HomeMy WebLinkAboutAgenda Report - September 20, 1989 (81)C U N C I L
TO: THE CITY COUNCIL
FROM : THE CITY MANAGER'S OFFICE
COMMUNICATION
COUNCIL MEETING GATE:
SEPTEMBER 20, 1989
SUBJECT: PURCHASE OF SUBSTATION 60 -KV STEEL STRUCTURES fEUD-39-3)
RECOMMENDED ACTION: That the City Council award the bid fur tree purchase of
various substation steel structures and a tubular steel transn,i ss i on pole to the
low bidder in each category as follows:
Substation Steel Structures
Di s -Tran Products, Inc.
Alexandria , LA $167,519.22
Tubular Steel Transmission Pole:
Power Structures, Inc.
Belle Chasse, LA S 6,938.76
BACKGROUND INFORMATI0N: This equipment will be installed to support the
Industrial Substation 60-kv bus structure and a transmission line entering the
stption.
aaolo-�
t
Henry J. Rice
Electric Utilit'�� Director
Attach.
cr:: Assist. Electric Utility Director
Electrical Engineer
Purchasing Officer
CC/89/ 9/ TY.T;,! . 01P
BID EVALUATION EUD-89-9
SUBSTATION 60 -KV STEEL STRUCTURES
Price Including Tax
Tubular Steel
Substation Transmission Delivery
SuP?i-er Structures Pole Weeks
Dis-Tran Products, Inc.
Alexandria, L4 :167,519.22
Power Structures , inc.
Belle Chasse, LA 220,840.40
5IOS89/9/T?,TU.01D
No Bid 20-26
$6,938.76 18-26
Manufacturer
Dis-Tran Products
Alexandria, LA
Power Structures
Belle Chasse, LR
RESOLUTION NO. 89-127
A RESOLUTION OF THE LODI CITY COUNCIL
AWARDING THE BIG FOR PURCHASE OF SUBSTATION 60 -KV STEEL STRUCTURES (EUD-89-9)
VdIEREAS, in answer to notice duly published in accordance with law and
the order of this City Council, sealed bids were received and publicly opened on
September 6, 1989 at 11:00 a.m. for the bid for various substation steel structures
and a tubular steel transmission pole, described in the specifications therefor
approved by the City Council on August 16, 1989, 1989; and
WHEREAS, said bids have been compared, checked, and tabulated and a
report thereof filed with the City Manager as follows:
Substation Steel Structures:
Dis-Tran Products, Inc.
Alexandria, LA 'i167,519.22
uuular Steel Transmission Pole:
Power Structures, Inc.
Belle Chasse, LA S 6,938.76
NOW, THEREFORE, EE IT RESOLVED by the City Council of the City of Lodi that
award of bid for various substation 60 -KV Steel Structures and Tublar Steel
Transmission Pole be and the same is hereby awarded to Dis-Tran Products, Inc. and
Power Structures, Inc., the low bidders, in ins amount of 5167.519.22 and S6,93E.76
respectively .
Gated: September 20, 1929
Price Including Tax
Tubular Steel
Substation Transmission
Delivery
SuoDlier
Structures Pole
(Weeks)
Manufacturer
`' , --Z - T ran Products, Inc.
ui s- ran ro ucts
Alexandria, LA
$167,519.22 I*,b R1 d
20-26
Alexandria, LA
Power Structures, Inc.
Power Structures
Belle Chasse, LA
220,840.40 $6,938.76
19-26
Bel 1 e Chasse ,
LA
WHEREAS, the
City Manager recommends that
award of the
bid for various
substation steel structures
and a tubular steel transmission pole,
be made to the low
bidders as follows:
Substation Steel Structures:
Dis-Tran Products, Inc.
Alexandria, LA 'i167,519.22
uuular Steel Transmission Pole:
Power Structures, Inc.
Belle Chasse, LA S 6,938.76
NOW, THEREFORE, EE IT RESOLVED by the City Council of the City of Lodi that
award of bid for various substation 60 -KV Steel Structures and Tublar Steel
Transmission Pole be and the same is hereby awarded to Dis-Tran Products, Inc. and
Power Structures, Inc., the low bidders, in ins amount of 5167.519.22 and S6,93E.76
respectively .
Gated: September 20, 1929
I hereby certify that Resolution No. 89-127 was passed and adopted
by the City Council o f the C . `.y of Lodi i n a regul ar meeting
held September 20, 1989 by the following vote:
Ayns: Council Members - Hinchman, Olson, Pinkerton, Reid and
Snider (Mayor)
Noes: Council Members - None
Absent: Council Members - None
Nate (
Alice M. Reimche
City Clerk