Loading...
HomeMy WebLinkAboutAgenda Report - January 16, 2013 C-05AGENDA ITEM COPS Ah CITY OF LODI COUNCIL COMMUNICATION Im AGENDA TITLE: Approve Specifications and Authorize Advertisement for Bids for Lodi Transit Station Concrete Pavement Project, 28 South Sacramento Street MEETING DATE: January 16,2013 PREPARED BY: Public Works Director RECOMMENDED ACTION: Approve specifications and authorize advertisement for bids for Lodi Transit Station Concrete Pavement Project, 28 South Sacramento Street. BACKGROUND INFORMATION: This project consists of replacing 7,600 square feet of concrete pavement, driveway, sidewalk and wheelchair ramps within the Transit Station, installing 1,130 square feet of reinforced concrete pavementwith an asphalt concrete overlay within Sacramento Street, and other incidental and related work, all as shown on the plans and specifications for the project. The existing concrete pavement at the Lodi Transit Station bus driveway/loading area has developed extensive cracks and settlement. Numerous patches have been attempted; however, permanent repairs are required. The patches and cracks have created safety and ADA access issues requiring replacement of the concrete pavement. The project also includes installing reinforced concrete pavementwithin Sacramento Street at the passenger loading island to replace the failing street pavement. The specifications are on file in the Public Works Department. The planned bid opening date is February 27, 2013. Project completion is expected prior to Summer 2013. FISCAL IMPACT: Decreased maintenance costs at the Lodi Transit Station and on Sacramento Street associated with these improvements. FUNDING AVAILABLE: Funding will be identified at project award. "�" J, d. t F. Wally randelin Public Works Director Prepared by Paula Fernandez, Transportation Manager/Senior Traffic Engineer and Lyman Chang, Senior Civil Engineer FWS/PJF/LC/pmf cc: Transportation Manager MV General Manager APPROVED: Xo7n a— f Bartlam. Citv ManaDer K:\WP\PROJECTS\TRANSIT\MultiModalConcretePavement\ccLPSA.doc 01/07/2013 CITY COUNCIL ALAN NAKANISHI, Mayor PHILKATZAKIAN, Mayor Pro Tempore LARRY D. HANSEN BOBJOHNSON JOANNE L.MOUNCE MV Transportation Jeff Kohlhepp, Manager 24 S. Sacramento Street Lodi, CA 95240 CITY OF LODI PUBLIC WORKS DEPARTMENT CITY HALL, 221 WEST PINE STREET P.O. BOX 3006 LODI, CALIFORNIA 95241-1910 (209) 333-6706 FAX (209)333-6710 EMAIL pwdept@lodi.gov http:\\www.lodi.gov January 10,2013 KONRADT BARTLAM City Manager RANDIJOHL City Clerk D. STEVEN SCHWABAUER City Attorney F. WALLY SANDELIN Public Works Director SUBJECT: Approve Specifications and Authorize Advertisement for Bids for Lodi Transit Station Concrete Pavement Project, 28 South Sacramento Street Enclosed is a copy of background information on an item on the City Council agenda of Wednesday, January 16, 2013. The meeting will be held at 7 p.m. in the City Council Chamber, Carnegie Forum, 305 West Pine Street. This item is on the consent calendar and is usually not discussed unless a Council Member requests discussion. The public is given an opportunity to address items on the consent calendar at the appropriate time. If you wish to write to the City Council, please address your letterto City Council, City of Lodi, P. O. Box 3006, Lodi, California, 95241-1910. Be sure to allow time for the mail. Or, you may hand-deliverthe letterto City Hall, 221 West Pine Street. If you wish to address the Council at the Council Meeting, be sure to fill out a speaker's card (available at the Carnegie Forum immediately prior to the start of the meeting) and give it to the City Clerk. If you have any questions about communicating with the Council, please contact Randi Johl, City Clerk, at 333-6702. If you have any questions about the item itself, please call Paula Fernandez, Transportation Manager/Senior Traffic Engineer, at 333-6800, extension 2667. 7 o. O&U"-o F. Wally Sandelin Public Works Director FWS/pmf Enclosure cc: City Clerk NCC_PS&A.DOC