HomeMy WebLinkAboutAgenda Report - February 20, 2013 C-07AGENDA ITEM Cl CITY OF LODI COUNCIL COMMUNICATION TM AGENDA TITLE: Adopt Resolution Authorizing City Manager to Execute Contract for Well No. 19 Improvements with Layne Christensen, of Woodland ($90,864) and Appropriating Funds ($100,000) MEETING DATE: February 20, 2013 PREPARED BY: Public Works Director RECOMMENDED ACTION: Adopt resolution authorizing City Manager to execute contract for Well No. 19 improvements with Layne Christensen, of Woodland, in the amount of $90,864, and appropriating funds in the amount of $100,000. BACKGROUND INFORMATION: City Water Well No. 19, located at 601 West Harney Lane, was constructed in June 1980 and produces approximately 1,200 gpm of high-quality water. The well was taken off-line in August 2012 due to failure of the pump. An inspection of the well and pumping equipment was conducted in August 2012 by Layne Christensen Company. This inspection found that two of the intermediate bowl assemblies are excessively worn, the pump shaft requires replacement and the suction impeller is damaged. The cost to repair these assemblies would likely exceed the cost of replacing the pump and pump assemblies. The inspection also identified medium to heavy build-up of growth in the louvered screens at the 330 -foot depth that need to be cleaned prior to the well being placed back in service. This project consists of installing a new submersible well pump, replacing the column pipe, cleaning the screens, and start-up testing of the system. Specifications for this project were approved on November 21, 2012. The City received the following two bids for this project on February 4, 2013. The project estimate for this project was $100,000. Bidder Location Bid Layne Christensen Company Woodland $90,864 Eaton Pumps Woodland $106,700 FISCAL IMPACT: There will be no change in operations costs. FUNDING AVAILABLE: Requested Appropriation: Water Capital Fund (181050) - $100,000 ordan Ayers Deputy City Manager/Internal S ices Director F. Wally ndelin Public Works Director Prepared by Kathryn Garcia, Compliance Engineer FWS/KMG/pmf Attachments cc: Deputy Public Works Director —Utilities Utilities Superintendent Compliance Engineer Konradt Bartlam, City Manager KAWPWOUNC IU2013\Well 191mprovements_Award.doc 2/11/2013 WELL NO. 19 PUMPING EQUIPMENT CONTRACT REPLACEMENT AND IMPROVEMENTS PAGE 1 CITY OF LODI, CALIFORNIA THIS CONTRACT, made by and between the CITY OF LODI, State of California, herein referred to as the "City" and LAYNE CHRISTENSEN COMPANY, herein referred to as the "Contractor." WITNESSETH: That the parties hereto have mutually covenanted and agreed, and by these presents do covenant and agree with each other, as follows: The complete contract consists of the following documents, which are filed in the Public Works Department, which are incorporated herein by this reference, to -wit: Notice Inviting Bids Information to Bidders General Provisions Special Provisions Bid Proposal Contract Contract Bond The July 1992 Edition Standard Specifications, State of California Business and Transportation Agency, Department of Transportation All of the above documents, sometimes hereinafter referred to as the "Contract Documents," are intended to cooperate so that any work called for in one and not mentioned in the other is to be executed the same as if mentioned in all said documents. ARTICLE I - That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the City and under the condition expressed in the two bonds bearing even date with these presents and hereunto annexed, the Contractor agrees with the City, at Contractor's cost and expense, to do all the work and furnish all the materials except such as are mentioned in the specifications to be furnished by the City, necessary to construct and complete in a good workmanlike and substantial manner and to the satisfaction of the City the proposed improvements as shown and described in the Contract Documents which are hereby made a part of the Contract. ARTICLE II - The City hereby promises and agrees with the Contractor to employ, and does hereby employ, the Contractor to provide all materials and services not supplied by the City and to do the work according to the terms and conditions for the price herein, and hereby contracts to pay the same as set forth in Section 5.600, "Measurement, Acceptance and Payment," of the General Provisions, in the manner and upon the conditions above set forth; and