HomeMy WebLinkAboutAgenda Report - June 20, 2012 C-14AGENDA ITEM & 14
CITY OF LODI
COUNCIL COMMUNICATION
AGENDA TITLE: Adopt Resolution Authorizing City Manager to Execute One -Year Extension of
Contract with Holt of California, of West Sacramento, for Standby Generator
Maintenance and Repair ($38,316)
MEETING DATE: June 20,2012
PREPARED BY: PublicWorks Director
RECOMMENDED ACTION: Adopt resolution authorizing City Managerto execute one-year
extension of contract with Holt of California, of West Sacramento, for
standby generator maintenance and repair, in the amount of $38,316.
BACKGROUND INFORMATION: The City owns and operates 24 emergency standby generator sets
that range in size from 6 kW to 2 mW. The generators are located
at facilities where continued operation during extended power
outages is necessary to maintain public health and/or safety. Examples of these facilities include fire
stations, water wells, sanitary lift stations and the police station. The contractfor preventive maintenance
and repairfor 22 emergency generator sets was executed in the amount of $35,710. A change order in
the amount of $2,606 was executed which added preventative maintenance for two additional generators
(Hutchins Street Square and Library) that were inadvertently left out of the original contract.
Over the past several years, staff has not been able to keep up with the preventative maintenance
requirementsfor its emergency generator sets. The lack of preventative maintenance could result in
serious and more -costly repairs, unreliable operation, and greater downtime. In order to maximize
reliability and useful life of the generator sets while minimizing downtime, staff recommends contracting
the preventive maintenance and repair work to an outside vendor.
City Council awarded the contract for preventive maintenance and repairto Holt of California on May 4,
2011. Project specifications contain a provision to extend the contract, and Holt of California has agreed to
continue to provide the same level of service at no increase in cost to the City. This will be the first of two
possible extensions. Due to the high quality of service provided by Holt of California, staff recommends
extending the contract for the upcoming fiscal year.
FISCAL IMPACT: Preventative maintenance reduces the frequency of costly repairs and
increases reliability of emergency standby generators serving critical
facilities.
FUNDING AVAILABLE: Water, Wastewater, Facilities, and Hutchins Street Square funds (180451,
170404. 10351 1 .347115).
JorM'Ayers
Deputy City Ma
Preparedby Kathryn E. Garcia, Compliance Engineer
FWS/KMG/pmf
cc: Deputy Public Works Director— Utilities
Compliance Engineer
APPROVED:
ces Director
F. Wallycgandelin
PublicWorks Director
K:\WP\COUNCIL\2012\ContractExtensionStandbyGenerators.doc Konradt Bartlam, City Manager
5/31/2012
CONTRACT EXTENSION AGREEMENT
2011/2012 STANDBY GENERATOR MAINTENANCE AND REPAIR CONTRACT
THIS CONTRACT EXTENSION AGREEMENT, made and entered this day of
June, 2012, by and between the CITY OF LODI, a municipal corporation, hereinafter called
"Owner", and HOLT OF CALIFORNIA, hereinafter called "Contractor."
WITNESSETH:
WHEREAS; Contractor and Owner entered into the Standby Generator Maintenance
and Repair, 2011/2012 Contract on July 13, 2011.
L. WHEREAS; both parties desire to extend the contract in accordance with Section 5.01
Item E, Option to Renew of the Special Provisions.
3. WHEREAS; the contract incorporates additional work set forth in Contract Change
Order No. 1. WHEREAS; the contract shall not exceed the new contract price of
$38,316.00 for the duration of this extension.
TERM AND TERMS: The term of this Contract Extension Agreement shall be for a
period of one (1) year, commencing July 1, 2012 and terminating June 30, 2013. All
other terms and conditions will remain as set forth as reflected in the Standby Generator
Maintenance and Repair, 2011/2012 Contract, attached hereto as Exhibit A, Contract
Change Order No. 1, attached hereto as Exhibit B, and made a part hereof as though
fully set forth herein.
5. INSURANCE: Contractor shall provide insurance as set forth in the attached Exhibit C,
Insurance Requirementsfor Contractor.
IN WITNESS WHEREOF, Owner and Contractor have executed this Contract Extension
Agreement on ,2012.
