes resurfacing two sports courts at Hale Park (Exhibit A). The project consists of surface preparation and resurfacing of approximately 17,900 square feet of basketball and handball court surface, re -striping the game lines, and modifying portions of the existing chain-link fencing around the perimeter of the court area. The bid opening is scheduled for March 27, 2013. Following Council award of the project, construction is anticipated to begin mid-May. It is recommended Council approve plans and specifications and authorize advertisement for bids for the Hale Park Sports Court Resurfacing Project. FISCAL IMPACT: Aside from the Capital expenditure, the fiscal impact will be negligible. FUNDING AVAILABLE: Funding will be identified at project award. F. Wally Sa delin Public Works Director Prepared by Charles E. Swimley, Jr., City Engineer/Deputy Public Works Director FWS/CES/pmf Attachment G"G• 0 nradt Bartlam, City Manager KAWP\PROJECTS\PARKS\Hale Park\Hale Park Court Resurfacing\CPS&A_2013 resurfacing.doc 2/13/2013 11 C_1S'I'S'l U.141 I' Hale Park - Project Location S-1, 1"=3U PARD COURT11111111114111H' I; PROI L': -I' THIS PROJECT CONSISTS OF (2) PROJECT LOCATIONS WITHIN THE EXISTING PARK SIE. A. THE CONTRACTOR SHALL PROVIDE AND INSTALL APPROXIMATELY 13,399 SQUARE FEET OF NEW ACRYLIC SPORTS COURT SURFACING AND NEW GAME ONES AS _AID OUT PER THE PLANS AND SPECIFICATIONS. THE EXISTING COURT IE A 4 INCH THICK CONCRETE SLAB WITH EXPANSION JOINTS. THIS LOCATION SHALL RECEIVE (1) 50'—' FULL BASKETBALL COURT AND (1) 35'.45' HALF BASKETBALL COURT WITH PERIMETER APRONS, 8. THE CONTRACTOR SHALL PROVIDE AND INSTALL APPROXIMATELY 4,450 SQUARE FEET OF NEW ACRYLIC SPORTS COURT SURFACING AND NEW GAME LINES AS UID OUT PER THE PLANS AND SPECIFICATIONS. THE EXISTING COURT IS A 2 INCH THICK COMPACTED ASPHALT SLAB WITHOUT JOINTS. THIS LOCATION SHALL RECEIVE (1) 42x74' MODIFIED FULL BASKETBALL COURT WITH PERIMETER APRONS. PF01I;r l' (:0NDI1'10NS1'IT.A'1' AI'1'I Y 1'0 Eo"Ill PRPjI: -1 LOCA'TION'S EXISTING BASKEI'B4LL COURT CWJN LINK FENCING AND GATES SHALL REMAIN. 2. EXISTING BASHETB4LL STANDARDS SHALL REMAIN. 3. EXISTING SPORTS LOTTING STANDARDS SHALL REMAIN. 4. EXISTING CMU MASONRY WALL TO REMAIN. HALAL PARD F-CINC; THIS PROJECT CONSISTS OF (2) PROJECT LOCATIONS WITHIN THE EXISTING PARK SITE. IIX:ATION 41' C. THE CONTRACTOR SHALL REMOVE AND DISPOSE OF APPROXIMATELY 410 LINEAL FEET OF EXISTING BOTTOM TENSION WIRE AND INSTALL APPROXIMATELY 410 LINEAL FEET OF NE 1.66" O.D. SS -40 BOTTOM RAIL PIPE WITH APPROPRIATE HARDWARE WHICH WOULD INCLUDE BRACE BANDS. TAIL ENDS. BOLTS. NUTS AND NEW TIE WIRE TO SECURE THE EXISTING CHAIN UNK FABRIC TO NEW BOTTOM RAIL. LOCAT ON M2 0. THE CONTRACTOR SHALL REMOVE AND DISPOSE OF APPROXIMATELY 136 UNEAL FEET OF EXISTING BOTTOM TENSION WIRE AND INSTALL APPROXIMATELY 136 LINEAL FEET OF NEW 1.66' O.D. Si BOTTOM RAIL PIPE WITH APPROPRIATE HARDWARE WHICH WOULD INCLUDE BRACE SANDS, FAIL ENDS, BOLTS, NUTS AND NEW TIE WIRE TO SECURE THE EXISTING CHAIN LINK FABRIC TO NEW BOTTOM RAIL. (E) PRESSED STEEL CAPS (TO REMAIN; (E) END POSTS (TO REMAIN) EXISTING v 9 GAUGE GALVANIZED I MESH FABRIC TO REMAIN THE CONTRACTOR SHALL REMOVE ALL EXISTING TIE WIRE CONNECTORS FOR NEW 8070M RAL TO BE INSTALLEO, THE CONTRACTOR SHALL RE -STRETCH AND RE -TIE EXISTING FABRIC TO FRAME WORK AFTER MODIFICATION WORK IS COMPLETED. (E) LINE POSTS �(TO REMAIN) (E) TOP RALS: T.66 'OG SS -40 PIPE (TO REMAIN) THE CONTRACTOR SHALL REMOVE THE EXIST NO TENSION WIRE AND HOG RINGS AND REPLACE WITH NEW 1.66" O.D. ES -4D PIPE BOTTOM RAIL AND APPROPRIATE HARDWARE. (BRACE BANDS. RAIL ENDS, BOLTS. NUTS, TIRE WIRE ETC.) Chain Link Fence Retrofit Work (See Sheet C3) acnl,m JFz-=r D"