HomeMy WebLinkAboutAgenda Report - October 19, 2011 G-01 PHAhCITY OF LODI
�PCOUNCIL COMMUNICATIO
AGENDA TITLE: Public Hearing to Introduce an Ordinance Amending Chapter 13.20—
Electrical Service — by Repealing and Reenacting Section 13.20.225,
"Schedule NEM — Net Energy Metering Rider," and Section 13.20.227,
"Schedule CEM — Co -Energy Metering Rider'
MEETING DATE: October 19,2011
PREPARED BY: Electric Utility Director
RECOMMENDED ACTION: Public Hearing to Introduce an Ordinance Amending
Chapter 13.20 — Electrical Service — by Repealing and
Reenacting Section 13.20.225, "Schedule NEM — Net
Energy Metering Rider," and Section 13.20.227, "Schedule
CEM — Co -Energy Metering Rider'
BACKGROUND INFORMATION: The purpose of this rider is to establish rates, terms and
conditions for providing net metering services to customers
generating electricity using renewable facilities one
megawatt (MW) or less in size.
Currently residential and small commercial customers generating electricitywith renewable
facilities of 10 kW or less are net -metered; that is their meters deductfrom their usage the
amount they generate, and they are billed on the net. Customers generating electricitywith
renewable facilities greater than 10 kW and less than 1 MW are metered for consumption and
generation separately; they pay the retail rate for all their usage and are paid for the energy they
generate at the average wholesale cost plus the ECA. When AB 920 became effective on
January 1, 2011 it required a number of changes to the co -metering component of the Lodi
Electric Utility rate schedules. The changes, which require the purchase of customer generator
power in excess of consumption, eliminate the advantage of using the co -metering schedule.
The changes must be implemented in time to affect the 2011 calendar year of power
consumption (net metering schedules do not result in a monthly bill, instead they are trued up at
the end of the year).
The simplest way to implement the changes is to eliminate the co -metering schedule and
migrate all customer generators to the net metering schedule. Staff also recommendsthis path
because Lodi is the only California Municipal utility to implement a co -metering schedule.
Migrating all customer generators to net metering will bring the electric utility into compliance
with AB 920 and bring Lodi into compliance with the industry standard.
On the effective date of this ordinance, customer generators on the City's prior Schedule CEM -
Co -Energy Metering Riderwill be converted to the City's Schedule NEM -Net Energy Metering
APPROVED: ( —~
Konradt Bartlam, City Manager
Public Hearing to Introduce an OrdinanceAmending Chapter 13.20— Electrical Service— by Repealing and
Reenacting Section 13.20.225, "Schedule NEM— Net Energy Metering Rider," and Section 13.20.227, "Schedule
CEM — Co -Energy Metering Rider"
October 19,2011
Page 2 of 2
Rider. In calendaryear 2011, the annual Net Energy bill as provided in Lodi Municipal Code
Section 13.20.225(D)(3), shall be calculated retroactiveto January 1, 2011 and the annual
Excess Energy credit or payment (if any) shall be calculated retroactive to January 1, 2011.
FISCAL IMPACT: Approximately $25,000 annual revenue reduction with existing solar
installations.
FUNDING: Not applicable.
eth A; irkley
Electric Utility Directsr
Prepared By: Rob Lechner, Manager, Customer Service & Programs
EK/RSUIst
ORDINANCE NO.
AN ORDINANCE OF THE LODI CITY COUNCIL AMENDING
CHAPTER 13.20, "ELECTRICAL SERVICE," BY REPEALINGAND
REENACTING SECTION 13.20.225, "SCHEDULE NEM - NET
ENERGY METERING RIDER," AND SECTION 13.20.227,
"SCHEDULE CEM - CO -ENERGY METERING RIDER
BE IT ORDAINED BY THE LODI CITY COUNCIL AS FOLLOWS:
SECTION 1 -Lodi Municipal Code Section 13.20.225, "Schedule NEM - Net Energy
Metering Rider," is hereby repealed and reenacted to read as follows:
A. PURPOSE: The purposeof this rider isto establish rates, terms, and conditions for
providing net metering services to customers generating electricity using solar and
wind facilities of ten k1 MW or less in size. This rider complies with California State
legislation requiring every electric utility in the state, including municipally owned
utilities, to develop a standard contract ortariff providing for net energy metering, as
defined below.
