HomeMy WebLinkAboutAgenda Report - January 7, 1987 (70)TO: THE CITY COUNCIL
FROM. THE CITY MANAGcR'S OFFICE
Ct}U1'`+`CIL CO:►IMUNICAr1f' O
DATE
January 7, 1987
NO.
SUBJECT: AC-= I111PR0A!EP LS UNDER CXaNTRAC1' FOR EL,ACMIC ST.JB-TT II MJRES, RU'I`I,1_FE—G.E Di2IVE,
LCWER SACR'RAhMi'i'O ROAD Al'EA SOUTH OF nIMON, DRIVE, UID 86-8
RECOMMENDED ACTION: That the City Council accept the installation of
Electric Substructures and direct the Electric Utility Director to file
a notice of completion with the County Recoreer's office. The final
contract price was $88,530. The difference ($579.00) between the contract
amount and the final contract price is due to the adjustment of two cenent
=aults to meet field conditions (Change Order #1).
Sufficient funding sur this project was included in the 1986-1"7 fiscal
year budget.
BACKGROUND INrORMTION: At the Council *n. e.ting of October 15, 1986,
the City Council awarded the contract for ii,stallation of Electric
Substructures, Rutledge Drive, Lower Sacramento Road, s/o Tejon Drive:,
to Graftigna Electric Co., Lodi, in the amount of $87,951. The installa-
tion of the substructures will enable the Electric Utility Department
to reconstruct the underground direct-buriea 12-kv distribution system
in tl.e area. The existing system, installed in 1968-69, is rapfdly
failing due to csble detericration. As a result of the cable condition,
this area has experienced numerous outages, with the outage rate con-
tinually increasing.
&17 14-1�
Tien J. Rice
Electric Utility Director
cc: Assist. Electric Utility Director