Loading...
HomeMy WebLinkAboutAgenda Report - January 7, 1981 (28)e ' Transit $ 44, 000 (Dial -A -Ride) ° Streets and Roads 1, 949, 912 Planning _ 13.467 $2.007,379 Unclaimed _ 127.953 $2. 135, 332 Included in the City's 1981-82 apportionment is $9780 for non -motorized transportation uses such as bike paths and handicap ramps. Included in the $153,896 of curb and gutter projects are handi- capped ramps which meets the intent of the law. Therefore, it is appropriate for Council to determine that the non -motorized apportionment is included In the listed street and road projects and therefore separate project listings are not necessary. In order to obtain those funds it Is necessary to submit a Claim through the San Joaquin County Council of Governments. This Claim is reviewed by the Trans- portation Technical Committee and COG Transportation Policy Committee before going before the COG Board. These hearings are scheduled for the month of October. C2ZY or Low CAPML DVM;V= PFOGRhM - 1981-82 YCOUTMATIM 121 17.1 17.2 18.1 33 123 Total General Sewer Waste Water water 2106 Master Wst IFund Capital Capital COR Gas Tax Drains Sanitary Sewers 139,000 136,000 32,000 107,000 Storm Drainage 1,256,000 40,000 208,000 wester System 315,000 Xt System 1,240,000 35,000 315,000 136,000 Other Facilities 339,000 550,000 346,000 732,000 TOTAL 3,289,000 40,000 32,000 107,000 Beginning Ballance 7/1/81 1,310,541 219,142 418,037 Est. Resources 81/82 -0- 47,000 115,160 145,87' 1;310,541 266,142 533,197 Adtments (362,240) (212,924) 352,621 F= AVAnAwz 948,301 53,218 533,197 Projects Budgeted 40,000 32,000 107,000 ESTINg M FU4M AVAILA= 685,257 550,193 1,065,772 6/30/82 908,301 21,218 426,197 788,000 315,000 136,000 550,000 346,000 208,000 304,000 35,000 315,000 136,000 788,000 550,000 346,000 732,000 243,000 216,257 387,133 296,257 887,428 206,748 332,859 469,000 163,060 769,515 586,240 145,87' 573,564 C. 243,000 685,257 550,193 1,065,772 1,473,668 352,621 906;419 243,000 (11,9io) 685,257 550,193 1,065,772 1,473,668 352,621 894,509 243,000 3159000 136,000 788,000 550,000 346,.000 732,'000. 243,000 370,257 414,193 277,772 923,668 6,621 162,509 -0- PROJECTS Miscellaneous Sanitary Sewers Miscellaneous Sanitary Manholes Oversized Sewer Lines Beckman Road Replacement - Victor to Lockeford * Modify Sacramento Street Industrial Waste Pump Station Myrtle Avenue Sanitary Sewer Cluff to 700' E/fluff White Slough Facility Miscellaneous Site Paving Laboratory Expansion Design Overhaul Chaa_ie1 Blower * Previously Authorized 12,000 60,000 25,000 5,000 6,000 11,000 139,000 12,000 60,000 25,000 5,000 6,000 11,000 32,000 107,000 CITY OF LODI CAPITAL IMPROSIEmaT PROGRAM 1981-02 STORM DRAINAGE PROJECTS Miscellaneous Storm Drains Outfall Structure Control Program Catch Basin Replacement Program Salas Park Improvements: * Pump Station * Stockton Street Improvements Sprinkler & Landscaping Improvements Cluff Avenue Drain: Turner to Lockeford Highway 12 Crossing C Basin Development: Excavation, Fencing & Beckman Road Crossing MainStreet Storm Drain Elm to Lockeford Shady Acres Pump Station 11 *Previously Authorized 237,000 111,000 50,000 250,000 64,000 76,000 86,000 342,000 1,256,000 40,000 O 237,000 111,000 50,000 250,000 64,000 76,000 788,000 121 123 14a Total General Master Reve=iue.. Cost Fund Drain Shakia'` 10,000 10,000 10,000 10,000 20,000 20,000 237,000 111,000 50,000 250,000 64,000 76,000 86,000 342,000 1,256,000 40,000 O 237,000 111,000 50,000 250,000 64,000 76,000 788,000 PROJECTS Miscellaneous Water Mains Oversized Water Mains Major Water Crossings Water Meters Elimination of Deadend Lines Fire Protection Improvements Miscellaneous Fire Hydrants System Upgrade - Church and Park Wells Improvements: Well #11 Rehabilitation * Well #20 Mettleman & 99) R/W Acquisition & Eng.z.aering Well #21 Mattleman & Mills) Test Well Well Drilling Well #3 - Control Valve Imp. * Pressure Control Automation Well Abandonment *Previously Authorized 5,000 5,000 15,000 15,000 10,000 10,000 15,000 15,000 6,000 6,000 15,000 15,000 90,000 90,000 48,000 48,000 32,000 32,000 10,000 1Q,000 40,000 400,000 12,000 12,000 10,000 10,000 7,000 7,000 315,000 315,000 PROJECT Miscellaneous Widening Miscellaneous Curb & Gutter Miscellaneous Overlay Projects Upgrade Miscellaneous Traffic Appurtenances Traffic Signals: * Pine & Sacramento Kettleman & Hutchins Stockton Street Widening * Right of Way Lockeford St. Paving @ Cluff (South Side) Subdivision Paving . Turner -Beckman East SPRR Xing Approaches Lockeford St. -Crescent to Ham Hutchins Median Landscaping - Harney to Vineyard *Previously Authorized 60,000 60,000 128,000 64,000 396,000 50,000 346,000 20,000 20,000 50,000 50,000 135,000 135,000 91,000 91,000 25,000 25,000 64,000 (State) Continued-- [ y 's += zr r' y bi- ff STREET SYSTEM (Continued) 33 124 326 PROJECT Total 2106 Gas SB 325 Urban D Other Cost Tax Crossing Protection: Cherokee 90,000 9,000 81,000 (204) Washington 70,000 7,000 63,000 (Fed) 1,240,000 136,000 550,000 346,000 2080000 [ 1x J s k • W -S. !g � a r ., PROJECT Parks: Modify Lighting Controls on Tennis Courts (Kofu, Legion & Hale) Portable Basketball Floor MSC: MSC/Henning Security System MSC Warehouse Shelving, Cabinets, etc. MSC Fencing Police & Fire Communications Community_ Center: Bldg.& Fence Removal Roof Repairs & Security D w 1. .� ,...r G� „•} tv L Y;.: ..__.....-... :,�;k'.'.,,b 4 £+i f' ro+:' it `,� 1. r —_— _-._____.. _._._—_. _. _.__ 15,000 t; 95,000 60,000 '4 iy5'{r a CITY OF LODI CAPITAL IMPROVEMENT PROGRAM 1981-82 OTHER FACILITIES 148 Total Revenue Other Cost Sharing 8,000 8,000 78,000 78,000 15,000 15,000 29,000 29,000 15,000 15,000 95,000 60,000 39,000 39,000 60,0000 60L.00_0 339,000 304,000