HomeMy WebLinkAboutAgenda Report - November 2, 2011 C-06AGENDA ITEM •b CITY OF LODI COUNCIL COMMUNICATION AGENDA TITLE: Adopt Resolution Approving the Purchase of Padmount Transformers from HEES Enterprises, Inc., of Astoria, Oregon and CG Power Systems USA, Inc. of Washington, Missouri ($82,419.06) MEETING DATE: November2,2011 PREPARED BY: Electric Utility Director RECOMMENDEDACTION: Adopt a resolution approving the purchase of padmount transformers from HESS Enterprises, Inc.,, of Astoria, Oregon, and CG Power Systems USA Inc., of Washington, Missouri ($82;419.06). BACKGROUND INFORMATION: On August 17, 2011, the City Council authorized the Electric Utility Department (EU D) to advertise forbids as necessaryto meet the EUD's needs for padmount transformers through the fiscal year. On September 14, 2011, bids were opened with four suppliers submitting proposals, two of which were deemed responsive. Life -cycle costs (total purchase price plus cost of operation based on estimated power loss during the projected life of the transformer) were evaluated as shown on the attached table of Exhibit A. HEES Enterprises, Inc., of Astoria, Ore., and CG Power Systems USA Inc., Washington, Mo. submitted responsive bids with the lowest life -cycle costs as shown below. 5 each 75kVA, 1 -Phase 240/120V Pad HEES Enterprises, Inc. $11,464.60 2 each 225kVA, 3 -Phase, 480/277V Pad CG Power $13,057.15 3 each 1500kVA, 3 -Phase, 480/277V Pad CG Power $57,897.31 FISCAL IMPACT: Procurement cost is $82,419.06. Total life -cycle $158,360.31 FUNDING: Included in FY 2011/12 Budget Account No. 160.1496 Electric Inventory Jordan Ayers Deputy City Manager/Internal Services Director Ozabe hirkley, Electric Utility Director PREPARED BY: Weldat Haile P.E., Senior Power Engineer EAKNVH/Ist radt Bartlam, City Manager RESOLUTION NO. 2011-169 A RESOLUTION OF THE LODI CITY COUNCIL APPROVING THE PURCHASE OF PADMOUNT TRANSFORMERS FROM HEES ENTERPRISES, INC., OF ASTORIA, OREGON, AND CG POWER SYSTEMS USA INC., OF WASHINGTON, MISSOURI WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened on September 14, 2011, at 11:00 a.m. for the purchase of padmount transformers for the Electric Utility Department, described in the specifications therefore approved by the City Council on August 17,2011; and WHEREAS, said bids have been compared as to life -cycle costs, checked, and tabulated and a report thereof filed with the City Manager as shown on ExhibitA attached; and WHEREAS, the bids meeting the City's specification with the lowest estimated life -cycle costs are shown below: 5 each 75kVA, 240/120V I -Phase Pad HEES Enterprises, Inc. $11,464.60 2 each 225kVA, 480/227V 3 -Phase Pad CG Power System $13,057.15 3 each 1500kVA, 480/277V 3 -Phase Pad CG Power System $57,897.31 NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby approve the purchase of pad mount transformers as shown above in the amount of $82,419.06. Dated: November 2, 2011 ------------------------------------------------------------------------ ------------------------------------------------------------------------ hereby certify that Resolution No. 2011-169 was