Loading...
HomeMy WebLinkAboutAgenda Report - October 18, 1989 (70)a TO: THE CITY OOUNM FROM: THE CITY MANACER'S OFFICE CJOUNC]L MffiT KT DATE: OCTOBER 18, 1989 SUBJECT: ADOPEIGN OF ORDINANCE NO. 1464 - AN ORDP02NM OF THE LODI CITY CIOLNCL RFPEALM ORDPDXF3 N0. 1348 OF THE CITY OF LODI AND ENACENG A NEW ORDNANCE ESTABLISHING RAIES FOR THE SALE OF FTFECCUUC ENERGY BY THE CITY OF IODI Ordinance No. 1464 - "An Ordinance of the Lodi City Council Repealing Ordinance No. 1348 of the City of Lodi and Enacting a I%v Ordinance Establishing Rates for the Sale of Electric Energy by the City of Lodi" was introduced at the regular meeting of the Lodi City Council held October 4, 1989. Pursuant to State statute, ordinances may be adopted five days after their introducti`0n`;:.-:, following reading by title. This Ordinance has been approved as to form by the City Attorney. RECOMMENDED ACTION Following reading by title, it would be appropriate for the Lodi City Council to adopt Ordinance No. 1464. A&)M%-e4Wjk) City Clerk AMR/imp .... 0 U N C I L C0MMUNIC..TI0N TO: THE CITY OOUNM FROM: THE CITY MANACER'S OFFICE CJOUNC]L MffiT KT DATE: OCTOBER 18, 1989 SUBJECT: ADOPEIGN OF ORDINANCE NO. 1464 - AN ORDP02NM OF THE LODI CITY CIOLNCL RFPEALM ORDPDXF3 N0. 1348 OF THE CITY OF LODI AND ENACENG A NEW ORDNANCE ESTABLISHING RAIES FOR THE SALE OF FTFECCUUC ENERGY BY THE CITY OF IODI Ordinance No. 1464 - "An Ordinance of the Lodi City Council Repealing Ordinance No. 1348 of the City of Lodi and Enacting a I%v Ordinance Establishing Rates for the Sale of Electric Energy by the City of Lodi" was introduced at the regular meeting of the Lodi City Council held October 4, 1989. Pursuant to State statute, ordinances may be adopted five days after their introducti`0n`;:.-:, following reading by title. This Ordinance has been approved as to form by the City Attorney. RECOMMENDED ACTION Following reading by title, it would be appropriate for the Lodi City Council to adopt Ordinance No. 1464. A&)M%-e4Wjk) City Clerk AMR/imp AN ORDINANCE OF THE LODI CITY COUNCIL REPEALING CMINANLE NO, 1348 OF THE CITY OF LM AND INACM A NEW CFDKV%4CE ESMBLIAKT RATES FOR THE SALE OF ELECTRIC ENERGY BY THE CITY OF LSI BE IT BY THE LSI CITY COUNCIL AS FOLLOWS: SECTION 1. Lodi Municipal Code Chapter 13.20 is hereby amended by adding a mw section estdblishing rates for the sale of electric energy by the City of Lodi. SECTION 2. Ordinance 1348 entitled "An Ordinance Repealing Ordinance. No. 1321 of the City of Lodi and Enacting a Nw Ordinance Establishing Rates for the Sale of El :c tri c Energy by the City of Lodi" is hereby repealed as of the effective date of this ordinance. SECTION 3. She sale of electric energy by the City of Lodi shall be the rates hereinafter set forth. SECTION 4. Schedule EA - Residential Service - See schedule attached hereto, marked Exhibit A and thereby made a part hereof. SECTION 5. Schedule B1 - Mobile Home Park Service - See schedule attached hereto, marked t x h i b i t B and thereby made a part hereof. SECTION 6. Schedule MR - Residential Medical Eider - See schedule attached hereto, marked Exhibit C avid thereby made a part hereof. SECTION 7. Schedule EL - Outdoor Dusk -To -Dawn Lighting - See schedule attached hereto, marked Exhibit D and thereby made a part hereof. h F `•Yl'r ff � SECTION 8. Schedule G1 - General Service Groun Commercial/Industrial - See schedule attached hereto, marked Exhibit E ' and thereby made a part hereof. x t I+t f SECTION 9. Schedule G2 - General Service - Group 2 Commercial/Industrial - See schedule attached hereto, marked Exhibit F .