HomeMy WebLinkAboutAgenda Report - November 1, 1989 (56)CITY OF LORI
COUNCIL COMMUNICATION
PUBLIC WORKS DEPARTMENT
TO: City Council
FROM: City Manager
MEETING DATE: November 1, 1989
AGENDA TITLE: 1989/90 Capital Improvement Program for Streets
RECOMMENDED ACTION: That the City Council review, make any appropriate
changes, and introduce Ordinance No. 1470 approving the 1989/90 Street
Capital Improvement Program (CIP) .
BACKGROUND INFORMATION: The City Council has reviewed the Street Capital
Improvement Program at two previous Shirtsleeve Sessions. Based on the
discussion that has taken place at these Shirtsleeve SessiJns and the staff's
concern on certain projects, the following changes were made in the CIF you
were given at the last Shirtsleeve Session:
1. The Church Street signal coordination improvements were moved from
1990/91 to 1989/90.
Z. The Turner/Stockton traffic signal was moved from 1989/90 to 1990/91.
3. The Church Street, Century to Kettlenian, reconstruction costs were
split between the 1989/90 and 1990/91 fiscal year. Tnis project would
be constructed in the stu7niff of 1990.
4. The appraisal for the Hutchins Street frontage road right-of-way
�iorth of Century Boulevard was removed from the 1989/90 fiscal year.
The staff will provide at the Ccuncil meeting the additional inforn;ation
requested by the Council on the 13m Street signal installation.
These changes provide a reserve of $136,000. It is understood that there may
be additional changes the Council may want to make in the 1989/90 CIP. It is
recommended that these changes be solidified at the :ouncil meeting in order
that the St CIP for this fiscal year can be approved and implemented.
Jack . Ronsko
c Works Director
JLR/mt
Attachment
APPROVED:
T M A
CCIPSTP,E; TXTW.02M
PETERSON, City Manager
October 2F, 1989
ORDINANCE NO. 1470
AN ORDINANCE OF TEE ISI CITY OJ[.JIgJL
ADOPTING A CAPITAL IMPROVEMENT PROGRAM BUDGET
FOR STREETS FOR THE CITY OF ISI FOR FISCAL YEAR 1989-90
IT ORDAXNED BY '-E LODI
CITY COUNCIL AS FOLLOWS:
SECTION 1.
Together
with estimated revenues
to be received for
fiscal year
1989-90 and the unappropriated funds
and reserve balances
in , the c ; +y
treasury as
of this date, there i s hereby appropriated and
allocated monies for
the support of the City's
Capital Improvement
Program for
streets,
as shown on Exhibit A
attached keret) and
incorporated
herein by
reference.
t
SECTION 2. All ordinances and parts of ordinances in conflict
herewith are repealed insofar as such conflict may exist.
SECTION 3. This ordinance shall be published one time in the "Lodi
News Sentinel", a daily newspaper of general circulation printed and
published in the City of Lodi and shall be in force and take effect
thirty days from and after its pas gage and approval.
Approved this day of
JOHN R. SNIDER
Mayor
Attest:
ALICE M. REIMCHF
City Clerk
State or California
County of San Joaquin, ss.
I, Alice M. Reimche, City Clerk of the City of Lodi, do hereby certify
that Ordinance No. 1470 was introduced at a regular meeting of the City
Council of the City of Lodi held November.1, 1989 and was thereafter
passed, adopted and ordered to pant at a regular meeting of said
Council held , 1989 by the following vote:
Ayes : Council Members -
Noes : Council Members -
Absent: Council Members -
Abstai n : Council Members -
I further certify that Ordinance No. 1470 was approved and signed by
the Mayor on the date of its passage and the same has been published
pursuant to law.