B. APPLICABILITY: This schedule is applicable to service for customers where apart
or all of the electrical requirements of the customer can be supplied from a solar or
wind power production source owned and operated by the customer (customer -
generated). Availabilityof this schedule to eligible customer-generatorswill beona
first-come, first-served basis and will be available until such time the total rated
generating capacity used by eligible customer -generators equals #we-ai;d one-
ha� ive percent(2.6%) of the Cityof Lodi aggregate customerannual peak demand.
The solar or wind generation source must: 1) have a capacity of a-Gkl MW or less,
2) be located on the customer -generator's premises, 3) be connected for parallel
operationwith Lodi'sdistributionfacilities, and 4) be intendedforthe sole purposeof
offsetting apart or all of the customer -generator's own electrical requirements. I n no
case shall the power or energy generated by the customer -owned solar or wind
source be available for resale, except as specified under this rider.
Additional terms and conditions for service, including terms of interconnectionand
parallel operation, are specified in a customer-specificElectrical Interconnection and
Net Energy Metering Payment Agreement.
C. RATES: Chargesfor electricity supplied by the City wilI be based on metered usage
in accordance with Special Conditions (3) and (5) below. Rates charged underthis
schedule will be in accordance with the eligible customer -generator's otherwise
applicable rate schedule. Public Benefit charges and monthly customer charges
shall not be by -passable.
D. SPECIAL CONDITIONS:
Other Agreements: A signed Electrical Interconnection and Net
Metering PaymentAgreement betweenthe customer-generatorand
the City is required for service underthis schedule.
2. Metering Equipment: Net energy metering shall be accomplished
using a single meter capable of registering the flow of electricity in
two directions. If customer's existing electrical meter is not capable
of measuring the flow of electricity in two directions, the customer -
generator shall be responsible for all expenses involved in
purchasing and installing a meter that is capable of measuring
electricity in both directions.
Co-Enerav Meterina customers transferred to Net Metering
pursuantto Lodi Municipal Code 13.20.227, may remain on the
dual meter system. Net Enercy Metering customers, at their
election may opt for the dual meter system.
3. Net Energy Metering and Billing: Net Energy is defined as measuring
the difference between the electricity supplied bythe City through the
electric grid to the eligible customer -generator and electricity
generated by an eligible customer -generator and fed back into the
electric grid over a 12 -month period.
In the event that the electricity supplied by the City during the 12 -
month period exceeds the electricity generated by the eligible
customer -generator during the same period, the eligible customer is
a net electricity consumer and the City shall bill the customerfor the
net consumption during the 12 -month period based on the retail price
per kilowatt-hourfor eligible customer -generator's rate class overthe
same period.
The City shall provide the customer -generator with net electricity
consumption informationon each regular bill. That information shall
include the current amount owed to the City for the net electricity
consumed. Customer -generator may exercise the option to pay
monthly for the net energy consumed, but in any event shall be
responsible for any payments due at the end of each 12 -month
period.
4. Attributes: Any Capacity Attributes or Environmental Attributes
associated with the renewable energy produced by the customer -
generator at sites subject to this schedule shall belong to the City
with the sole exception of Renewable Energy Credits for solar and
wind generation up to the amount of on-site consumption. Capacity
Attributes include, butare not limitedto, System ResourceAdequacy
Capacity and Local Resource Adequacy Capacity, if any.
Environmental Attributes include, but are not limited to, Renewable
P
Portfolio Standard recognition, Renewable Energy Credits,
Greenhouse Gas Credits, and Emission Reduction Credits, if any.
5. Excess Energy: Net energy metering will be administered on an
annualized basis, beginningwith the month of interconnection of the
customer's generating system with the City's electrical system.
Electric solar and wind generation production may result in a dollar
credit carrying forward to the next billing period. If a credit
accumulation results in a net customer -owned generation credit at
the end of the annualized year, unused dollar credits will be set to
zero and not be carried into the new annualized year unless the
customer -generator affirmatively elects to be paid for such excess. If
the customer -generator so elects, the City shall either pay the
customer -generator or credit the customer generator's account for
such excess at the Baseline Energy Cost rate specified in Schedule
ECA plus the Energy Cost Adjustment rate averaged for the billing
periods with excess generation.
6, Rulesand Regulations: Other conditions specified inthe Cityof Lodi
Electric Utility Department's Rules, Regulations and Engineering
Standards shall apply to this electric rate schedule.