-: '•' g and thereby made a part hereof. =i~_ '°` ` ''== ne SECTION 10. Schedule G3 - General Service Grou "' 3 : Commercial /Industrial - See schedule attached hereto, marked' Ezt W t:s` and thereby made a part hereof Inc ;'• SECTION 11. Schedule EP - Energy Purchase - See schedule attached hereto, marked Exhibit H and thereby made a part hereof. SECTION 12. Schedule SS - Standby Service - See schedule attached hereto, marked Exhibit I and thereby made a part hereof. SECTION 13. All ordinances and parts of ordinances in conflict herewith are repealed insofar as such conflict may exist. SECTION 14. This ordinance i s for the usual and current expenses of the City and is adopted pursuant to Government. Code e 36937(d). This ordinance shall be published one time in the Lodi News Sentinel, a daily newspaper of general circulation printed and published or, the City of Lodi and shall be in force and take effect immediately upon its . passage and apprcval. The increased rates shall appear on utility bills prepared on or 4 f to r November 1, 1989. Attest: ALICE M. REIMCHE City Clerk State of California County of San Joaquin, ss. Approved this day of 1, I, Alice M. Reimche, City Clerk of the City of Lodi, do hereby certify that Ordinance No. 1464 was introduced at a regular meeting of the City Council of the City of Lodi held October 4, 1989, and was ;;hereafte- passed, adopted and ordered t opp r int at a regular meeting of the City Council held October 18, 1989, by the Following vote: Ayes : Council Members - Hinchman, Olson, Pinkerton and Reid Noes : Council Members - None Absent: Council Members - Snider Abs tair•: %ounci i Members - None JOHN R. SP ID R Mayor r- ��• - ... 'r,�,, , 4111- 1, I, Alice M. Reimche, City Clerk of the City of Lodi, do hereby certify that Ordinance No. 1464 was introduced at a regular meeting of the City Council of the City of Lodi held October 4, 1989, and was ;;hereafte- passed, adopted and ordered t opp r int at a regular meeting of the City Council held October 18, 1989, by the Following vote: Ayes : Council Members - Hinchman, Olson, Pinkerton and Reid Noes : Council Members - None Absent: Council Members - Snider Abs tair•: %ounci i Members - None |........ -_ --^--~^ -~--I~~----~-^---°-^~^~--- I--- veil '-~ CalBOBBY W. McNATT City Attorney -u ELECTRIC UTILITY PROPOSAL 3 9t1 stomer Category Residential (EA) Small Commercial (G1) Medium Commercial (G2) Industrial (G3) Other Total Increase over 11/01/88 rates e v Month Increase Amount(0001s) Percent $1,326 14.0% 163 5.3% 233 4.4% 25 0.4% 177 14.5% $1,924 7.6% THE EF 2ECT OF THE ELECTRIC UTILITY PROPOSAL ON RESIDENTIAL CUSTOMERS. With City Council approval of the proposed rates, a residential custoner who uses 500 killowatt-hours (kwh) of alectr.icity,`per mcnth would see a monthly electric bill increase of $4.79 =in. summer, from $32.73 to $37.52; and $4.96 in winter, from $34.33 to $39.29. A residential individual bill may differ from this. example. C 011PARISON WITH PG&E LOCAL RESIDENTIAL RATES . In comparing the proposed Lodi rates to PG&E's presen,. local base customer rates at the usage of 500 kwh there would be a monthly difference of $8.01 in summer, $37.52 to $45.53; and $8.19 in winter, $39.29 to $47.48. PG&E has a requested increase scheduied to be implemented on January 1, 1990, which will additionally widen the difference. f EXPECTED 1989/1990 FISCAL YEAR 1XVENUES Customer Category Amoun.UnOO's! Customers . Residential (EA) $10,289 18,500 Small Commercial (G1) 3,170 2,070,. Medium Commercial (G2) 5,443 210' Large Commercial/Industrial (G31) 6,261 19 other 1,338 290 ' Total Budgeted Revenues $26,500 21,099 Y Fk 5� f y t . J 1 s. - Jon f is i i 50 40 1 Z.7% 34.2 30 20 CTY OF LODI ELECTRIC UTILITY DEPARTMENT 17.47% 23.3% 7.5% 7.6% %%1 5.2% �/. 