Loading...
HomeMy WebLinkAboutAgenda Report - March 2, 1983 (26)LL 1 1 M REM1 V 1..111 FRCM SPARC RE CONCEFdJS AT HAM AND 7rJW INTERSKI'ION City Clerk Reimche presented the following letter which had been received from the Site Plan and Architectural Review Cc=ittee: Lodi Site Plan and Architectural Review Committee would like to convey to the City Council their concern about the growing traffic problem at the intersection of Tokay Street and Ham Lane. At a recent meeting, the Cenrittee reviewed the plans for the Bank of Lodi, which will be located at the southwest corner of this intersection.. During the review of the Bark of Lodi project, there were numerous concerns expressed about the hazardous situation that exist at that intersec:.ion. The consensus was that the intersection presented hazards for bath vehicles and pedestrians attempting to cross or turn at this intersection. It was the feeling of the Ccnm ttee that the problem would increase as the Bank of Lodi, and other offices planned for the west side of Ham Lane are constructed. The Ccm dt:.ee is aware that a traffic signal is listed in the Capital Improvement Plan. The CcaTnittee would like to request that the City consider iiistalling the traffic signal and a crosswalk at the earliest possible date. I£ the signals could be installed this year, .it would coincide with the construction of the Bank and other offines planned for the area. Without the signals, the increased traffic will only add to the existing hazardous situation. Thank you for your consideration of this matter". 0 7("N" 1rx c a K i-+ P LL 1 1 M REM1 V 1..111 FRCM SPARC RE CONCEFdJS AT HAM AND 7rJW INTERSKI'ION City Clerk Reimche presented the following letter which had been received from the Site Plan and Architectural Review Cc=ittee: Lodi Site Plan and Architectural Review Committee would like to convey to the City Council their concern about the growing traffic problem at the intersection of Tokay Street and Ham Lane. At a recent meeting, the Cenrittee reviewed the plans for the Bank of Lodi, which will be located at the southwest corner of this intersection.. During the review of the Bark of Lodi project, there were numerous concerns expressed about the hazardous situation that exist at that intersec:.ion. The consensus was that the intersection presented hazards for bath vehicles and pedestrians attempting to cross or turn at this intersection. It was the feeling of the Ccnm ttee that the problem would increase as the Bank of Lodi, and other offices planned for the west side of Ham Lane are constructed. The Ccm dt:.ee is aware that a traffic signal is listed in the Capital Improvement Plan. The CcaTnittee would like to request that the City consider iiistalling the traffic signal and a crosswalk at the earliest possible date. I£ the signals could be installed this year, .it would coincide with the construction of the Bank and other offines planned for the area. Without the signals, the increased traffic will only add to the existing hazardous situation. Thank you for your consideration of this matter". 0 '"_ 67'_7 MEMORANDUM, Ci'y of Lfcd,g,FRm"ni4y R.ehIlopment Department fh. R E rt"ilrl4: CITY CLERK TO: MEMBERS OF THE j-.Vq�-- ( It" COUNC 1 L FROM: SITE PLAN AND ARCHITECTURAL REVIEW COMMITTEE DATE: FEBRUARY 16, 11983 SUBJECT: TRAFFIC PROBLEM AT HAM LANE/TOKAY STREET INTERSECTION The Lodi Site Plan and Architectural Review Conanittee would Iike to convey to the C7ty Council their concern about the growing traffic problem at the intersection of Tokay Street and Ham Lane. At a recent meeting, the Com; ttee reviewed the plans for the Bank of Lodi, which will be located at the southwest corner of this intersection. During the review of the Bank of Lodi praject, there were numerous concerns expressed about the hazardous situation, that exist at that intersection. The consensus was that the intersection presented hazards for both vehicles and pedcstrians attempting to cross or turn at this intersection. It was the feeling of the Committee that the problem would increase as the Bank of Lodi,and other offices planned for the west side of i'am Lane are constructed. The Committee is aware that a traffic signal is listed in the Capital Improvement Plan. The Committee would like to request that the City con- sider installing the traffic signal and a crosswalk at the earliest possible Cate. If the signals could be installed this year, it would coincide with the construction of the Bank and other offices planned for the area. Without the signals, the increased tr,-rfic .riII only add to the existinq hazardous situation. Thank you for your consideration of this matter.