Loading...
HomeMy WebLinkAboutAgenda Report - August 15, 2012 C-14AGENDA ITEM C4r' 4 (1)CITY OF LODI COUNCIL COMMUNICATION ,M AGENDA TITLE: Adopt Resolution Authorizing City Manager to Execute Contract for Well 6R Granular Activated Carbon Treatment System with Vinciguerra Construction, of Jackson ($596,810) MEETING DATE: August 15,2012 PREPARED BY: Public Works Director RECOMMENDED ACTION: Adopt resolution authorizing City Manager to execute contract for Well 6R granular activated carbon treatment system with Vinciguerra Construction, of Jackson, in the amount of $596,810. BACKGROUND INFORMATION: This project consists of furnishing and installing a granular activated carbon (GAC) treatment system for Well 6R. Plans and specifications for this project were approved on June 20,2012. The City received the following seven bids for this project on July 18,2012. The lowest responsive bidder, Vinciguerra Construction, has signed the required Local Hire forms and will conform to the requirements. Bidder Location Bid Engineer's Estimate $ 654,235.00 Vinciguerra Construction Jackson $ 596,810.00 Diede Construction Woodbridge $ 619,875.87 ConcoWest, Inc. Manteca $ 651,190.00 Cal -Neva Construction West Sacramento $ 652, 658.00 Ford Construction Lodi $ 693, 960.00 Tidelands Construction Brentwood $ 711,335.00 Division 5-15 Corp. Gold River $ 782,000.60* `Corrected Figures FISCAL IMPACT: Annual operation and maintenance costsfor the water utilitywill increase as a result of this project. Operation costs are reimbursed through the City's DBCP settlement. FUNDING AVAILABLE: This project will be funded by Water Capital Outlay Fund (181048) . Jor an Ayers Deputy City Manager/Internal Se ices Director F. Wallv S delin Public Works Director Prepared by Lyman Chang, Senior Civil Engineer cc: Deputy Public Works Director— Utilities Senior Civil Engineer APPROVED KAWPTROJECTSMATERMeNR GAC Filter0dMAward.doc Koriradt Bartlam, City anager 7/23/2012 WELL 6111 GRANULAR ACTIVATED CARBON FILTER SYSTEM CONTRACT CITY OF LODI, CALIFORNIA THIS CONTRACT made by and between the CITY OF LODI, State of California, herein referred to as the "City," and VINCIGUERRA CONSTRUCTION, herein referred to as the "Contractor." WITNESSETH: That the parties hereto have mutually covenanted and agreed, and by these presents do covenant and agree with each other, as follows: The complete Contract consists of the following documents which are incorporated herein by this reference, to -wit: Notice Inviting Bids Information to Bidders General Provisions Special Provisions Bid Proposal Contract Contract Bonds Plans The July 1992 Edition, Standard Specifications, State of California, Business and Transportation Agency, Department of Transportation All of the above documents, sometimes hereinafter referred to as the "Contract Documents," are intended to cooperate so that any work called for in one and not mentioned in the other is to be executed the same as if mentioned in all said documents. ARTICLE I - That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the City and under the condition expressed in the two bonds bearing even date with these presents and hereunto annexed, the Contractor agrees with the City, at Contractor's cost and expense, to do all the work and furnish all the materials except such as are mentioned in the specifications to be furnished by the City, necessary to construct and complete in a good workmanlike and substantial manner and to the satisfaction of the City the proposed improvements as shown and described in the Contract Documents which are hereby made a part of the Contract. ARTICLE II - The City hereby promises and agrees with the Contractor to employ, and does hereby employ, the Contractor to provide all materials and services not supplied by the City and to do the work according to the terms and conditions for the price herein, and hereby contracts to pay the same as set forth in Section 5.600, "Measurement, Acceptance and Payment," of the General Provisions, in the manner and upon the conditions above set forth; and the said parties for themselves, their heirs, executors, administrators, successors and assigns, do hereby agree to the full performance of the covenants herein contained. ARTICLE III - The Contractor agrees to conform to the provisions of Chapter 1, Part 7, Division 2 of the Labor Code. The Contractor and any Subcontractor will pay the general prevailing wage rate and other employer payments for health and welfare, pension, vacation, travel time, and subsistence pay, apprenticeship or other training programs. The responsibility for compliance with these Labor Code requirements is on the prime contractor. Contract. DOC 1 07/24/12 ARTICLE IV - And the Contractor agrees to receive and accept the following prices as full compensation for furnishing all materials and for doing all the work contemplated and embraced in this agreement; also for all loss or damage arising out of the nature of the work aforesaid or from the action of the elements, or from any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution of the work until its acceptance by the City, and for all risks of every description connected with the work; also for all expenses incurred by or in consequence of the suspension or discontinuance of work