CITY OF LODI, a municipal corporation HOLT OF CALIFORNIA.
hereinabove called "Owner" hereinabove called "Contractor"
KON RADT BARTLAM
City Manager By:
Attest:
Title:
RANDI JOHL, City Clerk
Approved as to Form:
(Print Name)
D. STEPHEN SCHWABAUER, CityAttorne
CADocuments and Settings\pfarris\Local Settings\Temporary InternetContent.0utlook\N9Q6MHP0\Contract Extension (GeneratorMaint
2012-13).doc 5/24/2012
ExhibitA
CITY OF LODI CONTRACT
STANDBY GENERATOR MAINTENANCE AND REPAIR
CITY OF LODI, CALIFORNIA
THIS CONTRACT made by and between the CITY OF LODI, State of California, herein
referred to as the "City," and HOLT OF CALIFORNIA, herein referred to as the "Contractor."
WITNESSETH:
That the parties hereto have mutually covenanted and agreed, and by these presents do covenant
and agree with each other, as follows:
The complete Contract consists of the following documents, on file in the Public Works
Department, which are incorporated herein by this reference, to -wit:
Request for Bid
Specifications and Attachment Documents
Pricing Proposal (Contractor Provided Schedule of Values)
Special Provisions
Contract
Contract Bonds
Addenda
All of the above documents, sometimes hereinafter referred to as the "Contract Documents," are
intended to cooperate so that any work called for in one and not mentioned iia the other is to be
executed the same as if mentioned in all said documents.
ARTICLE I - That for and in consideration of the payments and agreements hereinafter
mentioned, to be made and performed by the City and under the condition expressed in the two
bonds bearing even date with these presents and hereunto annexed, the Contractor agrees with
the Com, at Contractor's cost and expense, to do all the work, furnish all labor and furnish all the
materials except such as are mentioned in the specifications to be furnished by the City,
necessary to maintain in a good workmanlike and substantial manner to the satisfaction of the
City the proposed maintenance and repair of standby generators,
ARTICLE II - The City hereby promises and agrees with the Contractor to employ, and does
hereby employ, the Contractor to provide all materials and services not supplied by the City and
to do the work according to the terms and conditions for the price herein, and hereby contracts to
pay the same as set forth in Section 5, Special Provisions, in the manner and upon the conditions
above set forth; and the said parties far themselves, their heirs, executors, administrators,
successors and assigns, do hereby agree to the full performance of the covenants herein
contained.
ARTICLE III - And the Contractor agrees to receive and accept the following prices as full
compensation for furnishing all materials and for doing all the work contemplated and embraced
in this agreement; also for all loss or damage arising out of the nature of the work aforesaid or
CITY OFLODI
STANDBY GENERATOR MAINTENANCE AND REPAIR CONTRACT
from the action of the elements, or from any unforeseen difficulties or obstructions which may
arise or be encountered in the prosecution of the work until its acceptance by the C dy,and for all
risks of every description connected with the work; also for all expenses incurred by or in
consequence of the suspension or discontinuance of work and for well and faithfully completing
the work, and the whole thereof, in the manner and according to the Plans and Contract
Documents and the requirements of the Engineer under them, to -wit:
Perform the work necessary to maintain 22 standby generators and other incidental and related
work in accordance with these specifications, An additional bid item for standby generator
repair is a separate bid, This item may be awarded for the full year, a partial year or not at all.
The standby generators to be maintained are shown in the Appendix of the Specifications for
Generator Maintenance and Repair 2011/2012.
Stand-by Generator Maintenance Service
Project includes a total of two (2) Level 1 inspections per year at ISO -day intervals, plus one (1)
annual Level 2 inspection as described below.
A: PREVENTIVE MAINTENANCE
Inspect each stand-by generator and perform necessary Level 1 preventive maintenance as
described in Section 6 Generator Inspection procedures. The contract item Unit Price A is for
one inspection, based on two (2) inspectionsper year at ISO -day intervals.
B: PREVENTIVE MAINTENANCE
Inspect each standby generator and perform Level 2 preventive maintenance and inspection as
described in Section 6, Generator Inspection Procedures. The contract item Unit Price B is for
one inspection per year, with a Level 2 inspection at start of contract and additional Level 2
inspections as requested, but no less than once (1) per year.
