HomeMy WebLinkAboutAgenda Report - June 20, 2012 C-17AGENDA ITEM Cw
I
CITY OF LODI
COUNCIL COMMUNICATION
AGENDA TITLE: Adopt Resolution Authorizing City Managerto Execute Contract and to Execute
Contract Extensions with West Coast Arborist, of Anaheim, for Tree Maintenance
for Fiscal Year 2012/13 ($72,900)
MEETING DATE: June 20,2012
PREPARED BY: PublicWorks Director
RECOMMENDED ACTION: Adopt resolution authorizing City Manager to execute contract and
to execute contract extensions with West Coast Arborist, of
Anaheim, for tree maintenance for Fiscal Year 2012/13, in the
amount of $72,900.
BACKGROUND INFORMATION: This project provides for the structural pruning, maintenance
trimming, emergency calls, and removal of City trees at various
locations throughout the City for Fiscal Year 2012/13. The project
includes the removal of 40 Modesto Ash trees and tree spraying. An objective of this contract is to
improve the health of our urban forest and reduce liability exposure associated with falling limbs.
In addition to the aforementioned work, the contract will secure pricing for other miscellaneous tree work,
including maintenance pruning (structural and clearance) and crown reductions, tree planting, tree
removals, stump grinding, tree pest control, and emergency call outs. Recently, much of the annual tree
trimming budget was spent on tree pruning, tree removals, and emergency responses due to storm -
related damage. The contract provides for individual tree pruning, which is more effective than grid
pruning, as practiced in the past. The contract will be for one year with two one-year extensions, if
mutually agreeable. Staff recommendsthat the City Manager be authorized to negotiate and execute the
contract extensions.
Specificationsfor this projectwere approved on April 18, 2012. The City receivedthe following three bids
for this project on May 23, 2012. The project estimate for the work included in the bid was $135,000.
Bidder Location Bid
West Coast Arborist Anaheim, CA $72,900.00
Berndt Tree Services Lodi, CA $111,500.00
A -Plus Tree Service Vallejo, CA $131,412.50
* Please note, the bid from A -Plus Tree Service contained a mathematical error; the amount recorded at
the bid opening was $133,407.50.
Plans and specifications approved for the project included the removal of 39 Raywood Ash trees from
Lower Sacramento Road. The replacement planting is just beginning and, therefore, removal of these
APPROVED:
K;\WP\COUNCIL\2012WwardTreeMaintenance.doc KonradtBartlam, City Manager
6/4/2012
Adopt Resolution Authorizing City Manager to Execute Contract and to Execute Contract Extensions with
West Coast Arborist, of Anaheim, for Tree Maintenance for Fiscal Year 2012/13 ($72,900)
June 20,2012
Page 2
39 trees will be delayed for at least one year after the replacement planting has been completed. The
project estimate for this work is $20,000.
Plans and specifications approved for the project included mistletoe pruning along Church Street
between Lodi Avenue and Kettleman Lane. This work was removed from the project in order to clarify
the requirements of the work. Because the best time for mistletoe pruning is when the trees have few
leaves, this work will be separately bid and scheduled for late fall. The project estimate for this work is
$45,000.
FISCAL IMPACT: Regulartree maintenance improves the health of the City's urban forest
and reduces exposure to liability.
FUNDING AVAILABLE: Streets and Drainage (3215036).
Jordan AVers
Deputy City Manager/Internal Services Director
Gu.cdv.�
F. Wally 04ndelin
PublicWorks Director
Prepared by Kathryn E. Garcia, Compliance Engineer
FWS/KMG/pmf
cc: Deputy PublicWorks Director- Utilities
Compliance Engineer
K:\WP\COUNCIL\2012WwardTreeMaintenance.doc 6/4/2012
TREE MAINTENANCE 2012-2013
CONTRACT PAGE1
THIS CONTRACT, made by and between the CITY OF LODI, State of California, herein
referred to as "City" and WEST COAST ARBORIST herein called "Contractor."
