HomeMy WebLinkAboutAgenda Report - May 18, 1988 (49)TO: Cite Council
FROM: City Manager
MEETING DATE: May 13, 1988
C �UNCIL COMMUNICATION
AGENDA TITLE: Authorize City Manager and City Clerk to Execute Design
Engineering Agreement for White Slough Water Pollution
Control Facility Expansion
RECOMMENDED ACTION: That the City Council authorize the City Manager and
City Clerk to execute the Design Engineering Agreement ('Work Order No. 2 of
Master Agreement) between the City of Lodi and the engineering firm of Black
and Veatch.
BACKGRMND INFORMATION: In February 1987, the City Council approved the
Master Agreement, together with the Preliminary Engineering Agreement (Work
Order No. 1), between the City and the firm of Black and Veatch. The work
under the Preliminary Engineering Agreement is essentially complete.
The work under the Design Engineering Agreement includes the preparation of
the plans, specifications, estimate, and obtaining necessary approvals froni
other regulatory agencies.
The total estimated cost under the Design Engineering Agreement, Work Order
No. 2, is $628,150.00. It is estimated that the work under this agreement
w i I I take approximately 300 calendar days,
The City Attorney i s naw reviewing the agreement and it will be
hand-deliveZnder separate cover.
&JacL.Ronsko
orks Director
JLR/ma
cc: water/Wastewater Superintendent
City Attorney
Black and Veatch
MEMORANDUM, City of Lodi, Public Works Department
TO: City Manager and City Council
FROM : Publ is Works Director
DATE : N -.-Ay 16, 1988
SUBJECT: Transmittal of Agreement for Agenda Item E-7, "Authorize City
Manager and City Clerk to Execute Design Engineering Agreement
for White Slough Water Pollution Control Facility Expansion"
Attached for inclusion in your Council packet is a copy of the proposed
Design Engineering Agreement between Black and Veatch and the City of Lodi.
This agreement, together with the Master Agreement, has been reviewed by
the City Attorney.
Jacf2,L. Ronsko
Publi Works Director
JLR/ma
Attachment
cc: C ity;,,,Cj&k-k"'
City`Attorney
Water/Wastewater Superintendent
Black and Veatch
ATTACMENT TO ENGINEERING AGREaIENT
BETWEEN 2 `�
CITY OF LODI
AND
BLACK & VEATCS 'O �'. k -• ;L '7
DATED _ 1988
J0
_
WORK ORDER NO. 2 � �fl���`, `u� � -
CESIGN M,GINEERING o� �� \ << OL
10
P iJR PO S E
The purpose of Work Order No. 2 is to authorize design engineering for the
preparation of construction drawings and specifications for the project as
described in the Design Memorandum, Capacity Expansion Improvements, White
Slough Water Pollution Control Facility, prepared by Black & Veatch in
January 1988 for .he City of Lodi.
Scope of Work
Plans and specifications will be prepared for the following facilities and
improvements as described in the attached design memorandum:
1. Preliminary treatment modiffcstions:
o Rebuild comminutors.
o New grit pumps and washer, cyclone, and grit loading
facilities.
2. influent pumping, piping, valves, equfpment modifications, and
pump controls.
3. Two new primary clarifiers and associated pumping equipment, and
pump room modifications (i.e., structural, pump controls,
- DRAFT -
4. New aeration basin, modifications to existing basins and VUS
lines, blowers, air piping and Slower controls, establishment of
additional feed points.
5. Two new secondary clarifiers with a return and waste sludge
pumping station, pump controls, and flowmetering equipment.
6. Conversion of existing secondary clarifiers to chlorine cont<9ct
basins.
7. New waste activated sludge thickening facilities or modification
of existing DAF unit. To be decided after further review by City
staf f and Black & Veatch.
8. A new egg-shaped anaerobic digester and upgrade of existing
digesters and inclusion of two (2) new gas recirculation systems.
9. New cogeneration equipment.
10. New effluent return system.
11. Sludge lagoon modifications.
12. Correction of irrigation system deficiencies.
13. Control building modifications, i.e, instrumentation and PC for
data storage and/or control.
14. Tank and groundwater dewatering facilities.
- DRAFT -
Time for Completion
From the date of authorization to proceed, time to complete the design
engineering phase is 300 calendar days.
Compensation and Payment
Compensation shall be based as provided for in Section II of the Agreement,
with the exception that indirect expenses shall equal 1.3 times the direct
labor cost. The cost for the work is $549,513 and the fixed fee is $78,637
with a total price of $628,150. An additional $50,000 i s provided for
alternate projects, special studies, or increased scope items (Work Element
No. 6). This fund is to be used only as mutually agreed by the Public
Works Director and the project manager. A separate monthly accounting of
any use of this fund will be provided to the City.
Details of the cost estimate are summarized in Attachment No. 3 to this
Work order.