0 RESIDENTIAL SMALL COMMERCIAL MEbIU1( COMMERCIAL LARGE CbMM/INDUSTRIAL 3 EXISTINV PROPOSED ``` POST 1 / 1 /90 . {.. qRR n .. 4 CITY OF .L ODI ELECTRIC UTILITY DEPARTMENT 1 . is 1 SCEMULE EA E RESIDENTIAL SERVIeP f $' �V APPLICABILITY: Residential service is applicable to domestic lighting,heatin cooking and pp g' F single-phase domestic power service in single -family and multi-family dwellings: separately metered by the City. RATES: Minimum Charge: . . . . . . . . . . . . . . . . . . . . . $4.00 Energy Charge: Summer (14ay througgh October) First 440 kwh, per kwh. . . . . . . . . . . . .06974: r,,, Over 440 kwh, per kwh. . . . . . . . . . . . .11396 ti,f Winter (November through A�pri 1) - First 400 kwh, per kwh. . . . . . . . . . . . .06974 Over 400 kwh, p e r kwh . . . . . . . . . . . . .11396 . The monthly g g g charge is the higher of the Minimum Charge or the Energy Charge. SPECIAL CONDITIONS: F . 1 (a) When a business or commercial establishment is conducted in conjunction with a residence and both are measured through one meter, this rate does not apply. ' (p This rate does not apply to service used for common areas and facilities t in mu ti) -f dwellings . (c) Service on this schedule will be supplied at the single-phase secondary voltage available - either 120/240 or 120/208 volts. (d) An additional first block medical quantity is available as described in Schedule MP, - Residential Medical Rider. i i 7 i r.EA-1%1 Effective November 1, 1984 rancelinG Resolution No. 88-12 Ordinance No. 146' PffortivP Nnvpmhor I':ORO Canceling ReSDILItion No. 88-127 Ordinance No. 146, SCHEDULE EM MOBILE HOME A9 SERVICE A_PPL1CAB1Lrf3f—_ Mobile home park service is applicable to single-phase service supplied, --to . mobile home parks through one meter' and sub -metered to all individual. Aw home units RATES: CustomerCharge: . . . . . . . . . . . . . . . . . . . . . $4.09 Energy Charge: .. .... Surntner (May through October) First 440 kwh, per occupied mobile hcar space wired for service, per kWh .0697 Over 440 kwh, per occupied mobile home space wired for service, per kWh . . . . . Winter (November through April) First 400 kwh, per occupied mobile hctrr space wired for service, per kWh . . . . . .06974 Over 400 kwh, per occupied mobile home space wired for service, per kWh . . . . . .11396 The monthly charge is the sun of the Customer Charge and the Energy Charge., SPECIAL CONDMOXt This rate is available only for master metering in service prior to March 1, J�a) 3 89. (b) it is the responsibility of the customer to notify the City Finance Department within 15 days following any change in the number of occupied mobile home spaces wired for service. ju�) a c Ld i j I f* � b).oct. pedical quantities are Menti'f'Medica aer. Sche �ke"si available as described in e a PffortivP Nnvpmhor I':ORO Canceling ReSDILItion No. 88-127 Ordinance No. 146, CITY 01 LORI ELECTRIC UTILITY DEPARTMENT 5 SCHEDULE MR RESIDENTIAL MEDICAL RIDER APPLICABILITY:. Qualifying residential customers on Schedule EA or EM are entitled to an additional 500 kilowatt-hours (kwh) at the lower priced first block rate. If a customer or full-time resident in the home has one or more of the medical Conditions listed below, the Electric utility Department may be contacted to request a City application, "Declaration of Eligibility for Medical First Elock Adjustment.'' Only one medical first -block adjustment per household is available. UALIFYING CONDITIONS: To qualify for the Medical First Block Adjustment, the customer will``be required to