Approved as to Form
BOBBY W. McNATT
City Attorney
ORJ1470/TXTA.01V
-2-
ALICE M. P.IMCHE
City Clerk
EXHIBIT A
Streets- 1989/90 Capital Improvement Program
City of Lodi- Public Works Department
future years shown for info only
Cost in
Work In
PROJECT YEAR COSTS ($000)
Annual Cost Increase:
4.0%
Project
Jul -89
Progress
89-93
90.91 91-92 92-93 93-94
Remarks
Account d
Miscellaneous Widening
50,000/yr
3,166
50
50 50 50 50
33.0-500.01
15,000/yr
15
15 15 15 15
33.0.500 03
$ideyyalk Replacements
50,000/yr
50
50, 50 50 50
33.0/128.0-50004
HAWi1%RppgA(3amp installations
5,000/yr
5
5 5 5 5
33.0.500.08
haft operational tmoUMff19rLU
1. Miscellaneous
15,000
13,932
15
16 16 17 17
330-91) 17
2. Stockton St @ Hwy 12 LT phase
845
Project completed, Cal Trans to closeout
33.0-50020
3. Church St Coordination Impr
52,000
52
Convert signals to tratfic actuation
4. Arterial Control System
83,000
93
On -street master (rough estimate)
Traffic Sionals
Listed in order per 1967 Priority Study
1. Victor/Cluff
89,826
Wailing for RR to install xiny protection first
33.0/126 0-500 88
2. Locke ford/Stock ton
81,000
Needs street widening first
3. Lwr. Sacramento/Lodi
90,000
126.0-500.96
4. Turner/Stockton
81,000
a4
5. Kettleman/Mills
91,000
98
6. Lwr. Sacramento/Elm
80,000
126.0.500.97
7. Pine/Stockton
81,000
91
8. Lwr. Sacramento/vine
91,000
106
9. Turney/Mills
81,000
Requires RR crossing protection first
10.Turner/Edgewood-California
81,000
11. Kettleman/Central
91,000
` ty& Wideriing.E!roj tct:
Yutchins Street
. Tukay to Lodi
361,593
Widening on east side 1/2 blk S/Lodi only
1240.500 75
b Lodi to Pine
Project adopted in 1982 included some
Preliminary Engineering
9,953
widening S/Walnut, not Io General Plan width
1240.50099
Right -of -Way (W. side S/Walnut)
66,000
66
Construction
244,000
254
2. Almond Drive (500' to 11 00'W/Chero!,,ee)
Right-of-way
0
Assumed curb, gutter & swk by City in exchange
for R/W
Construction
26,000
28
3. Church Street - Century to Kettleman
Widening only alorig unimproved section on west
side
Right-ol-Way(1700 blk)
35,000
35
Reconstruction
250,000
100
150 project to be built in "summer '90 (FY 90/91)
c,g&swk 1700 block
8,000
8
c,g&swk 1900 block
8,000
8
320/33 0-50021
4. Lodi/Guild @Griffin Industrial Park
127,285
City responsible for E side of Guild & S
5. Lockeford Street
side of Lodi
a Church to SPRR (N. side)
b. SPRR to Cherokee
EIR/Preliminary Engineering
58,000
Right-of-way, SPRR to Stockton
47,000
Page 1
Oct. 23,
1989 5YSTREEI.XL.S
Page Oct. 23, 1989 5YS1'REE-f.XI 16
Streets - 1989/90 Capital Improvement Program
City of Lodi - Public Works Department
future years shown for into only
Cost in Work In PROJECT YEAR COSTS ($000)
Annual Cost Increase: 4.0%
Project
Ju! -89 Progress 89-90 90-91 91-92 92-93 93-94
Remarks _ Account N
Construction, SPRR to Stockton
363,000
Add signals per Priority Study
Right-of-way, Stockton to Chdrokee
204,000
176,000
Construction, Stocktonto Cherokee
356,000
2. Vine St - Stockton to Garfield, reconst
6. Stockton Street
3. Sacramento Street
a. Lockeford to Turner
200,000
b. Lockelord to Daisy, reconstruction
=:IR/Preliminary Engineering
52,000
dight -of -Way
52,000
4. Hutchins Street
Construction
561,000
97
b. Tokay to Lodi
74,000
5. Pine Street
Preliminary Engineering
a. SPRR to Cherokee, overlay
EIR done in 1982; interim project with no
Right -of -Way
90,0X))
widening adopted, see Rehab projects
Construction
7. Lodi Avenue
7. Lower Sacramento Road
Page 2
a. Preliminary Engineering
5,271.