WITNESSETH:
That the parties hereto have mutually covenanted and agreed, and by these presents do
covenant and agree with each other, as follows:
The complete contract consists of the following documents, which are filed in the Public
Works Department, which are incorporated herein by this reference, to -wit:
Notice Inviting Bids
Information to Bidders
General Provisions
Special Provisions
Bid Proposal
Contract
Contract Bond
The July 1992 Edition Standard
Specifications, State of California
Business and Transportation Agency,
Department of Transportation
All of the above documents, sometimes hereinafter referred to as the "Contract Documents,"
are intended to cooperate so that any work called for in one and not mentioned in the other
is to be executed the same as if mentioned in all said documents.
ARTICLE I That for and in consideration of the payments and agreements hereinafter
mentioned to be made and performed by the City and under the condition expressed in the
bond bearing even date with these presents and hereunto annexed, the Contractor agrees
with the City, at Contractor's cost and expense, to do all the work and furnish all the
materials except such as are mentioned in the specifications to be furnished by the City,
necessary to perform and complete in a good workmanlike and substantial manner and to
the satisfaction of the City as shown and described in the Contract Documents which are
hereby made a part of the Contract.
ARTICLE II The City hereby promises and agrees with the Contractor to employ, and
does hereby employ, the Contractor to provide all services not supplied by the City and to
do the work according to the terms and conditions for the price herein, and hereby contracts
to pay the same as set forth in Section 5-100, of the General Stipulations, in the manner and
upon the conditions above set forth; and the said parties for themselves, their heirs,
executors, administrators, successors and assigns, do hereby agree to the full performance
of the covenants herein contained.
ARTICLE III The Contractor agrees to conform to the provisions of Chapter 1, Part 7,
Division 2 of the Labor Code. The Contractor and any Subcontractor will pay the general
prevailing wage rate and other employer payments for health and welfare, pension,
vacation, travel time, and subsistence pay, apprenticeship or other training programs. The
responsibility for compliance with these Labor Code requirements is on the prime contractor-.
R:\GROUP\STREETS\TREES\CONTRACTS\2012\Tree Maintainance2012-13\Tree Maintenance Contract2012-13.doc3.1 05/29/2012
TREE MAINTENANCE 2012-2013
CONTRACT PAGE2
ARTICLE IV And the Contractor agrees to receive and accept the following prices as full
compensation for furnishing the work contemplated and embraced in this agreement; also
for all loss or damage arising out of the nature of the work aforesaid or from the action of the
elements, or from any unforeseen difficulties or obstructions which may arise or be
encountered in the prosecution of the work until it's acceptance by the City, and for all risks
of every description connected with the work; also for all expenses incurred by or in
consequence of the suspension or discontinuance of work; and for well and faithfully
completing the work, and the whole thereof, in the manner and according to the Contract
Documents and the requirements of the Engineer under them, to -wit:
Perform the work necessary to complete any or all of the bid items such as structural
pruning, crown raising and/or crown reduction, mistletoe removal, cleaning and light
thinning, and palm tree pruning as specified in the bid summary. All work shall be
completed in accordance with the standards set forth by the International Society of
Arboriculture Pruning Standards (Best Management Practices) and the ANSI A300
Standards. Special projects that are difficult to access require the need for specialty
equipment (i.e., crane), service request pruning, or pruning to reduce and/or pruning to
restore would fall under Crew Rental.
TREE MAINTENANCE 2012-2013
BID SUMMARY
BID ITEM 1. FULL PRUNE BASED ON SERVICE OR SPECIAL REQUESTS
Trees requiring service to rectify a specific problem, such as blocked street lighting or signs,
right-of-way clearance for utility lines, or broken limbs, will be performed as a "Service
Request."