the said parties for themselves, their heirs, executors, administrators, successors and assigns, do hereby agree to the full performance of the covenants herein contained. ARTICLE III - The Contractor agrees to conform to the provisions of Chapter 1, Part 7, Division 2 of the Labor Code. The Contractor and any Subcontractor will pay the general prevailing wage rate and other employer payments for health and welfare, pension, vacation, travel time, and subsistence pay, apprenticeship or other training programs. The responsibility for compliance with these Labor Code requirements is on the prime contractor. KAWP\COUNCIU2013\Well 19 Pump Replacement 2012 - Contract.doc 02/11/2013 WELL NO. 19 PUMPING EQUIPMENT CONTRACT REPLACEMENT AND IMPROVEMENTS PAGE 2 ARTICLE IV - And the Contractor agrees to receive and accept the following prices as full compensation for furnishing all materials and for doing all the work contemplated and embraced in this agreement; also for all loss or damage arising out of the nature of the work aforesaid or from the action of the elements, or from any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution of the work until its acceptance by the City, and for all risks of every description connected with the work; also for all expenses incurred by or in consequence of the suspension or discontinuance of work and for well and faithfully completing the work, and the whole thereof, in the manner and according to the Plans and Contract Documents and the requirements of the Engineer under them, to -wit: Perform the work necessary for well rehabilitation and the installation of a new submersible well pump, replacement of column pipe, cleaning of the screens, system start-up testing and includes other incidental and related work as shown in the specifications. The quantity shown for bidding purposes has been approximated. Actual payment for the work will be determined by field measurements of the work completed. The Contractor shall have at least five years experience in the installation and maintenance of deep well submersible turbine pumps. Well 19 Pumping Equipment Replacement and Improvements BID PROPOSAL BID ITEM 1: WELL REHABILIATION The work consists of the removal of deposits distributed throughout the perforated sections of the well as described in Section 6 of the Specifications. ITEM # DESCRIPTION QTY 11 MT; UN1T PRICE TOTAL PRICE . 1 Mobilization, Demobilization and Site Clean 1 Lump $ 5,500.00 $ 5,500.00 up Sum 2 Bail & Roto-Scrub/Louvered Screen 1 Lump $ 3,500.00 $ 3,500.00 cleaning Sum 3 Chemical Treatment 1 Lump $ 6,000.00 $ 6,000.00 Sum 4 Well Redevelopment by Surge Block and 1 Lump $ 8,500.00 $ 8,500.00 Airlift I Sum 5 Video Well 1 I Lump $ 900.00 $ 900.00 Sum TOTAL $ 24,400.00 BID ITEM 2: WELL PRODUCTION PUMPING EQUIPMENT INSTALLATION The work consists of the installation of a new submersible pump and motor, replacement of column pipe and system start-up testing as described in Section 6 of the Specifications. K:\ MOUNCIL2013\Well 19 Pump Replacement 2012 - Contractdoc 02/11/2013 WELL NO. 19 PUMPING EQUIPMENT CONTRACT REPLACEMENT AND IMPROVEMENTS PAGE 3 ITEM # DESCRIPTION QTY _UNIT. . UNIT PRICE: YTOTAL PRICE ... 1 Mobilization, Demobilization and Site Clean 1 Lump $ 5,050.00 $ 5,050.00 up Sum 2 Pump Installation 1 Lump $ 1,900.00 $ 1,900.00 Sum 3 Gould 4 -Stage Submersible Pump (14RJLC) 1 EA $ 10,600.00 $ 10,600.00 4 10" Hitachi 125 HP, 480v, 3 PH, 1,800 rpm 1 EA $ 40,650.00 $ 40,650.00 5 Installation 10" x 20' Taper Drop Pipe 8 EA (includes all associated materials) $ 908.00 $ 7,264.00 6 Testing-SystemSta rt -up 1 Lump $ 1,000.00 $ 1,000.00 Sum TOTAL $ 66,464.00 References must be submitted with bid proposal as described in Section 2.1400. The Contractor shall furnish the Engineer with a statement from the vendor that the order for the materials required for this contract has been received and accepted by said vendor. Said- statement shall be furnished within 15 days after receiving notice that the contract has been approved by the City Council and shall give the date that the control equipment will be shipped. ARTICLE V - By my signature hereunder, as Contractor, I certify that I am aware of the provisions of Section 3700 of the,* Labor Code, which requires every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract. ARTICLE VI - It is further expressly agreed by and between the parties hereto that, should there be any conflict between the terms of this instrument