submit a completed City application, including the certification of a. doctor OT medicine or osteopathy licensed to practice in the State of California' that a customer or other full-time resident in the home is: I, dependent on a life-support device used in the home, or 2. a paraplegic, hemiplegic, or quadraplegic person having special air conditioning needs, or 3. a multiple -sclerosis patient with special heating or air corditioning needs. Medical conditions other than mu?tiple sclerosis, paraplegia, hemiplegia, or quadriplegia may qualify customers for medical quantities for electric heating or air conditioning. Any such conditions will be reviewed on an individual basis. L«j'7�-SUPPORT DEVICES: A life-support device is any medical device necessary to sustain life or relied upon for mobility. To qualify under this rule, the device must be used in the home and must run on electricity supplied by the City of Lodi. The term "life-support device'' includes, but is not limited to, iron lungs, hemodialysis machines, suction machines, electric nerve pressure pads and pumps, aerosol tents, electrostatic and ultrasonic compressors, IPPB machines and motorized wheelchairs. i respirators,''' stimt,lators, I t nebul i z e r s I:. ET, � p.KR-1/2 Effective 'november 1, 1969 Cancelino Resnlution No. BE• -1127 Ordinance No. 1464 CITY Of LODI 4 ELECTRIC UTILITY DEPARTMENT s HEATING AND AIR CONDITIONING:, Special heating and/or air-conditioning needs will qualify for a Medidal;First. a Block Adjustment under this rider only if the main source of energy for t)eati.ng or: air conditioning is electricity supplied by the City of Lodi. ~ L MEDICAL _FJ.RST BLOCK AW—r-SILAEK-TOR MASTER -METERED CUSTOMERS: > • .� Residential tenants of master -metered customers can also qualify for Med..ical;}� -*�}: First Block Adjustments. If one or more of the tenants have a Medical �rrr � that qualifies under the conditions listed above, contact the Electric"U.' Department to app?y. . � If tenants are submetered, any Medical First Block Adjustment must be passed•on to the qualifying tenant(s) when tenants are billed for the electricity they use �{ 0 r s•'1701!'e NT)Vfi +4r• (~IT t C t i h . Ir' n.MR-2;`2 Effective November i. 1069 Cance lino ReSC.;u`,ion Ian. v8-127 Ordinance No. 14^� SCHEDULE EL OUTDOOR MISK-10-DAWN Li Gff+Nf7 Outdoor dLisk-to-dawn lighting is applicable to City -owned and maintAined outdoor overhead area lighting service. Uusk-to-dawn lighting may not be used streetlighting purposes. For each 6,000 1 umen gas discharge I amp $10.23 per month For each 18,000 lumen gas discharge lamp $18.72 pgr month.. . .... . Zw tTECIAL CONDITIONS: (a) Lamps shall be approximately 6, 000 or 18, 000 lumen 9.as,dis'char" luminaire and bracket, as specified by the City of Lodi t i ectp c u'ti i i:ty Department, and shall be supported on City -owned poles which distribution system circuits for other City purposes and shall b, tt­. I approved by the City of Lodi. Lamps will be controlled from .4-isk' to' :daw'n. night so as to give approximately 4,380 hours of service annually. (b) Upon receipt of notice from a customer of failure of light to op@�;';�4,6 . . . . . scheduled, the City of Lodi Electric Utility Department will, within c. reasonal%,� period of time, make the necessary repairs. (c) Relocation of existing outdoor lighting service equipment or the installation of additional facilities required other than mentioned in (a) abo shall be at customer's expense prior to starting work. 71. ri.EL-l/I Effective November l` 1989 �a:celino Prsnlxtinn 6n_ Ordinance Nc ���� 46�-OF�_ Q�`= e4��-"gyp CITY 01 `LODI ELECTRIC UTILITY DEPARTMENT SCHEDULE G1; ; GENERAL SERVICE 1 COMMERCIAL/INDUSTRIAL * _GROUP APPLICABILITY:�� .y Schedule G1 i s applicable to customers with single-phase o7 three-,phase;��r alternating current service, or to a combination thereof, whose kwh usage doe�';not a exceed 8,000 kwh per mor+h for three consecutive months. RATES: Customer Charge: Single -Phase Service . . . . . . . . . . . . . $4.00 Three -Phase Service. i Y� . . . . . . . . . . . . 