124 0.500 86
b. Vine to Lodi
274,000
Prelim. estimate for interimwidening to 4 lanes
c. Lodi to Elm
274,000
d. Elm to Turner
341,000
e. Operational improvements
158,000
Turn lanes only (w/signals L Lodi, Elm) 124.0/126.0-500 22
8. Hutchins St Frontage Rd 600' N/Century
Appraisal
3,000
Right-of-way
60,000 (minimum)
Construction
9,000
Pavement.Rehabuit;atioa.PLQ Q=
10
1. Stockton Street
a. Tokay to Lodi
Preliminary Engineering
10,000
Reconstruction w/new c8g
263,000
Overlay alternative
80,000
b. Lodi I o Locketord, Overlay
176,000
c. Locketord to Turner, overlay
149,000
2. Vine St - Stockton to Garfield, reconst
121,000
3. Sacramento Street
a Lodi to Lockeford
200,000
b. Lockelord to Daisy, reconstruction
239,000
c. Lockeford to Daisy, seal alternative
d. Daisy to Turner, Overlay
93,000
4. Hutchins Street
a. Harneyto Kettleman(SE),oveday
97
b. Pine to Locketord, overlay
74,000
5. Pine Street
a. SPRR to Cherokee, overlay
b. Hutchins to School, overlay
90,0X))
6. Lodi/Ham Intersection, overlay
19,000
7. Lodi Avenue
Page 2
220,275
80
lim
Oct. 23, 1989 5YS-rREET.XLS
Estimate is for type d= rehab. indicated and
may vary w/final design
Interim project, not at General Plan width
Would require paving the gutter to avoid high crown problems
Tested in 189, overlay can be deferred
Page 6
124.0-500.23
Oct 23. 1989 5YSTHEF7 Xt
10
284
176
155
140
268
97
80
lim
Oct. 23, 1989 5YS-rREET.XLS
Estimate is for type d= rehab. indicated and
may vary w/final design
Interim project, not at General Plan width
Would require paving the gutter to avoid high crown problems
Tested in 189, overlay can be deferred
Page 6
124.0-500.23
Oct 23. 1989 5YSTHEF7 Xt
Streets -1989/90 Capital Improvement Program
City cf Lodi - Public Works Department
future years shown for info only
Cost in
Work In
PROJECTYEAR COSTS ($000)
Annual Cost Increase
4 0%
Project
Jul -89
Progress
RCi.4) g0 -g1 g1-92 92-9:1 93.q4
Ramarks
Account #
a. Prelim. Eng. - Main to Cherokee
10,000
Problem w/CCT RR tracks
330-50024
b. Main to Central, overlay
142,000
142
c. Central to Cherokee, overlay
112,000
116 1
d. Beckman to Kelly, overlay 25,000
8. Church Street - Hwy 12 to 100' S/Mendocino, ove
70,952
25 ,
(71) project to be deleted from work
in progress
124050025
9 `iarney Lane - Hutchins to 400' W/Stkn, overlay
89,981
1240 500 26/27
1� ,ckeford Street
`
a. SPRR to Cherokee, overlay
114,991
32 0-500 28/ 29
b. Hwy 99 to Cluff
c. Cluff to 600' E/Cluff
19,000
20
11. NA Avenue - Lodi to Elm, overlay
78,000
81
12. Che{okee Lane
a. Preliminary Engineering
10,000
10
'
b. Kettleman to Delores, overlay
132,000
143
c. Delores to Murray, overlay
818,000
d. Century to Kettleman, overlay
216,000
242
e. @ Kettleman approaches
60
Reconstruct LT 8 thru lanes @ intersection
13. Ham Lane - Hwy 12 to Vine, overlay
216,420
Includes minor widening 330/124 0/126 0-500 91/320-500 94
14. Pacific Ave - Walnut to Pacific; Walnut St 8
94,804
@ MSC driveway 8 parking lot
30/124 0 500 90
Oak. St - Pacific to Ham; overlay
15. Tokay Street
a. Lwr Sacramento,to Mills, overlay
83,000
83
