HomeMy WebLinkAboutAgenda Report - August 15, 2012 C-04AGENDA ITEM CIO 4 CITY OF LODI ,. COUNCIL COMMUNICATION Im AGENDA TITLE: Accept Quarterly Report of Purchases between $10,000 and $20,000 MEETING DATE: August 15,2012 PREPARED BY: Deputy City Manager RECOMMENDEDACTION: Accept quarterly report of purchases between $10,000 and $20,000. BACKGROUND INFORMATION: During the second calendar quarter of 2012, the following purchases were awarded. Background informationfor each purchase is attached as ExhibitsA through H. Exh. Date Contractor Proiect Award Amt. A 4/3/12 ERMCO Transformers $18,764.66 B 4/3/12 ERMCO Transformers $16,311.20 C 4/10/12 Golden State Flow Measurement 8" F2 Compact Fireline MeterTRPL10CF $14,470.83 D 4/11/12 Foster Flow Control Secondary Effluent Bypass 24"Butterfy $13,475.63 Valve E 5/13/12 McFarland Cascade 35'& 45' Wood Poles $13,064.69 F 5/11/12 Duncan Press EUD Annual External Publications $14,412.62 G 6/5/12 Howard Industries Transformers $12,606.75 H 6/5/12 Howard Industries Transformers $12,995.73 FISCAL IMPACT: Varies by project. All purchases were budgeted in the 2011-2012 Financial Plan. FUNDING AVAILABLE: Funding as indicated on Exhibits. Jordan Ayers, Deputy Cit Manager Prepared by Sherry Moroz, Purchasing Technician JA/sm Attachment APPROVED: I Konradt Bartlam, City Manager EXHIBIT A RECOMMENDATION FOR CONTRACT AWARD PROJECT NAME: Electric Inventory/Transformer Purchase 1000kva 208/120v DEPARTMENT: Electric Utility CONTRACTOR ERMCO C/O Hees Enterprises AWARD AMOUNT: $18,764.66 DATE OF RECOMMENDATION: 04/03/2012 BIDS OR PROPOSALS RECEIVED: Ermco C/O Hees Enterprises Howard Industries ABB C/O Pacific Utilities HD Supply Utility "NO BID" or NO RESPONSE RECEIVED: CG Power Systems $18,764.66 $22,573.63 $18,920.90 $20,450.95 BACKGROUND INFORMATION& BASIS FORAWARD: This transformer will be used as a replacement if the transformer in the field fails. There is only one of these transformers in the electric system with this particular secondary voltage. Ifthis transformer fails it will take out part of the downtown. The lead time on this transformer is 10 weeks. Transformers must have the exact secondary voltage to keep the businesses power on. This transformer's secondary voltage is 208/120. Ermco C/O Hees Enterprises is the low responsible bidder and was awarded the Purchase Order. FUNDING: 160.1496 Prepared by: Randy Lipelt Title: B Reviewed by: Purchase Order No.: 21129 EXHIBIT B RECOMMENDATION FOR CONTRACT AWARD PROJECT NAME: Electric Inventory/Polemount Transformer Purchase DEPARTMENT: Electric Utility CONTRACTOR ERMCO C/O Hees Enterprises AWARD AMOUNT: 16,311.20 DATE OF RECOMMENDATION: 04/03/2012 BIDS OR PROPOSALS RECEIVED: ERMCO C/OHees $16,311.20 Howard Industries $18,420.94 ABB C/O Pacific Utilities $19,082.53 HD Supply Utility $18.369.23 "NO BID" cr NO RESPONSE RECEIVED: CG Power Systems BACKGROUND INFORMATION & BASIS FORAWARD: These transformers will be used in new construction and for replacement of failed transformers in the field. The lead time for these transformers in 10 weeks. The electric utility must maintain a minimum quantity of each size and voltage for replacement of failed transformers. Ermco C/O is the low responsible bidder and was awarded the Purchase Order. FUNDING: 160.1496 Prepared by: Randy Lipelt Title: Buyer Reviewed by: r Purchase Order Nb.: 21130 EXHIBIT C RECOMMENDATION FOR CONTRACTAWARD PROJECT NAME: DEPARTMENT: CONTRACTOR AWARD AMOUNT DATE OF RECOMMENDATION: 8!'F2 Compact Firellne MeterTRPL 100 CF Public Works Golden State Flow Measurement Inc $14,470.83 4110112 BIDS OR PROPOSALS RECEIVED: Golden State Flow Measurement Inc "NO BID" or NO RESPONSE RECEIVED: $14,470.83 BACKGROUND INFORMATION& BASIS FORAWARD: The WaterMastewater Division needs to purchase an eight inch F2 Compact Fireline Meterfor the Casa De Lodi meter installation project. The property owner will be paying the City of Lodi for the cost of the meter. FUNDING: Purchase Order No. 21133 181402.1831.2100 Prepared by: Richard Lenfestey Title: WaterA/Vassteewwater Supervisor Reviewed by: EXHIBIT D RECOMMENDATION FOR CONTRACT AWARD PROJECT NAME: Secondary Effluent Bypass 24" PrattlMilliken ButterflyValve DEPARTMENT: Public Works CONTRACTOR Foster Flow Control AWARD AMOUNT $13,475.63 DATE OF