DESCRIPTION
UNIT
DESCRIPTION
UNIT COST
EST. QTY
Small, Medium& Lar a trees
TOTAL COST
3,900.00
Up to 6" DBH
PerTree
$
35.00
5
$
175.00
6" -12" DBH
Per Tree
$
75.00
5
$
375.00
1 3 - 18" DBH
PerTree
$
200.00
5
$
1.000.00
19" - 24" DBH
Per Tree
$
150.00
5
$
750.00
25" - 30"" DBH
PerTree
$
250.00
5
$
1,250.00
31" DBH& Over
PerTree 1
$
350.00
5
$
1,750.00
Sub -total
Bid Item 1
$
5,300.00
BID ITEM 2. CLEARANCE PRUNE
Trees will be raised to a standard height established by the City for the purpose of creating
adequate room for utility vehicles, paving equipment, pedestrian traffic, clearance for
buildings and signs in accordance with standards set forth by the International Society of
Arboriculture Pruning Standards (Best Management Practices) and the ANSI A300
Standards under "Pruning to Raise." Clearance prunes are performed on a street -by -street
basis.
DESCRIPTION
UNIT: UNIT COST EST. QTY
TOTAL COST
Small, Medium& Lar a trees
Per tree $ 39.00 I 100 $
3,900.00
Sub -total Bid Item 2 $
3,900.00
TREE MAINTENANCE 2012-2013
CONTRACT
BID ITEM 3. PALM TREE TRIMMING
PAGE 3
Standard trimming of Palms shall consist of the removal of all dead and live fronds as well
as fruit. The remaining healthy fronds will be situated at an upward thirty degree (30°) angle
in relation to a horizontal plane at the head of the palm tree. Work shall be in accordance
with standards set forth by the International Society of Arboriculture Pruning Standards
(Best Management Practices) and the ANSI A300 Standards
DESCRIPTION UNIT UNIT COST EST. QTY
TOTAL COST
Trim Date Palm trees Per tree $ 59.00 50 $
2,950.00
Trim Fan Palm trees Per tree 1 $ 59.00 50 $
2,950.00
Sub -total Bid Item 3 $
5,900.00
BID ITEM 4. TREE & STUMP REMOVAL
City prepares list of trees to be removed, marks trees, notifies homeowners and submits lists
to Contractor. Contractor calls U.S.A. and prepares internal work order. Crew removes tree
and hauls all debris. Crew grinds stumps to a depth of 18 inches. All holes will be backfilled
with clean top soil; as well as having all debris cleaned up and hauled away.
D:ES.CRIP`fI..QN > . UNIT :'.. UNIT COST ;EST.'QTY.; :TOTAL COST.
Tree Removal and Stump Grinding
100.00
5
$ 500.00
up to 6" DBH Per Tree
$
Tree Removai and Stump Grinding PerTree
$ 500.00
5
$ 2,500.00
6" - 12" DBH
Tree Removal and Stump Grinding
5
$ 2,500.00
13"- 18" DBH Per Tree
$ 500.00
Tree Removal and Stump Grinding
15
$ 7,500.00
19" - 24" DBH Per Tree
$ 500.00
Tree Removal and Stump Grinding
30
$ 15,000.00
25" - 30"" OBH Per Tree
$ 500.00
Tree Removal and Stump Grinding
10
$ 5,000.00
31" DBH & Over Per Tree
$ 500.00
Stump Grinding up to 6" DBH PerTree
$ 50.00
5
$ 250.00
Stump Grinding 6" - 12" DBH PerTree
$ 200.00
5
$ 1,000.00
Stump Grinding 1 3 -18" DBH PerTree
$ 200.00
5
$ 1,000.00
,Stump Grinding 19" - 24" DBH PerTree
$ 300.00
5
$ 1,500.00
Stump Grinding 25" - 30"" DBH PerTree
$ 300.00
5
$ 1,500.00
Stump Grinding 31" DBH & Over
PerTree
$ 300.00
5 $ 1,500.00
Sub -total Bid Item 4 $ 39 750.00
R:\GROUP\STREETS\TREES\CONTRACTS\2012\Tree Maintainance 2012AMTree Maintenance Contract 2012-13.doc3.3 05/29/2012
TREE MAINTENANCE 2012-2013
CONTRACT
BID ITEM 5. CREW RENTAL
PAGE 4
The standard crew is three (3) men, one chipper truck, one chipper, one aerial tower, and all
necessary hand tools. The crew and equipment can be modified to complete any type of
miscellaneous tasks including special projects that may consist of extraordinary work such
as hanging flags, changing light bulbs, or pruning specific trees requiring immediate
attention prior to their scheduled prune.
