HomeMy WebLinkAboutAgenda Report - January 16, 1985CITY OF LODI
PUBLIC WORKS DEPARTMENT
TO: City Council
FROM: City Manager
DATE: January 11, 1985
SUBJECT: Reimbursement Resolution
RECOMMENDED ACTION: That the City Council:
COUNQ7IL COMMUNICATdON
1. Adopt a resolution calling for reimbursement to the City of Lodi for
.installation of a water main in Beckman Road; and
2. Adopt a resolution authorizing the City Manager to sign future Water
Main and Sanitary Sewer extension reimbursement agreements calling
for reimbursement to the City.
BACKGROUND INFORMATION: The City of Lodi constructed 994 feet of 10 -inch
water line in Beckman Road from 950' south of Vine Street to 600' south of
Vine Street. In order to loop the system and provide the water main along the
C Basin frontage, which is the City's responsibility, the line was constructed
from a point 347' south of the Basin which is covered by this agreement. (Exhibit A).
Work was completed by Anderson Pipeline Construction and this resolution
sets forth the reimbursement amount as outlined in Ordinance No. 1136. The
agreement takes into consideration the difference between the cost of the
10" and 8" watermain.
The City Manager was authorized to sign Water Main and Sanitary Sewer Extension
Reimbursement Agreements for developers sometime ago. This will now allow him to
sign for reimbursement to the City.
r.
1 L. Ronsk
1 is Works Director
JLR/SB/eeh
Attachments
APPROVED:
HENRY A. CLAVES, City Manager
FILE NO.
. T. -11:
[14�
1 Q
NOTES=
1. Water Main extension -shown on
2- Reimbursement charge per front foot
a/ _
3. �i/� XFront footage charge.
B�—C1<1WA/V /;�OA.D
1A/ATCD KAAIAI �YTF 1�fCiClt�l
I
I
�i
= fI
� 1
0
IQ
i
W ;
O
Q-
i z
_ � a
a I�i
, R
xLURES
i,o 'ST:.\ t
OR)
L? 6
—}� :E
0 50 too
I
Q i
15zn
SCALE
Drawn Mo Dote approved Approved By EXHIBIT A
Checked Water Main Extension
Reimbursement
Cat# 9uDtle works Director Dote agreement NO..�--.--
IRCE
RESOUMI(N NO. 85-06
RESOLUrICN CALLING FCR REIB'BURSHMUSIr TO THE CITY
OF LCDI FM INSTALLATICN OF A WATER LINE IN
13EC7MM RUAD, 950' SCM OF VINE STRF..LT TO 600'
SCUM OF VINE STREET, SCUM OF CITY OF L 1DI
DRAINAGE BASIN "C" AND AIJIHMIZING THE CITY
MANAGER 'M EXBCUIE FUnM WATER MAIN AND SANITARY
SEi1'ER. EMNSICN AGREHVWM CALLING FCR REIPMURSEVEgr
TO THE CITY
MERF.AS, the City of Lodi heretofore adopted Ordinance No. 1136-,
which ordinance provides for the reimbursement to developers of utility lines
when benefits will result from said installation to other property owners; and
MM -ZEAS, the City of Lodi has installed an extension of the water
line in Becknan Road, 950' south of Vine Street to 600' south of Vine Street,
south of City of Lodi Drainage Basin "C";
WIM AS, the extended location of said extension is shown on
Exhibit A attached hereto and by this reference made a part hereof.
NOW, THERUME, BE IT RESOLVED by the City Council of the City of
Lodi that in the event any of the abutting property owners shown on Exhibit A
attached hereto develop and/or connect to the water extension line installed as
shown on City of Lodi drawing 84D48 and said connection is made, then the City
shall collect from the developers of the abutting property owners, a sum based
upon a charge of $25.91 per front foot, which front foot cost has been
determined by the Public Works Director to be the proper charge, all in
accordance with said Ordinance 1136.
NOW, TIRMFCRE, BE IT R RIHER RESOLVED by the City Counei 1 of the
City of Lodi that the City Manager is hereby authorized to execute future water
main and sanitary sewer extension reimbursement agreements calling for
reimbursement to the city.
Dated: January 16, 1985
I hereby certify that Resolution No. 85-06
was passed and adopted by the City Council
of the City of Lodi In a regular meeting
held January 16, 1985 by the following vote:
Ayes: Council Byers - Hinchman, Olson, Reid
Pinkerton & Snider (B7ayor)
Noes: Council Members - None
Absent: Council BVkvbers - None
Let, �- - 4o44j
Alice M. Reimche
City Clerk
85-06
r CITY OF LOD1
PUBLIC WORKS DEPARTMENT
COST ESTIMATE
FOR
REIMBURSEMENT
BECKMAN ROAD WATER MAIN
950' S/VINE STREET TO 600'
S/VINE STREET
COST OF WATER MAIN EXTENSION
( Contract
i
s
Prices Less Difference in Material
Costs
between 10" and 8".)
993.5 LF
10" Water Main
@
$ 15.71
$
15,607.89
38 LF
10" Water Main (in casing)
@
$ =21.91
832.58
8.5 LF
6" Water Main
@
$ 8.00
68.00
4 EA
10" Water Valves@
$ 552.49
2,209.96
1 EA
6" Water Valve
@
$ 375.00
375.00
1 EA
Fire Hydrant
@
$1,000.00
1,000.00
1 EA
Blow Off
@
$ 250.00
250.00
38 LF
18" Pipe Casing
@
$ 50.00
1,900.00
Lump Sum
Excavation Safety
@
$ 200.00
200.00
Sub
Total
$
22,443.43
10% Engineering
6
Administration
2,244.34
Total
$
24,687.77
COST OF WATER MAIN PER FRONT FOOT
$24,687.77
= $25.91/Front
953
Foot
REIMBURSABLE AMOUNT
(347 FT) ($25.91) = $8,990.77
say
$
9,000.00
i
CITY OF LODI
COUNCIL COMMUNISATION
PUBLIC WORKS DEPARTMENT
TO: City Council
FROM: City Manager
DATE: May 15, 1985
SUBJECT: Acceptance of "Well Drilling;.Well 611
128 Mission Street"
RECOMMENDED ACTION: That the City Council accept the improvements in "Well
Drilling, Well R, 128 Mission Street" and direct the Public Works Director
to file a Notice of Completion with the County Recorder's office.
BACKGROUND INFORMATION: The contract was awarded to Cal Water Drilling Co.
of Turlock on September 5, 1984, in the amount of $40,143. The contract has
been completed in substantial. conformance with the plans and specifications
approved by the City Council.
The contract completion date was December 2, 1984, and the actual completion
date is May 9, 1985. The final contract price was $42,123. The differenf:e
between the contract amount and the final contract price is due to increased
well develo rnent time and modification of well casing due to availability.
Ja k L. Ronsko '
Fu 1 is Works Director
a
JL /eeh r
APPROVED: y --, FILE NO.