Loading...
HomeMy WebLinkAboutAgenda Report - August 15, 2012 C-12AGENDA ITEM Co 120 (1)CITY OF LODI COUNCIL COMMUNICATION TM AGENDA TITLE: Adopt Resolution Authorizing City Manager to Execute Contract for City Hall Parking Lot Reconstruction Project with A. M. Stephens Construction Company, Inc., of Lodi ($238,877.65) and Appropriating Funds ($100,000) MEETING DATE: August 15, 2012 PREPARED BY: Public Works Director RECOMMENDED ACTION: Adopt resolution authorizing City Managerto execute contract for City Hall parking lot reconstruction project with A. M. Stephens Construction Company, Inc., of Lodi, in the amount of $238,877.65 and appropriating funds in the amount of $100,000. BACKGROUND INFORMATION: This project consists of reconstructing the City Hall parking lot with asphalt concrete, constructing a trash enclosure, installing handicap -accessible parking stalls, and other incidental and related work, all as shown on the plans and specifications for the project. This project also includes the removal of four existing Arizona ash trees in the parking lot. The trees are in poor condition, and their roots are raising the concrete curb and asphalt pavement. Four new Chinese Pistache trees will be planted as their replacement (ExhibitA). Plans and specifications for this project were approved on June 20, 2012. The City received the following three bids for this project on July 25, 2012. The lowest responsive bidder, A. M. Stephens Construction Company, has signed the required Local Hire forms and will conform to the requirements. Bidder Location Bid Engineer's Estimate $ 227,217.50 A. M. Stephens Construction Lodi $ 238,877.65 Vinciguerra Construction Jackson $ 318,476.00 George Reed, Inc. Modesto $ 337,994.00 Staff recommends appropriating $100,000 in addition to funds allocated in the FY 2012/13 budgetto cover City staff time, project -related costs and contingencies. FISCAL IMPACT: The project will decrease maintenance costs and implement additional elements of the City's ADA Transition Plan. APPROVED: Konradt Bartlam, City Manager K:\WP\PROJECTS\MISC\CityHallParkingLot\CAward.doc 8/6/2012 Adopt Resolution Authorizing City Manager to Execute Contract for City Hall Parking Lot Reconstruction Project with A. M. Stephens Construction Company, Inc., of Lodi ($238,877.65) and Appropriating Funds ($100,000) August 15, 2012 Page 2 FUNDING AVAILABLE: Requested Appropriation: Street Fund (320123): Existing Funding: Street Fund (320123) General Fund (1211785) Total $ 100,000 $ 150,000 (FY 12/13) 50.00 (FY12/13) $ 300,000 Jordan Ayers Deputy City Manager/Int rnal Services Director F. Wally S0 delin Public Works Director Prepared by Lyman Chang, Senior Civil Engineer FWS/LC/pmf Attachment cc: Deputy Public Works Director— Utilities Senior Civil Engineer PUBLIC SAFETY BUILDING 7l//7/T/T/T/T/T/� II FIRE STATION NO. 1 5' 1 yl _� I -i /7 MAINTENA EXISTING TREES TO BE REPLACE[ I PINE ST z U Z) 2 U CITY HALL PARKING LOT IMPROVEMENTS 221 West Pine Street CONTRACT CITY OF LODI, CALIFORNIA THIS CONTRACT made by and between the CITY OF LODI, State of California, herein referred to as the "City," and A. M. STEPHENS CONSTRUCTION COMPANY, INC., herein referred to as the "Contractor." WITNESSETH: That the parties hereto have mutually covenanted and agreed, and by these presents do covenant and agree with each other, as follows: The complete Contract consists of the following documents which are incorporated herein by this reference, to -wit: Notice Inviting Bids Information to Bidders General Provisions Special Provisions Bid Proposal Contract Contract Bonds Plans The July 1992 Edition, Standard Specifications, State of California, Business and Transportation Agency, Department of Transportation All of the above documents, sometimes hereinafter referred to as the "Contract Documents," are intended to cooperate so that any work called for in one and not mentioned in the other is to be executed the same as if mentioned in all said documents. ARTICLE I - That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the City and under the condition expressed in the two bonds bearing even date with these presents and hereunto annexed, the Contractor agrees with the City, at Contractor's cost and expense, to do all the work and furnish all the materials except such as are mentioned in the specifications to be furnished by the City, necessary to construct and complete in a good workmanlike and substantial manner and to the satisfaction of the City the proposed improvements as shown and described in the Contract Documents which are hereby made a part