5.25 `A M t Yy Energy Charge: (per kwh) x .� �4- Summer (May through October) . . . . . . . . . Winter (November through April ). . . . . . . . . :08096" The monthly charge is the higher of: 1) the Customer Charge; 'and "the Energy kva hoirsepowee three Charge, or 2) $3.00 per of connected welder and per of phase. connected motor 'load plus the Energy Charge. A 1 1: i. ,t •s 1 i n 1;1_1!1 F{fortivc �:mremhcr 1 lOS2C Cencelino Peso!ution lio. 81-127 Ordinance Nc. 1464 CITY 01 LODI ELECTRIC UTILITY DEPARTMENT n oet SCHEDULE G2 GENERAL SERVICE - GROUP 2 COMMERCIAL/INDUSTUAL- ' APPLICABILITY : � il Schedule G2 will be applied to accounts with energy consumption in ex(�es.s of w,L 8,000 kilowatt-hours (kwh) or more for 3 consecutive months and with maximum demand' not to,exceed 400 kilowatts (kw) for 3 consecutive months. Billing Demand: The billing demand in any billing cycle will be the maximum average power taken during any metering interval in the period, but not le,55 than:. the diversified resistance welder load. (The customary metering interval is: 15 minutes; in cases where the use of energy is -nt,ermittent or subject to violent fluctuations, a 5 -minute interval -may be used.) Assignment to Schedule: 1f, in the judgment of the City, an a�Gourfi �s 11 expected to have usage over 8,000 kwh per billing cycle, the Cit has the':o tion of p g p g Y Y P placing the account immed i a to ly on Schedule G2, When an account billed on Schedule G2 permanently changes the nature:of electrical operations to such an extent that the -• count qualifies for _Sch0d0leGi t or 63, such billing change will be made as soon as rticable after verification of -,.,:r ng •. said changes. It shall be the responsibility of the customer to notify the City: of any such changes. y If energy consumption drops below 8,000 kwh and remains there. for 12 3 consecutive months, the City will transfer the account to Schedule GI.' If the demand reaches or exceed 400 kilowatts (Vw) for 3 consecutive months, the account will be transferred to Schedule G3, RATES`: tt Customer Charge . . . . . . . . . . . . . . . . . . . . . . . . 50.00 i Demand Charge: All kw of billing demand, per kw . . . . . . . . . . . . . 3.00 Energy Charge:(per kwh) Summer (troy through October) . . . . . . . . . . . . . . . 0822 Winter (November through April) . . . . . . . . . . . . . . . .06440 r The monthly charge for service under Schedule G2• i s the sum of the Customer Charge, Demand Charge and Energy Charge. 7T�'="- n i;")-1 /^ E ffarl-iva Nnvpmbpr 1 _ lgpc Canceling Resolution No. 8EE._]/ 7 Ordinance ido. 1464 p.G2-2/2 Effecti-e November 1, 198° rarice Iina Resolution No. 8°-17i Ordinance No. 14;4 ............. . _.... .. .