DESCRIPTION UNIT UNIT COST EST. QTY TOTAL COST
Crew Rental Per hour $ 150.00 50 $ 7500.00
Sub -total Bid Item 5 $ 7,500.00
BID ITEM 6. EMERGENCY RESPONSE
Contractor shall respond to emergency calls on a 24-hour basis. Emergencywork will begin
on-site within two (2) hours from the time of notification from the City. The crew will do what
is necessary to render the hazardous tree or tree -related condition safe.
DESCRIPTION UNIT UNIT COST EST. QTY I TOTAL COST
Emergency Response Per hour 1 $ 180.00 50 1 $ 9,000.00
Sub -total Bid Item 6 $ 9,000.00
BID ITEM 7. TREE PEST CONTROL
Contractor shall provide, as requested, pest control services for the control of aphids and
elm leaf beetle. Insects shall be controlled by the use of approved insecticides under
direction of a State of California licensed Pesticide Applicator.
DESCRIPTION UNIT UNIT COST EST. QTY
TOTAL COST
Up to 30" DBH Per Tree $ 45.00 20 $
900.00
31" DBH & Over Per Tree $ 65.00 10 $
650.00
Sub -total Bid Item 7 $
1.550.00
- -
- - -
- - -Mppp
7100
- - - -
R:\GROUP\STREETS\TREES\CONTRACTS\2012\Tree Maintainance 2012-13\Tree Maintenance Contract 2012-13.doc3.4 05/29/2012
TREE MAINTENANCE 2012-2013
CONTRACT
PAGE 5
BID ITEM9. ARBORIST SERVICES*
Not included in Bid Tabulation, but must be completed to be considered a responsive bid.
TOTAL BID ITEM SUMMARY
TOTAL OF BID ITEM 1.
SPECIAL REQUESTS
FULL PRUNE BASED ON SERVICE OR
$
5,300.00
TOTAL OF BID ITEM 2.
CLEARANCE PRUNE
$
3,900.00
TOTAL OF BID ITEM 3.
PALM TREE TRIMMING
$
5,900.00
TOTAL OF BID ITEM 4.
TREE & STUMP REMOVAL
$
39,750.00
TOTAL OF BID ITEM 5.
CREW RENTAL
Is
7,500.00
TOTAL OF BID ITEM 6. EMERGENCY RESPONSE 1$ 9,000.00
TOTAL OF BID ITEM 7. TREE PEST CONTROL $ 1,550.00
TOTAL OFBIDITEM 8. CHURCH STREET TREE MAIN-TEPb4N $
TOTAL BI $ 72,900.00
Bid Items 1 throu h 8)
BID ITEM 9. ARBORIST SERVICES*
(Per hour) 1 $ 95.00
* Not included in Bid Tabulation, but must be completed to be considereda responsive bid.
References must be submitted with bid proposal as described in Section 2.1400
R:\GROUP\STREETS\TREES\CONTRACTS\2012\Tree Maintainance 2012-13\Tree Maintenance Contract 2012-13.doc3.5 05/29/2012
TREE MAINTENANCE 2012-2013
CONTRACT PAGE6
ARTICLE V By my signature hereunder, as Contractor, I certify that I am aware of the
provisions cf Section 3700 of the Labor Code, which requires every employer to be insured
against liability for Workers' Compensation or to undertake self-insurance in accordance
with the provisions of that code, and I will comply with such provisions before commencing
the performance of the work of this contract.
ARTICLE VI It is further expressly agreed by and between the parties hereto that, should
there be any conflict between the terms of this instrument and the Bid Proposal of the
Contractor, then this instrument shall control and nothing herein shall be considered as an
acceptance of the said terms of said proposal conflicting herewith.