b. Mills to Virginia, overlay
Defer per 1989 testing
c. Virginia to Fairmont, overlay
4410O0
46
d. Fairmont to Hutchins, overlay
65,000
68
e. Hutchins to Church, overlay
37,000
38
f. Church to SPAR, overlay
"
Defer per 1989testing
Miscellaneous Structural Overlays
250,000
270 280 290
Amount shown in future years for fiscal
Box-QuL=ii ) W-Q%.daaJu1QS1tS2f1-L?J1tL1fiLjQaf1W
1. Lov.x Sacramento Road 238,000
2. Mills Avenue 172,000
3. Harney Lane 188,000
tia�lts�asL��;iinQstntzcQ�mQnts
1 Locust St @ SPRR, sidewalk 31,000
2 Loma Dr @ SPRR, sidewalk 8,000
3 Turner Rd/Mills @ SPRR, xing prot./S 15,000
4. Cherokee Ln @ SPRR, xing prot. 8 median 8,804
5 Cluff Ave @ SPRR, xing protection 12,000
d4i;iC�11stne�us PrgjeS-t3S.lS�`CL�S
1 Overlay Analysis/Design 6,000
2. Median Landscaping
Page 3
16
12
384 6 6 6 7 7
Oct. 23, 1989 SYSTREET.XLS
.... ........ ...... ....... ...._-......._............. .... ..................._.....
planning; actual streets to depend on results of
overlay analysis/design project shown below
Page 7
33.0-500.31
124.0.500.36
32.0-50080
Oct. 23, 1989 SYSTREEI Xt S
Streets- 1989/90 Capital Improvement Program
future years shown for info only
Cost in
Work In PROJECT YEAR COSTS ($000)
Project
Jul -89
Progress 89-90 90-91 91-92 92-93 93-94
a. Hutchins St - Vineyard to Century
57,000
62
b. HutchinsSt - Century to Kettleman
244,000
Transportation Dev. Act (TDA, 1124Fand): 496
c. Century @ Hutchins medians
42,000
Federal Aid - Urban (FAU, 126 Fund): 88
d. Hutchins Frontage RdN/Century
86,000
Bicycle K Pedestrian (128 Fund): 20
e. Lwr Sacramento Rd Frontage N/EI
2,000
2
? '-)kay Fence, Gate & Planter rebuild C
WID
7,000
-im L n - 400' to 1500' N/Hwy 12, rev
38,000
which terminates in year shown.
frontage fence replacement
4. Funds transferred to maintenance & equipment not shown.
5. Cherokee Lane Drainage Design
3,704
7. Street Master Plan (w/General Plan)
20,000
2,530 20
8. Traffic Control Device Inventory
18,000
19
TOTAL COST OF PROJECTS: $9,133,000 1,707,797 878 1,306 1,107 1,117 680
Cumulative Total: 2,666 3,972 5,1379 6,'95 6,876
TOTAL FUNDING AVAILABLE: _ 1,787,797 1,014 1,055 1,002 1.042 1,083
Cumulative Total_ 2,802 3,057 4,859 5,901 6,984
NET (FUNDS - COST), ANNUAL: 136 (L511(105) (7 5) 403
Cumulative Net: 136 ( 114 ) ( 220 ) ( 294) 108
Notes:
1. Totals do not include alternative projects shown •
2. Funding sources for fiscal year: 89.90
90-91
91.92 92.93 93.94
Gas Tax (328 33 Funds): 411
427
1144 462 480
Transportation Dev. Act (TDA, 1124Fand): 496
516
537 558 580
Federal Aid - Urban (FAU, 126 Fund): 88
92
Bicycle K Pedestrian (128 Fund): 20
20
21 22 23
Total: 1,014
1,055
1,002 1,042 1,082
3. Funding increased at same % as project costs except FAU
which terminates in year shown.
4. Funds transferred to maintenance & equipment not shown.
G
City of Lodi - Public Works Departmeni
Annual Cost Increase: 4.0%
Remarks Account N
Sprinklers by City forces, bermuda will till in
330-50030
33 .0.500 58
724.0-500.81
Pare, 4 Oct. 23, 1989 5YSTRE.ETALS gage 3 Oct 23, 1989 5YStf1EE1 .xl