RECOMMENDATION: 4/11/12 BIDS OR PROPOSALS RECEIVED: Foster Flow Control Allied Packing Frank Olsen (vendor did not spec like equipment) "NO BID" cr NO RESPONSE RECEIVED: $13,475.63 $13,676.25 $11,373.42 BACKGROUND INFORMATION& BASIS FOR AWARD: The valve will enable the secondary effluent to bypass the filters and UV system into the ponds, saving wear and tear on equipment and a savings in electrical usage. FUNDING: 170403.7331 Prepared by. Kelly Powers Title: WaterMastewater Supervisor Reviewed by: Purchase Order No. EXHIBIT E RECOMMENDATION FOR CONTRACTAWARD PROJECT NAME: DEPARTMENT CONTRACTOR AWARD AMOUNT: DATE OF RECOMMENDATION: 35'& 45' Wood Poles Electric Utllity McFarland Cascade $13,064.69 05/13/12 BIDS OR PROPOSALS RECEIVED: McFarland Cascade The Oeser Company Bell Lumber& Pole Company Nevada Wood Preserving Stella -Jones Bridgewell Resources "NO BID" or NO RESPONSE RECEIVED: $13,064.69 $15,004.19 $16,410.33 $13,118.56 $13,129.34 $13,802.78 BACKGROUND INFORMATION & BASIS FORAWARD: These poles are for the Electric Utility Inventory. They will be used in new construction and in replacement of failed wood poles in the Electric System. McFarland cascade is the low responsible bidder and was awarded the Purchase Order. FUNDING: 160.1486 Prepared by: Randy Lipelt Title: Buyer Reviewed by. Purchase Order 1h.: 21166 RECOMMENDATION FOR CONTRACT AWARD PROJECT NAME: DEPARTMENT: CONTRACTOR AWARD AMOUNT: DATE OF RECOMMENDATION: EXHIBIT F EUD Annual External Publications Project Electric Utility Duncan Press $14,412.62 May 11, 2012 BIDS OR PROPOSALS RECEIVED: Duncan Press $14,412.62 "NO BID" cr NO RESPONSE RECEIVED: On -Line Printing and Graphics The Coloring Book Graphics West Printing BACKGROUND INFORMATION & BASIS FOR AWARD: Duncan Press has performed newsletter and utility bill insert preparation, as well as other -ser -did documents, for the past ten years. They are extremely familiar with the projects provided tx ek to them by Lodi Electric Utility and have proven time and again to produce high-quality external publications (newsletters, bill inserts, envelopes, rebate applications, etc.) In addition, of the four firms contacted for a quote, Duncan Press was the only firm to respond. FUNDING: Prepared by: Rob Lechner Title: CustomerService & Programs Mgr. Reviewed by:� Purchase Order No. EXHIBIT G RECOMMENDATION FOR CONTRACT AWARD PROJECT NAME: 600KVA 480/277v Three Phase Transformer DEPARTMENT: Electric Utility CONTRACTOR Howard Industries AWARD AMOUNT: $12,606.75 DATE OF RECOMMENDATION: 06/05/12 BIDS OR PROPOSALS RECEIVED: Howard Industries Amorphous Core HD Supply Portland CG Power Systems Howard Industries Silicon Core "NO BID" or NO RESPONSE RECEIVED: Actual Cost Lifecycle Cost $12,606.75 $18,171.75 $13,716.58 $21,285.33 $11,239.40 $19,320.65 $11,165.06 $19,340.06 BACKGROUND INFORMATION & BASIS FOR AWARD: This transformer is for the Electric Utility Inventory. It can be used in new construction or in replacement of a failed transformer in the Electric System. Howard Industries (Amorphous Core) has the lowest lifecycle cost. Howard Industries is the low responsible bidder and was awarded the Purchase Order. FUNDING: 160.1496 Prepared by: Randy Lipelt Title: Buyer Reviewed by: 40� Purchase Order No.: 21194 EXHIBIT H RECOMMENDATION FOR CONTRACT AWARD PROJECT NAME: DEPARTMENT: CONTRACTOR AWARD AMOUNT: DATE OF RECOMMENDATION: 240/120 Single Phase Transformers Electric Utility Howard Industries $12,995.73 June 5,2012 BIDS OR PROPOSALS RECEIVED: 10CWA Howard Industries Silicon Core HD Supply Portland Howard IndustriesAmorphous Core 167KVA Howard Industries Silicon Core HD Supply Portland "NO BID" or NO RESPONSE RECEIVED: ICCKVA CG Power Systems 167KVA CG Power Systems Howard Industries Amorphous Core Actual Cost $8,889.38 $9,891.45 $10,279.35 $4,106.35 $4,216.26 Lifecycle Cost $14,079.38 $15,190.20 $14,205.60 $6,907.60 $7,078,76 BACKGROUND INFORMATION& BASIS FORAWARD: These transformers are for the Electric Utility Inventory. They can be used in new construction or in replacement of a failed transformers in the Electric System. Howard Industries is the low responsible bidder and was awarded the Purchase Order FUNDING: 160.1496 Prepared by: Randy Lipelt Title: Buyer Reviewed by: 49k2zsi�d/ Purchase Order No. 21195