passed and adopted by the City Council of the City of Lodi in a regular meeting held November2, 2011, by the following vote: AYES: COUNCIL MEMBERS — Hansen, Katzakian, Mounce, Nakanishi, and MayorJohnson NOES: COUNCIL MEMBERS— None ABSENT: COUNCIL MEMBERS— None ABSTAIN: COUNCIL MEMBERS— NonKNH�L City Clerk KIIA I -R] EXHIBIT A. - PAD MOUNTED TRANSFORMER BID EVALUATION October 19, 2011 Transformer Bid Evaluation Bid Opening: ISeptember 14, 2011 Padmount Tax (factor): 1.0775 Primary Windings: Three -Phase, 12000 Volt, 60Hz, Delta Connected No Load Loss $/watt: 3.75 Single -Phase, 12000 Grd. e/6930 Volt, 60Hz For 10/19/2011 Council Meeting Load Loss $/watt: 1.25 Bid Item 1: 75 kVA, 240/120 Volt, Single Phase Pad Number of units: 5 65 >1.8 Vendor Unit Extended Price No Load Load No Load Load Cost of Life Cycle Delivery Height Impedance Price $ Price $ w/tax $ Loss (watts).oss (wafts Loss value Loss value Losses $ Cost $ (weeks) (inches) HD Supply Utilities Pacific Utilities ABB, Inc. Hees Enterprises Inc. Ermco Transformers 2,387.00 2,440.00 2,128.00 11,935.00 12,200.00 10,640.00 12,859.96 13,145.50 11,464.60 116 125 135 731 636 686 2,175.00 2,343.75 2,531.25 1 4,568.75 3,975.00 4,287.50 6,743.75 6,318.75 6,818.75 19,603.71 19,464.25 18,283.35 20-22 9-11 B-10 24 32 28 2.140 1.980 2.000 CG Power System no quote Bid Item 2: 225kVA, 480/277 Volt, Three Phase Pad, Number of units: 2 65 >3.5 Vendor Unit Price $ Extended Price $ Price w/tax $ No Load Load oss (watts oss (watt No Load Loss value Load Loss value Cost of Losses $ Life C cle Cost $ Delivery (weeks) Height inches) im edance HD Supply Utilities Pacific Utilities ABB, Inc. Hees Enterprises Inc. Ermco Transformers CG Power System 7,832.00 7,750.00 7,089.00 6,059.00 15,664.00 15,500.00 14,178.00 12,118.00 16,877.96 16,701.25 15,276.80 13,057.15 431 352 434 487 1997 1791 1626 1,822 3,232.50 2,640.00 3,255.00 3,652.50 4,992.50 4,477.50 4,065.00 4,555.00 8,225.00 7,117.50 7,320.00 8,207.50 25,102.96 23,818.75 22,596.80 21,264.65 10-12 9-11 8-10 8-10 49 52 4.340 3.890 1 4.700 3.560 Bid Item 3: 1500 kVA, 4801277 Volt, Three Phase Pad, Number of units: 3 90 >5.3 Vendor Unit Price $ d E69,375.00 i74,751.56 No Load Load oss (watts oss (watt No Load Loss value Load Loss value Cost of Losses $ Life Cycle Cost $ Delivery (weeks) Height (inches) Impedance % HD Supply Utilities Pacific Utilities ABB, Inc. Hees Enterprises Inc. Ermco Transformers CG Power System 23,125.00 20,575.00 21,229.00 17,911.00 61,725.00 63,687.00 53,733.00 66,508.69 68,622.74 57,897.31 1938 1434 1599 1633 9785 10107 10102 11345 21,802.50 16,132.50 17,988.75 18,371.25 36,693.75 37,901.25 37,882.50 42,543.75 58,496.25 54,033.75 55,871.25 60,915.00 133,247.81 120,542.44 124,493.99 118,812.31 13-15 8-10 8-10 8-10 63 74 5.700 6.260 5.8 5.750 Bid Item Lowest Total Price Total LCC Hees Enterprises Inc. (Ermco Transformers) CG Power System USA Inc. CG Power System USA Inc. 1 2 3 11,464.60 13,057.15 57,897.31 82,419.06 18,283.35 21,264.65 118,812.31 158,360.31 BSU Account No. 160.1496 Prepared by: Weldat Haile P.E. Senior Power Enginner 11-02-11 WH Award Padmount Transfor ers - Attach.xls 1