HomeMy WebLinkAboutAgenda Report - August 16, 1989 (59)�1K Qf r0
'may 1a
4
z
TO :
FROM:
1V>< TNG DATE
City Council
City Manager
August 16, 1989
COUNCIL COMMUNICATION
AGENDA TTILE: Request for Proposals for Wastewater Col' lction ! fstem
Management Software Program
RECOMMENDED_ _ACTION: That the, City Council approve the attached Request for
Proposals for Wastewater Collection System Management Software Program.
BACKGROUND _ll4URMAJM- The approved 1987/88 Wastewater Capital Outlay
Budget includes an allocation of 530,000 for the acquisition of computer
hardware, software, and training for a computerized wastewater collection
system management program. This program will be used for scheduling,
tracking, and generating work orders for routine, scheduled, and unscheduled
maintenance work.
The budgeted amount includes the following:
Computer $ 5,000
Software $ 4,000
Data Entry $21,000
The major expense i s for entering the existing system attributes (pipe size,
length, manhole locations, etc.). This will provide a fully functional ,
turnkey packa9p.
Jac' L. Ronsko
Pubic Works Director
JLR/PN/mt
At a chment
cc: Water/Wastewater Supervisor Hassey
Water/Wastewater Superintendent
Purchasing Officer
NNIS Committee
APPROVED:
A.PETERSON. Ci tv Manager
FILE NO.
CITY COUNCIL
JOHN R. [Randy) SNIDER. Mayor
DAVID M. HISCHMAN
Mayor Pro Tempore
EVELYN M.OLSON
JAMESW. PINKERTON, Jr.
FRED M.REID
To Prospective Suppliers:
CITY HALL. 221 WEST PINE STREET
CALL BOX 3006
LODI, CALIFORNIA 95241-1910
(209)334-5634
TELECOPiER UN) 333-6795
August 1989
THOMAS A. PETERSON
Citv Managei
ALICE M.REIMCHE
City Clerk
BOB MCNATT
City Attorney
The City of Lodi is requesting proposals for a Wastewater Collection System
Management (WCSM) Software Program. The program is to be used for
scheduling, tracking, and generating work orders for both preventive and
nonscheduled maintenance work and for general system management. Proposais
must be for a complete and fully supported software package, including
initial data entry. Detailed requirements are contained in the document
"Request for Proposals - Wastewater Collection System Management Software
Program for the City of Lodi" available at the office of the Public Works
Director, City of Lodi, 221 West Pine Street, Call Box 3006, Lodi,
California, 95241-1910, (telephone 209-333-6706).
Sealed proposals will be received by the Purchasing Officer at the above
address until 11:00 a.m. , Friday, September 22, 1989, at which time they
will be publicly opened and read.
The City reserves the right to reject any
select a packa e best suited to the City's
Jack Ronsko
u"
,
-,c Works Director
Enclosure
JLR/RCP/mt
or all the proposals and to
needs.
NOTE: If you have questions or comments concerning the request for
proposals, please contact:
F. Patrick Hassey
Water/t•:astelvater Supervisor
(209) 333-6740
1,!WSOFTWA; TXTW.02M
CITY OF LSI
PUBLIC VkRKS DEPARTMENT
WATER/WASTEWATER DIVISION
WASTEWATER COLLECTION SYSTEM MANAGEMENT SOFTWARE PROGRAM
REQUEST FOR PROPOSALS
TABLE OF CONTENTS
II. APPLICATION
A. General Background
B. Application Details
1. System inventory
2. Maintenance Activities
3. Systein Management
III. SOFTWARE
A. General Requirements
B. Software Features
1. Required Features
2. Desirablc Features
C. Software Support
IV. DATA
ENTRY
A,
General Requirements
B.
Specific Requirements
V. INSTALLATION
AND TRAINING
A.
Installation
B.