of the Contract. ARTICLE II - The City hereby promises and agrees with the Contractor to employ, and does hereby employ, the Contractor to provide all materials and services not supplied by the City and to do the work according to the terms and conditions for the price herein, and hereby contracts to pay the same as set forth in Section 5.600, "Measurement, Acceptance and Payment," of the General Provisions, in the manner and upon the conditions above set forth; and the said parties for themselves, their heirs, executors, administrators, successors and assigns, do hereby agree to the full performance of the covenants herein contained. ARTICLE III - The Contractor agrees to conform to the provisions of Chapter 1, Part 7, Division 2 of the Labor Code. The Contractor and any Subcontractor will pay the general prevailing wage rate and other employer payments for health and welfare, pension, vacation, travel time, and subsistence pay, apprenticeship or other training programs. The responsibility for compliance with these Labor Code requirements is on the prime contractor. Contract.DOC I 07/25/12 ARTICLE IV - And the Contractor agrees to receive and accept the following prices as full compensation for furnishing all materials and for doing all the work contemplated and embraced in this agreement; also for all loss or damage arising out of the nature of the work aforesaid or from the action of the elements, or from any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution of the work until its acceptance by the City, and for all risks of every description connected with the work; also for all expenses incurred by or in consequence of the suspension or discontinuance of work and for well and faithfully completing the work, and the whole thereof, in the manner and according to the Plans and Contract Documents and the requirements of the Engineer under them, to -wit: Perform the work necessary to reconstruct the City Hall parking lot (50,360 square feet) with asphalt concrete, construct a trash enclosure, install handicap parking stalls, and other incidental and related work, all as shown on the plans and specifications for "City Hall Parking Lot Improvements". CONTRACT ITEMS ITEM 855 $ EST'D LF 76 $ NO. DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE 1. Clearing and Grubbing LS 1 $ 22,500.00 $22,500.00 2. Storm Water Pollution Control LS 1 $ 4,250.00 $ 4,250.00 3. Compact Original Ground SF 49,262 $ 0.20 $ 9,852.40 4. Concrete Curb LF 96 $ 25.50 $ 2,448.00 5. Concrete Parking Stall (ADA) SF 1,098 $ 6.25 $ 6,862.50 6. Concrete Driveway 7. Install 6 -Inch Storm Drain 8. Install 12 -Inch Storm Drain SF 855 $ 12.75 LF 76 $ 59.00 LF 18 $ 89.00 9. Install Drop Inlet Catch Basin EA 10. Install Storm Drain Clean Out EA 11. Adjust Manhole Frame and Cover to Grade EA 1 $ 1,775.00 1 $ 540.00 3 $ 610.00 $10,901.25 $ 4,484.00 $ 1,602.00 $ 1,775.00 $ 540.00 $ 1,830.00 Contract.DOC 2 07/25/12 ITEM EST'D. NO. DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE 12. Adjust Water Valve Frame and Cover to Grade EA 5 $ 275.00 $ 1,375.00 13, Furnish Water Valve Frame and Cover EA 14. Adjust Water/ Wastewater Service Box to Grade EA 15. Install Trash Enclosure LS 16. Tree Planting EA 17. Striping LS 18. Furnish and Install Sign Post EA 19. Furnish and Install ADA Signs LS 20. Furnish and Install Concrete 1 $ 1,195.00 Parking Bumper EA 21. Install ADA Ramp LS 22. Pavement Excavation CY 23. Asphalt Concrete TON * Denotes Final Pay Quantity 5 $ 195.00 $ 975.00 6 $ 275.00 $ 1,650.00 1 $ 13,100.00 $13,100.00 4 $ 600.00 $ 2,400.00 1 $ 1,195.00 $ 1,195.00 4 $ 200.00 $ 800.00 1 $ 215.00 $ 215.00 9 $ 55.00 $ 495.00 1 $ 2,110.00 $ 2,110.00 702" $ 15.00 $10,530.00 1,405 $ 97.50 $136,987.50 TOTAL $238,877.65 ARTICLE V - By my signature hereunder, as Contractor, I certify that I am aware of the provisions of Section 3700 of the Labor Code, which requires every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract. Contract. DO C 3 07/25/12 ARTICLE VI - It is further expressly agreed by and between the parties hereto that, should there be any conflict between the terms of this instrument and the Bid Proposal of the Contractor, then this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said proposal conflicting herewith. ARTICLE VII - The City is to furnish the necessary rights-of-way and easements and to establish lines and grades for the work as specified under the Special Provisions. All labor or materials not mentioned specifically as being done by the City will be supplied by the Contractor to accomplish the work as outlined in the