HomeMy WebLinkAboutAgenda Report - March 5, 1986 (95)CITY COUW1, K= -ENG MARCR 5, 1986 AWARD CCV17RA-r - pt1;hlC sAFE.'PY BUUD1NG AIR ODMITIONER CONDENSER REs. NG. 8b-34 Citv Manager Peterson presented the following bids which had +beer, received for the removal and replacement of the OC -12 (d) public Safety Building Air Conditioning Cu denser: Lang`s Enterprises, $12,019.97 Energy Wise AIC, $13,900.00 Industrial Refrigeration Co., $16,934.00 Camercia'_ Air, $16,975.00 Henderson Bros., $17,283.00 CITY OF ii cauyciL COMMUNICATION ATIox PUBLIC WORKS DEPARTMENT TO: City Council FROM: City Manager DATE: February 26, 1986 SUBJECT: Remove & Replace Public Safety Building Air Conditioning Condenser Proiect Data Originally Budgeted: 1986 Budgeted Fund: General Fund 121-350.57-519 Amount Budgeted: $12,500 Total Project Estimate: $16,000 Over -run Fund: General Fund RECOMMENDED ACTION: That the City Council award the contract for :he above p-oject to Energy Wise Air Conditioning of Stockton in the amount of $13,900 and release the lowest bidder, Lang Enterprises of Modesto from all contract responsibilities. BACKGROUND INFORMATION: This project includes the removal, relocation, and re- placement of air conditioning condenser Unit N2 at the Public Safety Building. Plans and specifications for this project were approved on February 5, 1986. The City has received the following 5 bids for this project: BIDDER LOCATION BID Lang's Enterprises Modesto $12,019.97 Energy Wise A/C Stockton 13,900.00 Industrial Refrigeration Co. Modesto 16,934.00 Commercial Ai. Modesto 16,975.00 Henderson Bros. Lodi 17,283.00 Engineer's Estimate 9,060.00 The contract was originally awarded to the low bidder, Lang's Enterprises, on February 19, 1986. Since that time, the low bidder has discovered a major error in his bid and because of that error, wishes to be relieved of his responsibility. A copy of the reyuc-;t is attached. This department has checked with the second low bidder who is willing to proceed on the basis of the bid submitted of $13,900 as rapidly as possible. We have checked with the City Attorney and with his concurrence are making the X eco ndation. Ronsko Public Works Director cc: Assistant Finance Director Richard Wiech OVEb: FILE NO. THOMAS A. PETERSON, City Manager - --ME, 7ANICAL CONTriXiCiOR_ r,HEET MF T A'. HEAT 1w5JL A N - STAINLESS STEEL A1R CONCu,:�nuaC, RESIAURAIiT EOOPME`:T MILLWRICMH . FIRE PROTF: T)C�4 EQUIP .LENT AIR POLLUTK?% CONTROL P:UMEUN'v •STRUCTUP.AL STFFL - INC. INDUSTRIAL P%ft* _ P_O_ BOX 4006 — 301 NO_ WASHINGTON — MODESTO. CALIFORNIA 95352 — PHONE 529-0136 February 25, 1986 RFr_r-9%,1PD Glen Robinson CITY OF LOD] Lodi City Council Lodi City Hall MMLtC vMKS DEPARTMENT 221 West Pine Street Call Box 3006 Lodi, CA 95241-1910 SM ECT: Public Safety Building, Evaporative Condenser Replacement Dear Sirs: As per your phone call request see attached copy of our bid form. NOTE: 1. We forgot to sign the bid form. 2. We inadvertently did not include the cost of new Evaporative Condenser. Reason being we had called the two sources you specified. Neither supplier which we deal with responded with quotes, after several calls. Our procedure is to li;t major equipment on our cap sheet which we did not do. When our equipment supplier called the next morning after bid opening with late quote, we discovered our error. It is due to the above errors that we ask your favor to release us from this contract at no cost. PLEASE NOTE: For your information we were told to include the freon and suction line filters that will be required to replace the Evaporative Condenser. Allowed 300 Lb. R-22 four (4) suction line filters. EVAPORATIVE CONDENSER ADD.....................................$8,585.00 Respectfully, 4ig P. Lang President DPL./lh RESIDENT AL COMMERCIAL INDUSTRIAL 0 WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, .sealed bids were received and publicly opened by the City Clerk of this City on February 19,- 1986 at 11:00 a.m. for the contract for remove and replace public safety building air conditioning condenser as described in the specifications therefor approved by the City Council February 5, 1986; and WHEREAS, said bids have been compared, checked, and tabulated and a report thereof filed with the City Manager as follows: Bidder Amount Lang's Enterprises $12,019.97 Energy Wise A/C 13,900.00 Industrial Refrig. Co. 16,934.00 Cozwercia.l Air 16, 975.00 Henderson Bros. 17,283.00 WHEREAS, it has been determined that the low bidder, Lang's Enterprises has discovered a major error in his bid and because of that error, wishes to be relieved of his responsibility. WHEREAS, the City Manager recommends that award be made to the second low bidder, Energy Wise Air Conditioning in°the amount of $13,900.- NOW, THEREFORE, BE IT RESOLVED by the City Council -of the City of Lodi that award of contract for Remove and Replace Public Safety Building Air Conditioning Condenser be and the same is hereby made'to Energy Wise Air Conditioning ,` the second low bidder in the amount of $13,900. NOW, THEREFORE, BE IT FURTHER RESOLVED by. the City Councilof the City of Lodi that the low bidder, Lang's Enterprises is hereby released from all contract responsibilities. Dated: March 5, 1986 I hereby certify that Resolution No. 86-34 was passed and adopted by the City Council of the City of Lodi in a regular meeting held March 5, 1986 by the following vote: Alice M. Rei.mche City Clerk 86-34