ARTICLE VII The City is to furnish the necessary rights-of-way and easements and to
establish lines and grades for the work as specified under the Special Provisions. All labor
or materials not mentioned specifically as being done by the City will be supplied by the
Contractor to accomplish the work as outlined in the specifications.
ARTICLE VIII The Contractor agrees to commence work pursuant to this contract within 15
calendar days after the City Manager has executed the contract and to diligently prosecute
to completion within the allotted number of working days.
R:\GROUP\STREETS\TREES\CONTRACTS\2012\Tree Maintainance2012-13\Tree Maintenance Contract 2012-13.doc3.6 05/29/2012
TREE MAINTENANCE 2012-2013
CONTRACT
PAGE 7
WHEN SIGNING THIS CONTRACT, THE CONTRACTOR AGREES THAT THE TIME OF
COMPLETION FOR THIS CONTRACT IS REASONABLE AND THE CONTRACTOR
AGREES TO PAY THE CITY LIQUIDATED DAMAGES AS SET FORTH IN SECTION 6-
04.03 OF THE SPECIAL PROVISIONS. CONTRACTOR AGREES THAT THIS AMOUNT
MAY BE DEDUCTED FROM THE AMOUNT DUE THE CONTRACTOR UNDER THE
CONTRACT.
IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands the
year and date first written below.
CONTRACTOR
Authorized Signature
Title
TYPE OF ORGANIZATION
Individual, Partnership or Corporation
Address
CITY OF LODI
a Municipal corporation
Konradt Bartlam
City Manager
Attest:
Randi Johl, City Clerk
Approved as to Form:
D. Stephen Schwabauer'
City Attorney
Dated:
(Affix corporate seal if Corporation)
Telephone
R:\GRCUP\STREETSITREESICCNTRACTS\2012\Tree Maintainance2012-13\Tree Maintenance Contract2012-13.doc3.7 05/29/2012
RESOLUTION NO. 2012-101
A RESOLUTION OF THE LODI CITY COUNCIL
AWARDING CONTRACT AND AUTHORIZING THE
CITY MANAGER TO EXECUTE CONTRACT FOR TREE
MAINTENANCE FOR FISCAL YEAR 2012/13
WHEREAS, in answer to notice duly published in accordance with law and the order of
this City Council, sealed bids were received and publicly opened on May 23, 2012, at
11:00 a.m., for tree maintenance for fiscal year 2012/13, described in the specifications
therefore approved by the City Council on April 18, 2012; and
WHEREAS, said bids have been checked and tabulated and a report thereof filed with
the City Manager as follows:
Bidder Bid
West Coast Arborist $72,900.00
Berndt Tree Services $111,500.00
A -Plus Tree Service $131,412.50*
*Corrected total
WHEREAS, staff recommends awarding the contract for tree maintenance for fiscal year
2012/13 to the low bidder, West Coast Arborist, of Anaheim, California, in the amount of
$72,900; and
WHEREAS, the contract provides for two one-year extensions, if mutually agreeable.
NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby award
the contract for tree maintenance for fiscal year 2012/13 to the low bidder, West Coast Arborist,
of Anaheim, California, in the amount of $72,900; and
BE IT FURTHER RESOLVED that the City Manager is hereby authorized to execute the
contract; and
BE IT FURTHER RESOLVED that the City Council does hereby authorize the
City Manager to negotiate and execute up to two one-year extensions.
Dated: June 20, 2012
I hereby certify that Resolution No. 2012-101 was passed and adopted by the City
Council of the City of Lodi in a regular meeting held June 20, 2012, by the following vote:
AYES: COUNCIL MEMBERS — Hansen, Johnson, Katzakian, and Mayor Mounce
NOES: COUNCIL MEMBERS— None
ABSENT: COUNCIL MEMBERS— Nakanishi
ABSTAIN: COUNCIL MEMBERS — None
JOHL
City Clerk
2012-101