SECTION 2. Lodi Municipal Code Section 13.20.227, "Schedule CEM — Co -Energy
Metering Rider," is hereby repealed and reenacted to read as follows:
13.20.227 — Conversion of Prior Schedule CEM — Co-Enernv Meterinn Rider:
A. On the effective date of this Ordinance, customer nenerators on the
City's prior Schedule CEM Co-Meterinn Riderwill be converted to the City's Schedule
NEM-NetEnernvMeterinn Rider. In calendar year 2011. the annual Net Enernv bil I as
provided in Lodi Municipal Code Section 13.20.225(D)(3). shall be calculated
retroactiveto January 1.201 land the annual Excess Enernvcreditor pavment(if any)
shall be calculated retroactive to January 1. 2011.
r
• 1IL ofii lo illpsJi
3
Nil
MIMIC
„ Net Energy MeteFing RideF, 2) be 1GGated on the
. .
Nil
MIMIC
s�}eet tG this sGhed�shall the ng to + Gity with the sGIe evoen+inn of
Renewable EneFgy GFedits feF selaF and wind geReFatieR up to the amount of
o�^g sitJe G)nsummptien. GapQnity AttFibutes innli d but ere not limited +n
t are
limit
,,,,,,,np ,
ReRewa Rnrtfnliie St reGGgRitiG, Renewable Energy Credits
Greenhouse Gas Greditc and Emission Reds E;tinn Gredits if any.
G: p ii• Go_ y nn will he .admin t d on .ten anni alined
�iC62S.r ei{�y�v-i=ie�%�ie�eKlrry-vvm-pc-cecrmirTis.YteFecrvirarra�i�ivarrsccr
basis,begn nine with the month of int nnnentitren of he—GUstamee F's-
.7 .
geneFating system with the
pperied If a nredit nnnUmi iletinn results in a net nustemer_Gwned generating
Gredit at the eRd of the annualized year, unused dollar GFedits will be set te
zeFe and not be Garried into the new aRRualized yeaF unless the Gustemer
generatoF so e
the City shall eitheF pay the GUstemer geneFater OF GFethe GUStOmeF e
Gest Fate speGified in SGhedule EGA plus the EReFgY Cost Adjustment
averaged fnr the billing nerinds with evness generating
7 Rales aid Regulations: GtheF GOR itinns as speeif+ediR the City of
F=!eGtFiG Utility ^^Irpt j�e..�R� }} Rules,
shall apply to this
e GGhedu1e
SECTION 3. No Mandatory Duty of Care. This ordinance is not intended to and shall not be
construed or given effect in a manner which imposes upon the City, or any officer or
employee thereof, a mandatory duty of care towards persons or propertywithin the City or
outside of the City so as to provide a basis of civil liabilityfor damages, except as otherwise
imposed by law.
SECTION4. Severability. If any provision of this ordinance or the application thereof to any
person or circumstances is held invalid, such invalidity shall not affect other provisions or
applications of the ordinance which can be given effect without the invalid provision or
application. To this end, the provisions of this ordinance are severable. The City Council
hereby declares that itwould have adopted this ordinance irrespectiveof the invalidityof any
particular portion thereof.
SECTION 5. All ordinances and parts of ordinances in conflict herewith are repealed
insofar as such conflict may exist.
SECTION & This ordinance shall be published pursuantto law and shall become effective
30 days from the date of passage and adoption.
SECTION 7. The amended Schedules referenced above shall be effective on applicable
electric utility billings prepared bythe City of Lodi on or after January 1, 2012, orthe first date
allowable under State law.
5
Approved this_ day of ,2011
BOBJOHNSON
MAYOR
ATTEST:
RAND JOHL
City Clerk
State of California
County of San Joaquin, ss.
I, Randi Johl, City Clerk of the City of Lodi, do hereby certifythat Ordinance No. was
introduced at a regular meeting of the City Council of the City of Lodi held October 19,2011,
and was thereafter passed, adopted, and ordered to print at a regular meeting of said
Council held , 2011, by the following vote:
AYES: COUNCIL MEMBERS—
NOES: COUNCIL MEMBERS—
ABSENT: COUNCIL MEMBERS—
ABSTAIN: COUNCIL MEMBERS —
Ifurther certifythat Ordinance No. was approved and signed bythe Mayoron the date
of its passage and the same has been published pursuantto law.
