HomeMy WebLinkAboutAgenda Report - January 16, 1985 (67)FINDINGS AND
MITIGATING
MEASURES FCR
HAM LANE IbffTOVE-
b
bPROJECT`
�I AVENUE TO
EllM4 STREET
APPEAL Fes, S. J.
REOLM TO RECCED
SPECIFIC PLANS
Following introduction of the matter by Staff; Council, on
motion of Council barber Reid, Hinchman second, adopted the
following findings and mitigating measure for 1985 Ham Lane
Improvement Project, Lodi Avenue to Elm Street.
FINDINGS AMID MITIGATING MEASURES
Fri,
1985 Ham Lane Improvements Project
Lodi Avenue to Elm Street
1. The Ham Lane Improvement Project for the 1985 Capital
Improvements Program shall consist of Alternate B-1 which is
widening to the ultimate width on the west side only (40 ft.
west of the centerline).
2. The present Master Plan for Ham Lane - 80 ft. total
ultimate width, centered on the centerline - is retained for
future development. This shall be re-recorded so that it
will not be overlooked by Title Corrpanies preparing title
reports on future sales on the east side of Ham Lane.
3. The City of Lodi finds that the significant impacts of
the proposed project - loss of trees and landscaping,
construction noise and change in neighborhood character are
mitigated to a moderate level by the measures described in
Item 5 below and the adoption of Alternate B-1.
f 4. The City of Lodi finds that the significant impact -
noise - cannot be mitigated to a less significant level with,
or without the project or any of the alternatives, and that
the need to provide for orderly traffic flow in the City
overrides this impact.
5. The following mitigation measures shall be included in
the project in order to reduce the environmental irpact of
the project:
a. Trees within the undeveloped portion of the street
right-of-way shall be retained wherever practical, and to
that end, that the sidewalk width be reduced from five feet
to four feet in the V;o;n;txr of �••----