and the Bid Proposal of the Contractor, then this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said proposal conflicting herewith. ARTICLE VII - The City is to furnish the necessary rights-of-way and easements and to establish lines and grades for the work as specified under the Special Provisions. All labor or materials not mentioned specifically as being done by the City will be supplied by the Contractor to accomplish the work as outlined in the specifications. ARTICLE VIII - The Contractor agrees to commence work pursuant to this contract within 15 calendar days after the City Manager has executed the contract and to diligently prosecute to completion within: Thirty (30) Working Days after receipt of the Notice to Proceed. KAWPIC0UNCIL\20131Well 19 Pump Replacement 2012 - Contract.doc 02/11/2013 WELL NO. 19 PUMPING EQUIPMENT REPLACEMENT AND IMPROVEMENTS CONTRACT PAGE 4 WHEN SIGNING THIS CONTRACT, THE CONTRACTOR AGREES THAT THE TIME OF COMPLETION FOR THIS CONTRACT IS REASONABLE AND THE CONTRACTOR AGREES TO PAY THE CITY LIQUIDATED DAMAGES AS SET FORTH IN SECTION 6-04.03 OF THE SPECIAL PROVISIONS. CONTRACTOR AGREES THAT THIS AMOUNT MAY BE DEDUCTED FROM THE AMOUNT DUE THE CONTRACTOR UNDER THE CONTRACT. IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands the year and date written below. CONTRACTOR Authorized Signature Title TYPE OF ORGANIZATION Individual, Partnership or Corporation Address CITY OF LODI a Municipal corporation Konradt Bartlam City Manager Attest: Randi Johl, City Clerk Approved as to Form: D. Stephen Schwahauer City Attorneycm Dated: (Affix corporate seal if Corporation) I ) Telephone KAWP\C0UNCIL\2013\Well 19 Pump Replacement 2012 - Contract.doc 02/11/2013 1. AA# 2. JV# ;CITY-OFLODI AO ROMATION ADJUSTMENT REQUEST:.. 3 ."' TO: Int9mW Services Dept - BudpQ DtVWm 3. FROM: Rebecca Areida-Yadav 1.5. DATE: 02/05/2013 4. DEPARTMENT/DIVISION: Public Works 181 3205 Fund Balance 100 000.00 CARQ[IE1T: OFAPPFtCP iFAT1E 1.10. E ESQ B�LQW _ - FUND # BUS, UNIT # ACCOUNT # ACCOUNT TITLE AMOUNT A. SOURCE OF FINANCING 181 3205 Fund Balance 100 000.00 B. USE OF FINANCING 181 181050 1825.2000 Well 19 $ 100 000.00 Please provide a description of the project, the total cost of the project, as well as justification for the requested adjustment. If you need more space, use an additional sheet and attach to this form. Contract for pumping equipment replacement and improvments at Well 19 with Layne Christenson. If Council has authorized the appropriation adjustment, complete the following: Meeting Date: Res No: Attach copy of resolution to this form. Department Head Signature: 8. APPROVAL.SIGNATURES- Deputy City Manager/Internal Services Manager Date Submit completed form to the Budget Division with any required documentation - Final approval will be provided in electronic copy format. RESOLUTION NO. 2013-14 A RESOLUTION OF THE LODI CITY COUNCIL AUTHORIZING THE CITY MANAGER TO EXECUTE CONTRACT FOR THE WELL NO. 19 IMPROVEMENTS PROJECT AND FURTHER APPROPRIATING FUNDS WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened on February 4, 2013, at 11:00 a.m., for the Well No. 19 Improvements Project, described in the specifications therefore approved by the City Council on November 21, 2012; and WHEREAS, said bids have been checked and tabulated and a report thereof filed with the City Manager as follows: Bidder Bid Layne Christensen Company $90,864 Eaton Pumps $106,700 WHEREAS, staff recommends awarding the contract for the Well No. 19 Improvements Project to the low bidder, Layne Christensen Company, of Woodland, California, in the amount of $90,864. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby award the contract for the Well No. 19 Improvements Project to the low bidder, Layne Christensen Company, of Woodland, California, in the amount of $90,864; and BE IT FURTHER RESOLVED that the City Manager is hereby authorized to execute the contract on behalf of the City of Lodi; and BE IT FURTHER RESOLVED that funds in the amount of $100,000 be appropriated for this project from the Water Capital Fund. Dated: February 20, 2013 I hereby certify that Resolution No. 2013-14 was passed and adopted by the City Council of the City of Lodi in a regular meeting held February 20, 2013, by the following vote: AYES: COUNCIL MEMBERS — Hansen, Katzakian, Mounce, and Mayor Nakanishi NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS —Johnson ABSTAIN: COUNCIL MEMBERS — None eRAI J HH L City Clerk 2013-14