Loading...
HomeMy WebLinkAboutAgenda Report - January 16, 1985 (67)FINDINGS AND MITIGATING MEASURES FCR HAM LANE IbffTOVE- b bPROJECT` �I AVENUE TO EllM4 STREET APPEAL Fes, S. J. REOLM TO RECCED SPECIFIC PLANS Following introduction of the matter by Staff; Council, on motion of Council barber Reid, Hinchman second, adopted the following findings and mitigating measure for 1985 Ham Lane Improvement Project, Lodi Avenue to Elm Street. FINDINGS AMID MITIGATING MEASURES Fri, 1985 Ham Lane Improvements Project Lodi Avenue to Elm Street 1. The Ham Lane Improvement Project for the 1985 Capital Improvements Program shall consist of Alternate B-1 which is widening to the ultimate width on the west side only (40 ft. west of the centerline). 2. The present Master Plan for Ham Lane - 80 ft. total ultimate width, centered on the centerline - is retained for future development. This shall be re-recorded so that it will not be overlooked by Title Corrpanies preparing title reports on future sales on the east side of Ham Lane. 3. The City of Lodi finds that the significant impacts of the proposed project - loss of trees and landscaping, construction noise and change in neighborhood character are mitigated to a moderate level by the measures described in Item 5 below and the adoption of Alternate B-1. f 4. The City of Lodi finds that the significant impact - noise - cannot be mitigated to a less significant level with, or without the project or any of the alternatives, and that the need to provide for orderly traffic flow in the City overrides this impact. 5. The following mitigation measures shall be included in the project in order to reduce the environmental irpact of the project: a. Trees within the undeveloped portion of the street right-of-way shall be retained wherever practical, and to that end, that the sidewalk width be reduced from five feet to four feet in the V;o;n;txr of �••----