specifications. ARTICLE VIII - The Contractor agrees to commence work pursuant to this contract within 15 calendar days after the City Manager has executed the contract and to diligently prosecute to completion within 25 WORKING DAYS. WHEN SIGNING THIS CONTRACT, THE CONTRACTOR AGREES THAT THE TIME OF COMPLETION FOR THIS CONTRACT IS REASONABLE AND THE CONTRACTOR AGREES TO PAY THE CITY LIQUIDATED DAMAGES AS SET FORTH IN SECTION 6-04.03 OF THE SPECIAL PROVISIONS. CONTRACTOR AGREES THAT THIS AMOUNT MAY BE DEDUCTED FROM THE AMOUNT DUE THE CONTRACTOR UNDER THE CONTRACT. IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands the year and date written below. CONTRACTOR: CITY OF LODI Title (CORPORATE SEAL) By: Konradt Bartlam City Manager Date: Attest City Clerk Approved As To Form D. Stephen Schwabauer City Attorney Contract. DOC 4 07/25/12 1. AA# 2. JV# �.�f - ,�'A ' 'i vO;i*" ra " ✓ fl uATI 1► J11 I T',R UEST °, .)q �._ � , TO Internal Services Det - Budget Division AMOUNT 3 FROM: Rebecca Areida-Yadav 15 DATE 07/25/2012 4 DEPARTMENT/DIVISION: Public Works 100,000.00 7t1U...._ DEEO Et .. D.1�E+.�`4�+5� , NG [�IO,JC1C�7.. .X#Il[Eb`,iF1THE (3U12.[RENT BUDGET Please provide a description of the project, the total cost of the project, as well as justification for the requested adjustment If you need more space, use an additional sheet and attach to this form Contract for City Hall Parking Lot Reconstruction Project with A M. Stephens Construction Company If Council has authorized the appropriation adjustment, complete the following: Meeting Date: Res No: Attach copy of resolution to this form. Department Head Signature FUND # BUS. UNIT # ACCOUNT # ACCOUNT TITLE AMOUNT A. 320 3205 Fund Balance $ 100,000.00 Deputy City Manager/Internal Services Manager Date SOURCE OF FINANCING B. 320 320123 7720 City Hall Parkin Lot $ 100,000.00 USE OF FINANCING 7t1U...._ DEEO Et .. D.1�E+.�`4�+5� , NG [�IO,JC1C�7.. .X#Il[Eb`,iF1THE (3U12.[RENT BUDGET Please provide a description of the project, the total cost of the project, as well as justification for the requested adjustment If you need more space, use an additional sheet and attach to this form Contract for City Hall Parking Lot Reconstruction Project with A M. Stephens Construction Company If Council has authorized the appropriation adjustment, complete the following: Meeting Date: Res No: Attach copy of resolution to this form. Department Head Signature Submit completed form to the Budget Division with any required documentation Final approval will be provided in electroniccopy format Deputy City Manager/Internal Services Manager Date Submit completed form to the Budget Division with any required documentation Final approval will be provided in electroniccopy format RESOLUTION NO. 2012-130 A RESOLUTION OF THE LODI CITY COUNCIL AWARDING CONTRACTAND AUTHORIZINGTHE CITY MANAGERTO EXECUTE CONTRACT FOR CITY HALL PARKING LOT RECONSTRUCTION PROJECTAND FURTHER APPROPRIATING FUNDS WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened on July 25, 2012, at 11:00 a.m., for the City Hall Parking Lot Reconstruction Project, described in the plans and specifications therefore approved by the City Council on June 20, 2012; and WHEREAS, said bids have been checked and tabulated and a report thereof filed with the City Manager as follows: Bidder Bid A. M. Stephens Construction $ 238,877.65 Vinciguerra Construction $ 318,476.00 George Reed, Inc. $ 337,994.00 WHEREAS, staff recommends awarding the contract for the City Hall Parking Lot Reconstruction Project to the low bidder, A. M. Stephens Construction Company, Inc., of Lodi, California, in the amount of $238,877.65. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby award the contract for the City Hall Parking Lot Reconstruction Project to the low bidder, A. M. Stephens Construction Company, Inc., of Lodi, California, in the amount of $238,877.65; and BE IT FURTHER RESOLVED that the City Manager is hereby authorized to execute the contract; and BE IT FURTHER RESOLVED that funds in the amount of $100,000 be appropriated from the Street Fund for this project. Dated: August 15, 2012 rrrrrrr: ice• :i : :-i : :7TTT • T: TTT: T: i i i i i i i i i i i � i � i � i �• �•1117iTTTTTTTTrrr��� hereby certify that Resolution No. 2012-130 was passed and adopted by the City Council of the City of Lodi in a regular meeting held August 15, 2012, by the following vote: AYES: COUNCIL MEMBERS — Hansen, Johnson, Katzakian, Nakanishi, and Mayor Mounce NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — None ABSTAIN: COUNCIL MEMBERS— None JOHL City Clerk 2012-130