Loading...
HomeMy WebLinkAboutAgenda Report - January 7, 1987 (70)TO: THE CITY COUNCIL FROM. THE CITY MANAGcR'S OFFICE Ct}U1'`+`CIL CO:►IMUNICAr1f' O DATE January 7, 1987 NO. SUBJECT: AC-= I111PR0A!EP LS UNDER CXaNTRAC1' FOR EL,ACMIC ST.JB-TT II MJRES, RU'I`I,1_FE—G.E Di2IVE, LCWER SACR'RAhMi'i'O ROAD Al'EA SOUTH OF nIMON, DRIVE, UID 86-8 RECOMMENDED ACTION: That the City Council accept the installation of Electric Substructures and direct the Electric Utility Director to file a notice of completion with the County Recoreer's office. The final contract price was $88,530. The difference ($579.00) between the contract amount and the final contract price is due to the adjustment of two cenent =aults to meet field conditions (Change Order #1). Sufficient funding sur this project was included in the 1986-1"7 fiscal year budget. BACKGROUND INrORMTION: At the Council *n. e.ting of October 15, 1986, the City Council awarded the contract for ii,stallation of Electric Substructures, Rutledge Drive, Lower Sacramento Road, s/o Tejon Drive:, to Graftigna Electric Co., Lodi, in the amount of $87,951. The installa- tion of the substructures will enable the Electric Utility Department to reconstruct the underground direct-buriea 12-kv distribution system in tl.e area. The existing system, installed in 1968-69, is rapfdly failing due to csble detericration. As a result of the cable condition, this area has experienced numerous outages, with the outage rate con- tinually increasing. &17 14-1� Tien J. Rice Electric Utility Director cc: Assist. Electric Utility Director