Training
VI. FAYMENT
VII. PROPOSAL REQUIREMENTS
REQUEST FOR PROPCXSALS
WASTEWATER COLLECTION SYSTEM MANAGEMENT SOFTWARE PROGRAM
FOR THE
CITY OF LODI
'•� •
The Wastewater Collection System Management (WCSM) software program
is to be used by the City Public Works Department, Water/Wastewater
Division, to schedule, track, and generate work orders for both
preventive and nonscheduled maintenance work. The WCSM should
maintain an inventory of facilities and keep a history of activities
and TV records for manholes and lines, including service laterals.
Emphasis should be on activities, conditions, stoppages, and
problems. The software shall be simple and understandable to
nontechnical users.
II. APPLICATION INFORMATION
A. General Background
The City of Lodi has a population o f 50,000 within 9. 1 square
miles (5,800 acres) of mostly developed land (approximately
18,000 parcels).
There are approximately 165 miles of wastewater lines and 2,550
manholes, The City anticipates growing at an average rate of 2%
per year.
The software must run a Hewlett-Packard Vectra Personal Computer,
Mouel ES/12, with 640K RAM, 40 Mb hard disk, 5-1/4" or 3-1/2"
floppy disk, MSDOS 3.3, and HP Quietjet printer.
B. Application Details
1. System, . nventory - The WCSM shall keep an inventory of at
least the following physical features and attributes:
a) Manhole number, location/address, map sheet reference,
rim elevation.
b) Pipe size, length, material, ;nvert elevations, year
built.
c) Service lateral address, map sheet reference.
d) Appropriate mnhole/pipe/lateral linF:s.
e) P;pe slope and depth shall be calculated from other data.
2. Maintenance Activities - The IICSM shall manage variouS
maintc—ance activities:
a) Generate preventive maintenance schedules and work orders
b) hack prevPntive and ur:sc`1::duled :j,,n t ,mance asks
c) Keep a record of inspections including closed circuit
television reports and pipe deflection/sag data_
3. System Management - The WCSM shall include cost, work
production, and related information in order to produce
management reports such as:
a) Annual maintenance task summaries.
b) Future maintenance needs.
c) Cost reports including materials, equipment, and labor
costs .
d) Future replacement/rehabilitation needs based on
maintenance record, age, and other user selectable
criteria.
III. SOFTWARE
A. General Requirements
The software shall be a fully integrated data base management
system including data entry, reports and inquiries, and data
management. The software shall not rely on operator knowledge of
the computer's operating system. However, access to the
operating system must be easily available since the City wishes
to use the computer for other program.
The system shall not be copy protected.
Disc space required for storage of the VVa4 program shall be
indicated in the proposal. The supplier shall estimate the
storage requirements of the data indicated in Section iI of this
RFP.
Systems having optional modules or auxiliary programs shall be
clearly identified as to what is included in the proposal.
Options and interfaces to other programs/languages shall be
described.
B. Software Features
The complexity of WCSM software precludes listing detailed
requirements in the RFP. The proposal shall include sufficient
descriptions of the software capabilities and command structure
to allow the City to evaluate the stem. Suppliers are
encouraged to emphasize features applicable to the City's
appl ication. I t is suggested that a set of actual user manual s
and demons ration disc be included in the proposal. (the City
will return any proposal materials requested by the supplier at
the end of the evaluation.)
1. Required Features - The program shal l have the f(;l iowing
features:
a) Couanand as well as meru driven to more efficiently switch
from screen to screen.
b) Table-driven crocess to allow the user(s) to tailor codes
and descriptions to their own needs.
c) Date selectabie archive process to floppy disc to free
space OR hard disc.
d) Back-up process that does not require operator's use of
DOS .
e Multi-level user security allowing read-only as well as
read-write access.
f) Preformatted reports as well as an ad hoc query system to
generate custom reports.
g) Well -organized, indexed User's Manual , understandable to
nontechnical operators.
2. Desirable Features
a) CAD system interface capability.
b) Selectabl:i data output to disc file for use in other
programs ( i .e. , spreadsheet, graphics, database, system
hydraul i c model) .