C: REPAIR
As needed, perform necessary repair
Maintenance Contract
Generator Specifications
Unit Price A,
Unit Price B,
Items
Preventative
Annual
Maintenance
(Level 2)
(Level 1)
Inspection,
Inspection,
Price Per
Price Per
Inspection
Inspection
LOCATION
YEAR
MAKE
MODEL
FUEL
KW
Facilities (Emergency
1988
CAT
580E
DSL
300
$440.00
$1,132.00
Senerator)_
Firehouse#2
1981
ONAN
DSL
6
$330.00
$615.00
?inhouse #3
1975
WISCONSIN
PROPA
7.5
$330.00
$615.00
KOHLER
NLS
Facilities (Emergency
1997
CAT
CD020
DSL
20
$330.00
$615.00
3enerator)
OLYMPIAN
CITY OF LODI
STANDBY GENERATOR MAINTENANCE AND REPAIR CONTRACT
I Mnintenanee Cantrnet I Gimerntnr Sneritientinne I iTnit Price A. I Unit Price R
Annual
Maintenance (Level 2)
(Level l) inspection,
Inspection, Price Per
Price Per Inspection
Inspection
LOCATION
YEAR
MAKE Mtn
FUEL
KW
Henning Substation
2009
CAT D80-6
DSL
80
$330.00
$615.00
OLYMPIAN
Facilities
2003 SM1I
20
$330.00
$615.00
CUMMMS
Well 411
1996 J PAT
19% CAT
SN4
DSL
500
$440.00
$1,432.00
Well
SR413
DSL
230
$390.00
$1,032.00
Well?
1995
CAT
SR413
DSL
300
$440.00
$1,132.00
Well
STAT
S4R8 DSL
250
$390.00
$1,032.00
Well 13
00
Gm
i DSL
SR4B DSL
SR413 DSL
100
$330.00
$615.00
Well 16
.1995
CAT
300
$440.00
$1,132.00
Well 21
!00_
CAT
230
$390.00
$1,032.00
Well 22
!005
OLYMPIAN
D150P6
DSL
150
$390.00
$932.00
White Slough
1005
CAT
SR414V
DSL
2000
$532.00
$2,575.00
Harney Lane Lift Station
0-f—FORD
080431
NG
75
$330.00
$615.00
OLYMPIAN
NG
Mokelumne Village Lift
1,003
FORD
G20F3
20
$330.00
$615.00
Station
OLYMPIAN
�North/East Lift Station
983
WHITE
30RHZ02.10 KW
NG
10
$330.00
$615.00
KOHLER
PetersonPark Storm Pump
986
FORD
2ORZ-20KW
20
$330,00
$615.00
Station & Lift Station
KOHLER
Rivergate Sewer Lift Station
003
FORD
020F3
CNG
20
$330.00
$615.00
OLYMPIAN
Tienda Lift Station
998 FORD
9BA00423A
30
$330.00
$615.00
OLYMPIAN
986 FORD OMAN
200ES15R/24164B
Woodlake Sanitary Lift
N0
20
$330.00
$615,00
Stern
I
SUBTOTAL (ALL SIM
AT OLE
$8,142M$19,4260
MAINTENANCE
ISE C
SUBTOTAL A
$16,284.00
•• : .A ,;.::•:.
X 2 INSPECTIONS
, .
TOrar I$16,284,00
$19,426,00
GRAND TOTAL
0.00A+BZ$1'5,'71
Labor and material mark-up for repairs beyond Preventive Maintenan : as defer din Sec O NOT include in
bid tabulations above.
CITY OF LODI
STANDBY GENERATOR MAINTENANCE AND REPAIR CONTRACT
Maintenance Contract
Generator Specifications
Unit Price A,
Unit Price B,
Items
Preventative
Annual
Maintenance
(Level 2)
(Level l)
Inspection,
Inspection,
Price Per
Price Per
Inspection
Inspection
LOCATION
YEAR MAKE MODEL FUEL KW
Repair Items
GENERATOR REPAIR,7T
? •::s :..:'°•;..', .
LABOR ONLY, PRICE
$124.00
PER HOUR
GENERATOR REPAIR,
LABOR ONLY, PRICE
$186.00
PER HOUR
(WEEKENDS):
GENERATOR REPAIR,
LABOR ONLY, PRICE
$248.00
PER HOUR (HOLIDAYS)
GENERATOR PARTS &
MATERIALS MARK-UP
15%
ARTICLE IV - By my signature hereunder, as Contractor, I certify that I am aware of the
provisions of Section 3700 of the Labor Code, which requires every employer to be insured
against liability for workers' compensation or to undertake self-insurance in accordance with the
provisions of that code, and I will comply with such provisions before commencing the
performance of the work of this contract.
