HomeMy WebLinkAboutAgenda Report - March 2, 1983 (26)LL 1 1 M REM1 V 1..111
FRCM SPARC RE
CONCEFdJS AT HAM
AND 7rJW
INTERSKI'ION City Clerk Reimche presented the following letter which
had been received from the Site Plan and Architectural
Review Cc=ittee:
Lodi Site Plan and Architectural Review Committee would
like to convey to the City Council their concern about the
growing traffic problem at the intersection of Tokay Street
and Ham Lane. At a recent meeting, the Cenrittee reviewed the
plans for the Bank of Lodi, which will be located at the
southwest corner of this intersection..
During the review of the Bark of Lodi project, there were
numerous concerns expressed about the hazardous situation that
exist at that intersec:.ion. The consensus was that the
intersection presented hazards for bath vehicles and
pedestrians attempting to cross or turn at this intersection.
It was the feeling of the Ccnm ttee that the problem would
increase as the Bank of Lodi, and other offices planned for
the west side of Ham Lane are constructed.
The Ccm dt:.ee is aware that a traffic signal is listed in the
Capital Improvement Plan. The CcaTnittee would like to request
that the City consider iiistalling the traffic signal and a
crosswalk at the earliest possible date. I£ the signals could
be installed this year, .it would coincide with the
construction of the Bank and other offines planned for the
area. Without the signals, the increased traffic will only
add to the existing hazardous situation.
Thank you for your consideration of this matter".
0
7("N" 1rx c
a K
i-+ P
LL 1 1 M REM1 V 1..111
FRCM SPARC RE
CONCEFdJS AT HAM
AND 7rJW
INTERSKI'ION City Clerk Reimche presented the following letter which
had been received from the Site Plan and Architectural
Review Cc=ittee:
Lodi Site Plan and Architectural Review Committee would
like to convey to the City Council their concern about the
growing traffic problem at the intersection of Tokay Street
and Ham Lane. At a recent meeting, the Cenrittee reviewed the
plans for the Bank of Lodi, which will be located at the
southwest corner of this intersection..
During the review of the Bark of Lodi project, there were
numerous concerns expressed about the hazardous situation that
exist at that intersec:.ion. The consensus was that the
intersection presented hazards for bath vehicles and
pedestrians attempting to cross or turn at this intersection.
It was the feeling of the Ccnm ttee that the problem would
increase as the Bank of Lodi, and other offices planned for
the west side of Ham Lane are constructed.
The Ccm dt:.ee is aware that a traffic signal is listed in the
Capital Improvement Plan. The CcaTnittee would like to request
that the City consider iiistalling the traffic signal and a
crosswalk at the earliest possible date. I£ the signals could
be installed this year, .it would coincide with the
construction of the Bank and other offines planned for the
area. Without the signals, the increased traffic will only
add to the existing hazardous situation.
Thank you for your consideration of this matter".
0
'"_
67'_7
MEMORANDUM, Ci'y of Lfcd,g,FRm"ni4y R.ehIlopment Department
fh. R E rt"ilrl4:
CITY CLERK
TO: MEMBERS OF THE j-.Vq�-- ( It" COUNC 1 L
FROM: SITE PLAN AND ARCHITECTURAL REVIEW COMMITTEE
DATE: FEBRUARY 16, 11983
SUBJECT: TRAFFIC PROBLEM AT HAM LANE/TOKAY STREET INTERSECTION
The Lodi Site Plan and Architectural Review Conanittee would Iike to convey
to the C7ty Council their concern about the growing traffic problem at
the intersection of Tokay Street and Ham Lane. At a recent meeting, the
Com; ttee reviewed the plans for the Bank of Lodi, which will be located
at the southwest corner of this intersection.
During the review of the Bank of Lodi praject, there were numerous concerns
expressed about the hazardous situation, that exist at that intersection.
The consensus was that the intersection presented hazards for both vehicles
and pedcstrians attempting to cross or turn at this intersection. It
was the feeling of the Committee that the problem would increase as the
Bank of Lodi,and other offices planned for the west side of i'am Lane are
constructed.
The Committee is aware that a traffic signal is listed in the Capital
Improvement Plan. The Committee would like to request that the City con-
sider installing the traffic signal and a crosswalk at the earliest possible
Cate. If the signals could be installed this year, it would coincide with
the construction of the Bank and other offices planned for the area.
Without the signals, the increased tr,-rfic .riII only add to the existinq
hazardous situation.
Thank you for your consideration of this matter.