-......... ... . ... CITY OrLODi ELECTRIC UTILITY DEPARTMENT SCHEDULE G3 GENERAL SERVICE - GROUP 3 COMMERCIAL/ I NDUSTMA-1 APPLICABILITY: Schedule G3 shall be applied to accounts with demands of 400 kilowatts (kw) or more for 3 consecutive months. Demand: The billing -period and peak -period demands will be the maximum average power taken during any 15 -minute interval in the billing -period and peak -period, respectively, but not less than the diversified resistance welder load. In cases where the use of energy is intermittent or subject to violent' fluctuations, a 5 -minute interval may be used, Assignment to Schedule: if, in the judgment of the City, an account. is expected to have demand over 400 kw per billing cycle, the City has the option of placing the account irrmediately on Schedule G3. When an account. billed on Schedule G3 permanently changes the nature of electrical operations to such an extent that the account qualifies for Schedule G2 or G1, such billing change will be made as soon as practicable after verificationof.: said changes. It shall be the responsibility of the customer to notify the .City of. any such changes. If billing -period demand drops below 400 kw and remains there for 12 consecutive months, the City will transfer tho account to a different applicable rate schedule. RATES: Customer Charge • • • • • • • • • • • • • • • • • • • • • • • $ 100 , OC r Service Voltage: Secondary (G3 -S) Primary (G34) Transmission (G3 -TA j Season: Summer 4linter Sumer Winter Summer Winter Demand Charges: Per kw of peak - period demand $8.75 __ f8.00 __ S7.75 Per kw of billing - period demand 3.00 53.00 1.90 S1.90 1.35 51.35 Energy Charges: Peak period (perkwh) ,01190 -- .01206 .07000 Partial -peak poriod (per kwh) .07394 .07356 .06923 .06533 .06850 .0�;?00 Off -peal; perior, (Der 1,A) 04713 .04263 .04134 .04006 .04000 .03900 fy.G31-1 3 Erre- ive November J , 10 PC Caance11inc ?es o it;tior, i/.), ME" --1L/ ;Nil. 4` r TYPES OF CHARGES: The monthly charge for service under Schedule 63 is the sum of the Customer Charge, Demand Charges and Energy Charges: - The Customer Charge is a f l at monthly fee. - Schedule G3 has two Demand Charges, a peak -period Oemand Charge and a billing -period Demand Charge. The peak -period Demand Charge per kilowatt applies to the maximum demand during the billing -cycle's peak hours, and the tilling -period Demand Charge per kilowatt applies to the maximum demand at any time during the billing cycle. The bill will include both of these Demand Charges. Time periods are defined below. - The Energy Charge is the sun of the Energy Charges from the peak, partial peak, and off-peak periods. Energy is billed by the kilowatt-hour (kwh). Time periods are defined below. - Monthly charges may be decreased or increased based upon power factor as defined below. - As shown on the rates above, Demand and Energy Charges are based on the voltage at which service is taken. Service oltages are defined below. DEk'INtHON OF SERVICE VOLTAGE: The three service voltage classes of 63 rates are: a, Transmission: Service Vo tage class for service at 60,000 volts. b. Primary: Service Voltage class for service at 12,000 volts. c. Secondary: Service Voltage class for- service at all other available voltages POWER FACTOR ADJUSTMEWTS : Bills will be adjusted for hilling cycle average power factor as follows: The total charge (except taxes and customer charge) for any billing cycle as comp;!ted on the above rate shall be decreas_d or increased, respectively, by 0.0006% for each 0.01 percentage point that the average power factor of the customer's load in the billing cycle is greater or less than 85.00;.. such average power factor to he computed (to the nearest hundredth of a percent) from the ratio of lagging kilovolt ampere -hours to kilowatt. -hours consumed in the billing cycle. Customers_ vith service entrance equipment unable to accommodate the City's reactive metering equipment shall have their- billing- power {actor determined by appropriate'testino performed by the Citi-. G- 2! 