Loading...
HomeMy WebLinkAboutAgenda Report - January 18, 1984 (26)CITY COUNCIL MEETING JANUARY 18, 1984 7� W-13 W. 84-006 Fol l(winq introduction of the rrk-rtter by Staff, on mot inn (-,i Counc i 1 Merber Pinkerton, Reid second, Counc i 1 adopted FAU PRDTFXT Resolution No. 84-006 authorizinq t -he City K -merger to MY 314 (i) execute all necessary docurrt nts for FAU 1'rojf'c't MY 314 (1) , ,A)LMI STfX7K"rrN South Stockton Street, Kett levan L,,uv-- to T M i Avenue. The StREFT , }G:'I'I'I.FT'li1N m. t i on carried by i man is mu s vote. ANF 'M 1 CU I AVE. , .4T `: x ,- :x J �r .0 .;4 it Right -of -Way Certification Format A CITY OF LODI Date MY 314 (1) Federal Aid - Urban South Stockton Street Kettleman Lane to Tokay Street All required right-of-way for construction of this project has now been acquired, covered by Right -of -Entry or Order of Possession. as set forth in detail below: 1. STATUS OF RIGHT-OF-WAY ACQUISITION a. Total number of parcels required b. Parcels acquired outright c. Parcels covered by right -of -entry or order {or possession. 2. STATUS OF AFFECTED RAILROAD FACILITIES 3. DESIGNATED MATERIAL SI1ZS 4. DF.SIGNATED DISPOSAL AREAS S. STATUS OF UTILITY RELOCATION A. Status of Relocation Company Type Facility City of Lc•di Water Sewer Electric Storm Dra i -n Pacific Telephone Telephone Lodi Cable TV Cable TV PGb E Gas 27 26 1 (January 1. 1984) None None None Relocation Type lower main (underway) none retocat: poles (underway) none relocate poles (underway with power; relocate poles (underway with tower) portions of gas main to be lowered - design underway B. High and Low Risk This will be a locally administered project and I certify that City of Lodi has been informed in writing of Caltrans high and low risk underground facilities polity. 1 am aware that the State assumes no liability for compliance or noncompliance with said policy. 6. SCHEDULE FOR REMOVAL OF IMPROVEMENTS AND OBSTRUCTIONS - Not applicable 7. UNAUTHORIZED ENCROACHMENTS - None i0 8. COMPLIANCE WITH FEDERAL AND STATE REQUIREMENTS REGARDING THE ACQUISITION OF REAL PROPERTY All right-of-way has been acquired in accordance with Title 111 of the Federal Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970 (Public Law 91-646) and all applicable current FHWA directives covering the acquisition of real property. 9. COMPLIANCE WITH RELOCATION ADVISORY ASSISTANCE AND PAYMENTS PROVISIONS OF FEDERAL AND STATE LAW The project has no occupied parcels. and all persons have been relocated to decent, safe and sanitary housing or have been offered decent, safe and sanitary housing in accordance with the current FHWA regulations. No person displaced by this project has been required to vacate without at least 90 days written notice. The project did not involve the displacement of any Individuals, farms or businesses. 1 HEREBY CERTIFY the right-of-way on this project a; conforming to Statement No. ( 2 ) of Paragraph Sc of FHPM 6-4-2-1. CITY OF LODI By Da to