Approved to Form:
D. STEPHEN SCHWABAUER
City Attorney
6
RANDIJOHL
City Clerk
lOF4
7 0
Please immediately confirm receipt
of this fax by calling 333-6702
CITY OF LODI
P.O. BOX 3006
LODI, CALIFORNIA 95241-1910
ADVERTISING INSTRUCTIONS
SUBJECT: PUBLIC HEARING TO CONSIDER INTRODUCING ORDINANCE
AMENDING CHAPTER 13.20, "ELECTRICAL SERVICE," BY REPEALING
AND REENACTING SECTION 13.20.225, "SCHEDULE NEM — NET
ENERGY METERING RIDER," AND SECTION 13.20.227, "SCHEDULE
CEM — CO -ENERGY METERING RIDER"
PUBLISH DATE: SATURDAY, OCTOBER 8,2011
TEAR SHEETS WANTED: One (1) please
SEND AFFIDAVIT AND BILL TO: RANDI JOHL, CITY CLERK
City cf Lodi
P. O Box 3006
Lodi, CA 95241-1910
DATED: THURSDAY, OCTOBER 6,201 1
ORDERED BY:
JEONIFER WROBisoN, CMC
ASSISTANT CITY CLERK
RANDIJOHL
CITY CLERK
MARIA BECERRA
ADMINISTRATIVE CLERK
Verify Appearance of this Legal in the Newspaper — Copy to File
formAadvins.doc
DECLARATION OF POSTING
PUBLIC HEARING TO CONSIDER INTRODUCING ORDINANCE AMENDING
CHAPTER 13.20, "ELECTRICAL SERVICE," BY REPEALING AND REENACTING
SECTION 13.20.225, "SCHEDULE NEM — NET ENERGY METERING RIDER," AND
SECTION 13.20.227, "SCHEDULE CEM — CO -ENERGY METERING RIDER"
On Thursday, October 6, 2011, in the City of Lodi, San Joaquin County, California, a
Notice of Public Hearing to consider introducing ordinance amending Chapter 13.20,
"Electrical Service," by repealing and reenacting Section 13.20.225, "Schedule NEM —
Net Energy Metering Rider," and Section 13.20.227, "Schedule CEM — Co -Energy
Metering Rider' (attached and marked as Exhibit A) was posted at the following
locations:
Lodi Public Library
Lodi City Clerk's Office
Lodi City Hall Lobby
Lodi Carnegie Forum
declare under penalty of perjury that the foregoing is true and correct.
Executed on October 6, 2011, at Lodi, California.
JVANIFER U. ROBISON, CMC
ASSISTANT CITY CLERK
N:\Administration\CLERK\Forms\DECPOSTEUD.DOC
ORDERED BY:
RANDIJOHL
CITY CLERK
MARIA BECERRA
ADMINISTRATIVE CLERK
• CITY OF LODI
Carnegie Forum
305 West Pine Street, Lodi
ie NOTICE OF PUBLIC HEARING
Date: October 19,2 011
Time: 7:00 p.m.
For information regarding this notice please contact:
Rand! Johl
City Clerk
Telephone: (209) 333-6702
ICE OF PUBL 1G
JEXF--=T�A
NOTICE IS HEREBY GIVEN that on Wednesday, October 19,2011, at the hour
of 7:00 p.m., or as soon thereafter as the matter may be heard, the City Council
will conduct a public hearing at the Carnegie Forum, 305 West Pine Street, Lodi,
to consider the following matter:
a) Introduce an Ordinance Amending Chapter 13.20, "Electrical
Service," by Repealing and Reenacting Section 13.20.225, "Schedule
NEM — Net Energy Metering Rider," and Section 13.20.227,
"Schedule CEM — Co -Energy Metering Rider"
Information regarding this item may be obtained in the Electric Utility
Department, 1331 South Ham Lane, Lodi, (209) 333-6762. All interested persons
are invited to present their views and comments on this matter. Written
statements may be filed with the City Clerk, City Hall, 221 West Pine Street,
2nd Floor, Lodi, 95240, at any time prior to the hearing scheduled herein, and oral
statements may be made at said hearing.
If you challenge the subject matter in court, you may be limited to raising only
those issues you or someone else raised at the public hearing described in this
notice or in written correspondence delivered to the City Clerk, 221 West Pine
Street, at or prior to the close of the public hearing.
By r of the Lodi City Council:
City Clerk
Dated: October 5, 2011
D. Stephen Schwabauer
City Attorney
CLERK\PUBHEAR\NOT(CES1Noteud.doo 10/5/11