ARTICLE V - It is further expressly agreed by and between the parties hereto that, should there
be any conflict between the terms of this instrument and the Bid of the Contractor, then this
instrument shall control and nothing herein shall be considered as an acceptance of the said terms
of said bid conflicting herewith.
ARTICLE VI - The City is to furnish the necessary rights-of-way and easements for the work as
specified under the Special Provisions, All labor or materials not mentioned specifically as
being done by the City will be supplied by the Contractor to accomplish the work as outlined in
the documents.
ARTICLE VII — The Contractor agrees to commence work pursuant to this contract as directed
by the City within 15 days of receipt ofNotice to Proceed.
WHEN SIGNING THIS CONTRACT, THE CONTRACTOR AGREES TO SUBMIT
MONTHLY BILLINGS NO LATER THAN THE I OTH OF EACH MONTH.
IN WITNESS WHEREOF, the parties to these presents have hereunto set Phar hands the year
and date written below.
CITY OF LODI
STANDBY GENERATOR MAINTENANCE AND REPAIR CONTRACT
CONTRACTOR: CITY OF LODI
By: .�A
Konradt Bartlam, City Manager
Date: -7-1. 2-1.1
Attest:
1 iue
i Johl, Clerk
(CORPORATE SEAL)
Approved as to form:
Exhibit B
PROPOSED CHANGE ORDER AND REQUEST FOR PROPOSAL
PROJECT: Standby Generator Maintenance C.O. NO:
PCO NO:
CONTRACTOR: Holt of California RFINO:
ARCHITECT/ENGINEER: NA FI NO: _
Submit Proposal Within 15 Days Upon Receipt of This Request
Brief Description Of Work.
The intention of the Standby Generator Maintenance contract was to incorporate all City generators into one contract.
Two generators (Hutchins Street and Library) were unintentionally left out of the original contract. Additionally, the
Facilities Department would like to have load testing done on some of the generators (see table below) that are used in
emergency situations. These units are tested on a regular -basis, but not under full load conditions.
Total i 4 2,16
l eest, Pro osal, Ri;cOi r—ne.ildai,ion And r J Lovai
Requesting Official: Lance Roberts Date of Request: 09/12/11 Schedule Impact—0 Days
Contractor Proposal Date: N/A Add Amount: $ 7,125.00 Deduct Amount: N/A
Reason For Change: Additional work added to original contract'by city Account 103511.7331/347115.7323
Requested By: Lance Roberts, Water/Wastewater/Streets Superintendent
CONTRACTOR AGREES TO FURNISH ALL LABOR AND MATERIALS AND PERFORM ALL WORK REQUIRED TO COMPLETE THE
ABOVE DESCRIBED WORK CHANGE IN ACCORDANCE WITH THE REQUIREMENTS FOR SIMILAR WORK COVERED BY THE
CONTRACT EXCEPT AS OTHERWISE STIPULATED HEREIN FOR THE STATED CONSIDERATION. TO PERFORM THE CHANGES FOR
THE AMOUNT INDICATED—WHICH INCLUDES ANY EXTENDED OR JOBSITE OVERHEAD, DISRUPTION, RIPPLE EFFECT AND OTHER
IMP T C94S. NO ILL BE STARTED UNTIL THIS PROPOSAL IS ACCEPTED.
ORIGINAL CONTRACT $ 35,710.00
for Date
PREVIOUS ADDS $ 0.00
% e1, -1 f�i ! - l�* %
PREVIOUS DEDUCTS $ 0.00
Construct' Manager Date
THIS CHANGE $ 7128.00
�
CONTRACT TO DATE $42,838.00
Public Works Date
CONTRACT TIME ADJUSTMENT 0 DAYS
ORIGINAL CONTRACT
COMPLETION DATE:
City Manager<;w— pate
--- — 10•'2-4-1
ADJUSTED CONTRACT -
COMPLETION DATE:
PCO Standby Generator Maint 7331.doe 09/20/2011
Exhibit C
5-4131nsurance Requirements for Contractor The Contractor shall take out and maintain during the life of this
contract, insurance coverage as listed below. These insurance policies shall protect the Contractor and any
subcontractor performing work covered by this contract from claims for damages for personal injury, including
accidental death, as well as from claims for property damages, which may arise from Contractor's operations under
this contract, whether such operations be by Contractor or by any subcontractor or by anyone directly or indirectly
employed by either of them, and the amount of such insurance shall be as follows:
COMPREHENSIVE GENERAL LIABILITY
$2,000,000 Ea. Occurrence
$4,000,000 Aggregate
COMPREHENSIVE AUTOMOBILE LIABILITY
$1,000,000 Bodily Injury - Ea. Person
$1,000,000 Bodily Injury - Ea. Occurrence
$1,000,000 Property Damage- Ea. Occurrence
NOTE: Contractor agrees and stipulates that any insurance coverage provided to the City of Lodi shall provide for a
claims period following termination of coverage which is at least consistent with the claims period or statutes of
limitations found in the California Tort Claims Act (California Government Code Section 810 et seq.).
