Loading...
HomeMy WebLinkAboutAgenda Report - September 20, 1989 (81)C U N C I L TO: THE CITY COUNCIL FROM : THE CITY MANAGER'S OFFICE COMMUNICATION COUNCIL MEETING GATE: SEPTEMBER 20, 1989 SUBJECT: PURCHASE OF SUBSTATION 60 -KV STEEL STRUCTURES fEUD-39-3) RECOMMENDED ACTION: That the City Council award the bid fur tree purchase of various substation steel structures and a tubular steel transn,i ss i on pole to the low bidder in each category as follows: Substation Steel Structures Di s -Tran Products, Inc. Alexandria , LA $167,519.22 Tubular Steel Transmission Pole: Power Structures, Inc. Belle Chasse, LA S 6,938.76 BACKGROUND INFORMATI0N: This equipment will be installed to support the Industrial Substation 60-kv bus structure and a transmission line entering the stption. aaolo-� t Henry J. Rice Electric Utilit'�� Director Attach. cr:: Assist. Electric Utility Director Electrical Engineer Purchasing Officer CC/89/ 9/ TY.T;,! . 01P BID EVALUATION EUD-89-9 SUBSTATION 60 -KV STEEL STRUCTURES Price Including Tax Tubular Steel Substation Transmission Delivery SuP?i-er Structures Pole Weeks Dis-Tran Products, Inc. Alexandria, L4 :167,519.22 Power Structures , inc. Belle Chasse, LA 220,840.40 5IOS89/9/T?,TU.01D No Bid 20-26 $6,938.76 18-26 Manufacturer Dis-Tran Products Alexandria, LA Power Structures Belle Chasse, LR RESOLUTION NO. 89-127 A RESOLUTION OF THE LODI CITY COUNCIL AWARDING THE BIG FOR PURCHASE OF SUBSTATION 60 -KV STEEL STRUCTURES (EUD-89-9) VdIEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened on September 6, 1989 at 11:00 a.m. for the bid for various substation steel structures and a tubular steel transmission pole, described in the specifications therefor approved by the City Council on August 16, 1989, 1989; and WHEREAS, said bids have been compared, checked, and tabulated and a report thereof filed with the City Manager as follows: Substation Steel Structures: Dis-Tran Products, Inc. Alexandria, LA 'i167,519.22 uuular Steel Transmission Pole: Power Structures, Inc. Belle Chasse, LA S 6,938.76 NOW, THEREFORE, EE IT RESOLVED by the City Council of the City of Lodi that award of bid for various substation 60 -KV Steel Structures and Tublar Steel Transmission Pole be and the same is hereby awarded to Dis-Tran Products, Inc. and Power Structures, Inc., the low bidders, in ins amount of 5167.519.22 and S6,93E.76 respectively . Gated: September 20, 1929 Price Including Tax Tubular Steel Substation Transmission Delivery SuoDlier Structures Pole (Weeks) Manufacturer `' , --Z - T ran Products, Inc. ui s- ran ro ucts Alexandria, LA $167,519.22 I*,b R1 d 20-26 Alexandria, LA Power Structures, Inc. Power Structures Belle Chasse, LA 220,840.40 $6,938.76 19-26 Bel 1 e Chasse , LA WHEREAS, the City Manager recommends that award of the bid for various substation steel structures and a tubular steel transmission pole, be made to the low bidders as follows: Substation Steel Structures: Dis-Tran Products, Inc. Alexandria, LA 'i167,519.22 uuular Steel Transmission Pole: Power Structures, Inc. Belle Chasse, LA S 6,938.76 NOW, THEREFORE, EE IT RESOLVED by the City Council of the City of Lodi that award of bid for various substation 60 -KV Steel Structures and Tublar Steel Transmission Pole be and the same is hereby awarded to Dis-Tran Products, Inc. and Power Structures, Inc., the low bidders, in ins amount of 5167.519.22 and S6,93E.76 respectively . Gated: September 20, 1929 I hereby certify that Resolution No. 89-127 was passed and adopted by the City Council o f the C . `.y of Lodi i n a regul ar meeting held September 20, 1989 by the following vote: Ayns: Council Members - Hinchman, Olson, Pinkerton, Reid and Snider (Mayor) Noes: Council Members - None Absent: Council Members - None Nate ( Alice M. Reimche City Clerk RESS912;/'CXTA.02J