C) Rehabilitation alternatives analysis including costs.
d) Multi-user ability within a local network.
e) Ability to accommodate separate systems such as storm
drains or industrial waste.
f) Link to portable computer for direct field entry of data.
C. Software Support
The proposal shall describe software support including the
fol lowing:
1. Help with software questions and problems including number of
support personnel and hours of operation.
2. Helb with softwareJharduare interface questions and problems.
3. User group program
4. Software updates and enhancements.
IV. DATA ENTRY
A. General Requirements
The vendor shall review existing City data and include in the
proposal cost to enter, verify, and cross-reference the requested
data. The data to be entered does not include all information
the systeiii i s to be able to handle. The City intends t e enter
this additional data as it becommes available. The system shall
be functional as appropriate with missing or incomplete aata.
For example, if elevation data is entered for only trunklines, a
report including stoppages and pipe slope shall include only the
trunk i Ines.
B. Specific Requirements
The specific information to be entered i s :
I. Manhole number, address or`street intersection, map -
reference, connecting pipes, pipe size and iength - see
attached sample maps, Exhibits A & B (a complete set can be
made available upon request).
2. Unscheduled maintenance reports (approximately 1,000 entries)
- see attached Exhibit C, which shows 28 entries; this will
require the use of the appropriate system map and an address
map in order to reference addresses to manhole numbers.
3. Scheduled maintenance reports (approximately 325) - see
attached Exhibits D & E.
4. TV inspection log (approximately 300 sheets) - see attached
Exhibit F.
V. 1NSTALLAUON AND TRAPESK
A. Installation
The proposal shall include delivery, installation, and testing of
all software. The PC to he used i s already set up and is
functional.
P. Trainino
The proposal shall include recommended softwsre training. The
training shall include taro phases:
1. System overview, capabilities, arid custor report generation -
primarily for management personnel whc will supervise overall
system use and implementation.
2. System operation - primarily for systen operators (clerical
staff and maintenance supervisors) who will 'actually use the
system, including data entry and report. generation.
l•:WSC Fb:«; 1XTV• .CC
On-line training courses and "help" screens shall be described.
The proposal shall indicate the duration of all proposed
training. Training shall be in Lodi usina the City's system and
data. All supplier expenses involved in training shall be
included. Cost for additions? training over the vendor's
recommended amount shall be indicated.
VI. PRICE AND -PAYMENT
The proposal shall clearly indicate the itemized price of the
software, data entry support, training, and miscellaneous items
requested in this RFP. All prices shall be current.
A71 quotations shall be protected from price increases for a minimum
of 30 days. Sales tax on applicable items shall be included.
Upon completion of installation and testing of software, the City
will pay 90%of the purchase price of the items included.
Upon completion of training, the City will pay 100ro of the price for
training.
Curing the 30 days following the completion of installation/testing
or training, whichever is last, the City will use and test the
system. Following satisfactory completion of this test period, final
payment will be made.
Payment for maintenance and support will be in accordance with tei-ms
agreed to between the City and the supplier.
VII. PROFOSAL REQUIREMENTS
In addition to the items specifically requested i n this RFP, the
proposal shall include the following information:
A, Background description of the software including introduction
data, revision history, and company background.
B. List of west coast users of the proposed system, including
contact person and telephone number.
C. A copy of the soft%•:are license agreement.
D. Availability of demonstrations.
E. Background description of the software, including introduction
dates, aroouctien history, cOnpany history, and anticipated
upgrades.
F. Other maintenance management programs available such as water
distribution system, waste�,iater plant, :rater �.iell/lift station,
vehicle and equipment, and building.
G. W ivery time from date of order including data entry.
H. Cost breakdown, including itemization where appropriate (such as
dollars per TV inspection report data entry), and total cost with
options and "not -included" items clearly identified.
I. Name and telephone number of supplier contact person who can
answer ,technical questions about the proposed system.