A copy of the certificate of insurance with the following endorsements shall be furnished to the City:
(a) Additional Named Insured Endorsement
Such insurance as is afforded by this policy shall also apply to the City of Lodi, its elected and appointed
Boards, Commissions, Officers, Agents, Employees, and Volunteers as additional named insureds.
(This endorsement shall be on a form furnished to the City and shall be included with Contractor's policies.)
(b) Primary Insurance Endorsement
ff d d by the endorsement for the Additional insureds shall apply as primary insurance.
�ULII insurance as Is afforded
Any other insurance maintained by the City of Lodi or its officers and employees shall be excess only and not
contributing with the insurance afforded by this endorsement.
(c) Severability of Interest Clause
The term "insured" is used severally and not collectively, but the inclusion herein of more than one insured shall
not operate to increase the limit of the company's liability.
(d) Notice of Cancellation or Chancre in Coveracre Endorsement
This policy may not be canceled nor the coverage reduced by the company without 30 days' priorwritten notice
of such cancellation or reduction in coverage to the City Attorney, City of Lodi, P.O. Box 3006, Lodi, CA 95241.
5-414Compensation Insurance The Contractor shall take out and maintain during the life of this contract, Worker's
Compensation Insurance for all of Contractor's employees employed at the site of the project and, if any work is
sublet, Contractor shall require the subcontractor similarly to provide Worker's Compensation Insurance for all of the
latter's employees unless such employees are covered by the protection afforded by the Contractor. In case any
class of employees engaged in hazardous work under this contract at the site of the project is not protected under the
Worker's Compensation Statute, the Contractor shall provide and shall cause each subcontractor to provide
insurance for the protection of said employees. This policy may not be canceled nor the coverage reduced by the
company without 30 days' prior written notice of such cancellation or reduction in coverage to the City Attorney, City
of Lodi, P.O. Box 3006, Lodi, CA 95241.
NOTE: Certificate HolderAddress: City of Lodi
221 West Pine Street
Lodi CA 95240
RESOLUTION NO. 2012-99
A RESOLUTION OF THE LODI CITY COUNCIL
AUTHORIZING CITY MANAGER TO EXECUTE
ONE-YEAR EXTENSION OF CONTRACT FOR
STANDBY GENERATOR MAINTENANCE AND REPAIR
WHEREAS: on May 4, 2011, City Council awarded the contract for standby
generator maintenance and repair to Holt of California, of West Sacramento, California;
and
WHEREAS: a change order in the amount of $2,606 was executed: which added
preventative maintenance for two additional generators that were inadvertently omitted
from the original contract; and
WHEREAS, the specifications included an option to renew the contract: and Holt
of California has offered to extend the existing contract prices through 2013 with no cost
increase; and
WHEREAS: staff recommends executing a one-year extension of the contract
with Holt of California.
NOW, THEREFORE: BE IT RESOLVED that the Lodi City Council does hereby
approve a one-year extension of the contract with Holt of California: of
West Sacramento: California: for standby generator maintenance and repair in the
amount of $38,316; and
BE IT FURTHER RESOLVED that the City Council does hereby authorize the
City Manager to execute the contract extension on behalf of the City of Lodi.
Dated: June 20,2012
I hereby certify that Resolution No. 2012-99 was passed and adopted by the City
Council of the City of Lodi in a reguiar meeting held June 20, 2012, by the following vote:
AYES: COUNCIL MEMBERS— Hansen, Johnson, Katzakian, and
Mayor Mounce
NOES: COUNCIL MEMBERS — None
ABSENT: COUNCIL MEMBERS— Nakanishi
ABSTAIN: COUNCIL MEMBERS— None
&ND1HL
City Clerk
2012-99