and for well and faithfully completing the work, and the whole thereof, in the manner and according to the Plans and Contract Documents and the requirements of the Engineer underthem, to -wit: Perform the work necessary to furnish and install a granular activated carbon filter system, complete with carbon median, on-site piping and electrical system, 520 linear feet of 14 -inch water pipe, 311 linear feet of 12 -inch wastewater pipe, and other incidental and related work, all as shown on the plans and specifications for "Well 6R Granular Activated Carbon Filter System". CONTRACT ITEMS ITEM EST'D. NO. DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE Mobilization LS 1 $ 15,000.00 $ 15,000.00 Cleaning and Grubbing LS 1 $ 5,000.00 $ 5,000.00 Abandon Water Valve and Cap Water Pipe LS 1 $ 1,000.00 $ 1,000.00 Traffic Control LS 1 $ 2,500.00 $ 2,500.00 Water Pollution Control LS 1 $ 2,500.00 $ 2,500.00 Furnish GAC Filter System LS 1 $291,000.00 $ 291,000.00 Furnish GAC Media LS 1 $ 70,000.00 $ 70,000.00 Install GAC Filter System LS 1 $ 68,000.00 $ 68,000.00 Install 10 -Inch Water Valve EA 1 $ 2,800.00 $ 2,800.00 10. Install 10 -Inch Ductile Iron Water Pipe LF 22 $ 500.00 $ 11,000.00 Contract. DOC 2 07/24/12 ITEM EST'D. NO. DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE Install 14 -Inch Water Pipe LF 520 $ 90.00 $ 46,800.00 12. Install 3 -Inch Wastewater Pipe LF 12 $ 60.00 $ 720.00 13. Install 12 -Inch Wastewater Pipe LF 311 $ 90.00 $ 27,990.00 14. Install 48 -Inch Wastewater Manhole 15. Minor Concrete EA 1 $ 3,500.00 $ 3,500.00 CY 14 $ 800.00 $ 11,200.00 16. Install Removable Steel Bollard EA 2 $ 400.00 $ 800.00 Chain Link Fence with Mow -Strip LS 18. Electrical System LS 1 $ 17,000.00 $ 17,000.00 1 $ 20,000.00 $ 20,000.00 TOTAL $ 596,810.00 ARTICLE V - By my signature hereunder, as Contractor, I certify that I am aware of the provisions of Section 3700 of the Labor Code, which requires every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract. ARTICLE VI - It is further expressly agreed by and between the parties hereto that, should there be any conflict between the terms of this instrument and the Bid Proposal of the Contractor, then this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said proposal conflicting herewith. ARTICLE VII - The City is to furnish the necessary rights-of-way and easements and to establish lines and grades for the work as specified under the Special Provisions. All labor or materials not mentioned specifically as being done by the City will be supplied by the Contractor to accomplish the work as outlined in the specifications. ARTICLE VIII - The Contractor agrees to commence work pursuant to this contract within 15 calendar days after the City Manager has executed the contract and to diligently prosecute to completion within 125 WORKING DAYS. WHEN SIGNING THIS CONTRACT, THE CONTRACTOR AGREES THAT THE TIME OF COMPLETION FOR THIS CONTRACT IS REASONABLE AND THE CONTRACTOR AGREES Contract.DOC 3 07/24/12 TO PAY THE CITY LIQUIDATED DAMAGES AS SET FORTH IN SECTION 6-04.03 OF THE SPECIAL PROVISIONS. CONTRACTOR AGREES THAT THIS AMOUNT MAY BE DEDUCTED FROM THE AMOUNT DUE THE CONTRACTOR UNDER THE CONTRACT. IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands the year and date written below. IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands the year and date written below. CONTRACTOR: CITY OF LODI By: Title By: Konradt Bartlam City Manager Date: Attest: City Clerk (CORPORATE SEAL) Approved As To Form D. Stephen Sc ,quer City Attorney _ Contract. DO C 4 07/24/12 RESOLUTION NO. 2012-132 A RESOLUTION OF THE LODI CITY COUNCILAWARDING CONTRACTAND AUTHORIZING THE CITY MANAGERTO EXECUTE CONTRACT FOR WELL 6R GRANULAR ACTIVATED CARBON TREATMENT SYSTEM WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened on July 18, 2012, at 11:00 a.m., for Well 6R Granular Activated Carbon Treatment System, described in the plans and specifications therefore approved by the City Council on June 20, 2012; and WHEREAS, said bids have been checked and tabulated and a report thereof filed with the City Manager as follows: Bidder Bid Vinciguerra Construction $ 596,810.00 Diede Construction $ 619,875.87 ConcoWest, Inc. $ 651,190.00 Cal -Neva Construction $ 652,658.00 Ford Construction $ 693,960.00 Tidelands Construction $ 711,335.00 Division 5-15 Corp. $ 782,000.60* "Corrected Figures WHEREAS, staff recommends awarding the contract for Well 6R Granular Activated Carbon Treatment System to the low bidder, Vinciguerra Construction, of Jackson, California, in the amount of $596,810. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby award the contract for Well 6R Granular Activated Carbon Treatment System to the low bidder, Vinciguerra Construction, cf Jackson, California, in the amount cf $596,810; and BE IT FURTHER RESOLVED that the City Manager is hereby authorized to execute the contract. Dated: August 15, 2012 hereby certify that Resolution No. 2012-132 was passed and adopted by the City Council of the City of Lodi in a regular meeting held August 15, 2012, by the following vote: AYES: COUNCIL MEMBERS — Hansen, Johnson, Katzakian, Nakanishi, and Mayor Mounce NOES: COUNCIL MEMBERS— None ABSENT: COUNCIL MEMBERS — None ABSTAIN: COUNCIL MEMBERS — None ANN .inMl City Clerk 2012-132