3 r_ffective Novem;,n; 1. IOOG Canceling Resi iu,ic�n l:o. 8t>-1'77 C'~din[inc£ hc. 140 7 CITY 01'LODI ELECTRIC UTILITY DEPARTMENT t DEFINITION OF TIME PERIODS . Times of the year and times of the day are defined as follows: s SUMMER May 1 through October 31: r Peak: 3:00 p.m. to 7:00 p.m. Monday through Friday (except holidays). Partial -Peak: 8:30 a.m. to 3:00 p.m. and 7:00 p.m, to 9:30 p.m. Monday through Friday (except hol i days). Off -Peak: 9:30 p.m. to 8:30 a.m. Monday through Friday and ail day Saturday, Sunday and holidays. WINTER: November 1 through April 30: n }< Partial -Peak: 8:30 a.m. to 9:30 p.m. Monday through Friday (except holidays), Off -Peak: 9:30 p.m. to 8:30 a.m. Monday through Friday. and all day ' A f, Saturday, Sunday and holidays. HOLIDAYS "Holidays" for the purpose of this rate schedule are New Year's 1 Day, Presidents' Day, Memorial Day, Independence Day, tabor Day,, Veterans' Day, s Thanksgiving Day, the day after Thanksgiving Day and Christmas Day. The !� dates will be based on those days on which the holidays are observed as specified in Public Law 90-363 (U.S.C.A. Section 6103). p.G3-3/3 Effective November- 1 , 1U1110 Canceling Resoltition No. � - Ordinance No. 1'r-:� e ELECTRIC UTILITY DEPARTMENT SCHEDULE EP Cenceling Resolution No. 88-127 F �dl Y 9 • q ryth4 Fs. sc44 :a , i i h' i� p.EF-1!1 Effective November 1, 1989 Ordinance -No. 1464 CITY Or'LOD1 ELECTRIC UTILITY DEPARTMENT SCHEDULE SS STANDBY SEF -V -LU s APPLICABILITY: 1 , Schedule SS is applicable to commercial/industrial customers who would,<.<:r}' otherwise qualify for Schedule 63 and who operate a pfivately-owned generating plant. -5•;: and where the City must stand ready to supply electric service to replace suth plant. RATES : Per Custmar,-4wned, Plant Per Month Customer Charge . . . . . . . . . . . . . . . . . . . . . . . X100 00 �+ Standby Charge: Contract capacity, per kw. . . . . . . . . . . . . . . . 3,00 h Standby Demand Charge: Per kw of peak standby demand Per kw of partial - peak standby demand Per kw of off-peak standby demand $11.75 $3.00 $9.90 $1.•90 $9.10 1-11.75 $3.00 $9.90 $1.90 $9.10 Time periods are defined in Schedule 63. $1.35' Summer Season: The maximum capacity expressed in kw, by interval, in a billing cycle during peak and partial -peak periods will be billed at :he standby demand charge rate for 12 consecutive months heginning with the month in which the capacity was provided. Standby demand charges occurring more than once in a 12 -month period will not be additive. However, the largest demand charge will be used for 12 months for billing purposes. The maximum capacity expressed in by interval, in a billing cycle during off -peal: periods will be billed at the standby demand rate for the month of occurrence, only. SS hlovember 1 19F.9 Cancclino_ Resolution I,e, K-127 ordinance too 1464 , t; CITY Of• tODI ELECTRIC UTILITY DEPARTMENT f Winter Season: The maximum capacity expresed in kw, by interval, in a billing cycle during partial -peak and off-peak periods will be billed at the y,^ standby demand rate for the month of occurrence, only. t Energy Charge: , All energy provided by the City will be billed at the Schedule G3 rate for the, applicable service voltage, season and periods as defined in Scheduie 63. yF ;,;• Reactive Demand Charge: r >> Per k v a r of maximum reactive demand. . . . . , . . . . . . $1.OD SPECIAL-`ONDITIONS ::': (a) CONTRACT: This schedule is available only for each specific service connection point on a contract basis to industrial customers for each customer -owned generating plant as authorized by the City Council. Each contract term shall IM -10r'. the service life of the customer -owned generating plant and shall oblioate,.: the° rte, 7: customer t o pay f o r Customer Standby and Standby Deni3nd Charges f o r the contract ; term. The contract shall provide, among other things, that if service v- cancelled lr prior to expiration of the cortract period, the customer shall pay the :total -Standby Charges for the unexpired term of the contract and any outstanding Standby Beinand Charges. t (b) CONTRACT CAPACITY: Contract Capacity is the nameplate rating of the J. customer -owned generating plant. (c) EXCESS CAPACITY: Capacity supplied by the customer -owned generating plant in excess of the measured load at the customer's service connection nnint shall hp considered inadvertent and no demand or energy adjustment shall be given. i (d) LIMITATION Off CONTRACT CAPACITY SERVED: Standby Service to new or increased loads is limited by the City's ability to serve such lnarie withn,it f. jeopardizing service to existing customers on rate schedules for firm service, including standby service. (e) RENDERING OF BILLS: All bills, including opening and closing bills, will be based on moter registration, except as otherwise provided in the City's Rules and Regulations or rate schedule. Should the billing period be less than one billing cycle, no proration will he made and the amount of the bill shall be determined in accordance with the schedule it? effect at the time of the end of the normal moter reading period. Standhy Demand Charges Will, not be applied in a cumulative manner. (f) TOTALIZING: Totalizing of a customer's meter readings from more than, one service connection point for billing purpcses will not be done if one or more such service connections are receivine `tandbv Service. p . S 5 - 2 / 3 Effective I\1ovember 1. 1984 Canceling Resolution iso. 66-1z 0 i - d ir,ance Nc,. 4EN4 M31F CITY O r LODI ELECTRIC UTILITY DEPARTMENT (g) DEMAND READINGS: Dei and readings will be based on 15 -minute intervals. (h) PARALLEL OPERATION: Any customer on this schedule intending to onerate;;a generating plant in parallel with the City's electric system must construct.'and_. V" operate such plant in accordance with applicable Rules and Regulation -s. FicwQver,`: a; customer who operates its generating plant in parallel must assume responsib,ili`ty for protecting the City and other parties from damage resulting from negligent. operation. (i) METERIM: The City will furnish, own and maintain, at its expense,:'the::< ;r , normal metering for the size and type of load served. The City.ys.f1j,""furnish.. o­n'.� and maintain, at the customer's expense, other metering equipment tha t the Xtty. determines to be necessary on both the s,,rvice and the customer -owned oeneratiny plant. The customer shall provide facilities to accommodate such mialzring. Meters shall not allow reverse registration. (j) REACTIVE DEMAND CHARGE: Wbm the customer owned generat' operated in parallel with the City's system, the customer will desligi' ;and . oPer its facilities such that the reactive current requirements of the`:.po`rtion-of°.'..tte°-; =* Customer's load supplied from such plant are not supplied at any time; :fr0111 `' tite~°T? City's system. 'If the City determines by test that the Custome r=own.ed-•.:gerierayting lant is placing a reactive demand on the City's electric sys;tem ;exces's var per kw of Contract Capacity, the Reactive Deirrmxl Charge, shall `tie-effecti,ve;;.�o; that month and each subsequent month until the customer demonstrates to the. City's satisfaction that adequate correction has been provided. ' � .. ; ' •,fit, P.cc_313 Effective November 1. 1989 �ancel ink =rc ':�;,.ipn P:c. 8 -lt Ordinance Pip. 1146.4