Effective Date
This work order shall be authorized on the last date executed by the parties
signing below.
Date
Date
BLACK & VEATCH, ENGINEERS ARCHITECTS
By
Title
Attested By:
CITY OF LODI
By
Thomas A. Peterson
T i t l e City Manager
- DRAFT -
Approved as to form:
Bob Mcliatt
Title City Attorney
Attest:
Alice M. Reimche
Title City Clerk
CITY OF LODI
ATTACI*ENT NO. I TO WORT: ORDER NO. 2
PRELIMINARY SHEET LIST
LODI, CALIFORNIA, WHITE SLOUGH WATER POLLUTION CONTROL FACILITY EXPANSION
GENERAL SHEETS
0 Cover Sheet
GI Sheet List
G2 Hydraulic Profile
G3 Abbreviations
G4 Legend
G5 Design Criteria, Equipment Piping and Valve Codes
Gu General Layout 1" R 50'
G7 Liquid Schematic
G8 Solids Schematic
G9 Yard Piping I" = 20' (east)
GIO Yard Piping I" = 20' (central)
Gil Yard Piping I" = 20' (west)
G12 Yard Piping Details
G 13 Yard Piping Details
C14 Effluent Control Box
G15 Effluent Return Facilities - Plans and Sections
G16 Grading and Paving (east)
G17 Grading and Paving (central)
G18 Grading and Paving (west)
G19 Grading and Paving Details
'G20 Grading and Paving.Details
CTDTTr-rTTA AT
- DRAFT -
STRUCTURAL (Continued)
s4 Primary Sedirr_,ntation Basins - Sections and Details
S5 Aeration Basin - Top and Bottom Plan
S6 Aeration Basin - Section and Details
S7 Splitter Box
S8 Secondary Clarifier Complex - Plar,
59 Secondary Clarifier Complex - Sections and Details
S10 Secondary Sludge Pumping Station - Plans
Sll Secondary Sludge Pumping Stations - Sections and Details
s12 Existing Secondary Sedimentation Tanks - Plan Removals
S13 Existing Secondary Sedimentation Tanks - Sections Removals
S14 Existing Secondary Sedimentation Tanks - Modifications
S15 Sludge Thickening Facilities - Plan
516 Sludge Thickening Facilities - Sections and Details
S17 Sludge Thickening Facilities - Sections and Details
S18 Anaerobic Digester - Plan
S19 Anaerobic Digester - Sections and Details
S20 Cogeneration Facilities - Plan, Sections, and Details
S21 Control Building Modifications - Plan, Sections, and Details
S22 Miscellaneous Structural Details
S23 Standard Concrete Sheet
ARCHITECTURAL
Al Control Building Modifications - Plans
A2 Control Building Modifications - Sections and Details
A3 Control Building Modif icdtions - Door/Window/Finish Schedule
L AUV TTAXTFI- AT
Ml Headworks -Operating Floor - Plan
MZ Headworks - Sections and Details
M3 Sludge Dewatering Building - Plans, Sections, and Details
M4 Primary Sedimentation Basins - Plan
M5 Primary Pump Ronin - Plan
M6 Primary Sedimentation Basin and Pump Room - Sections and Details
M7 Control Building - Blower Room Plan
May 12, 1988.:.
- DRAFT -
MECHkNICAL (Continued)
M8 Control Building - Blower Room Sections and Details
M9 Aeration Basin - Top Plan
MIO Aeration Basin - Gallery Plan
Mi 1 Aeration Basin - Sections and Details
*112 Secondary Clarifier Complex, - Plan
MB Secondary Clarifier Complex - Sections and Details
M14 Secondary Sludge Pumping Station - Plans
M15 Secondary Sludge Pumping Station - Sections and Details
M16 Secondary Sludge Pumping Station - Details
M17 Chlorine Contact Tanks - Plan
M18 Chlorine Contact Tanks - Sections and Details
M19 Chlorine Feed Room/Chlorine Feed Schematic
MO Sludge Thickening Facilities - Plan, Sections, and Details
M21 Sludge Thickening Facilities - Polymer Feed Schematic
M2 Existing Anaerobic Digesters - Floor Plans
M?3 Existing Anaerobic Digesters - Sections and Details
M24 Existing Anaerobic Digesters - Digester Plans
M25 Existing Anaerobic Digesters - Sections and Details
M26 New Anaerobic Digester - Piping Plan
M27 New Anaerobic Digester - Sections and Details
M28 Cogeneration Facilities - Piping Plans
M29 Cogeneration Facilities - Sectiocs and Details
M30 Cogeneration Facilities - Heat Loop Schematic/Digester Gas Schematic
M31 Control Building Ilodifications - Plumbing/HVAC
M32 Standard Details
M33 Standard Details
ELECTRICAL
El. Legend and Abbreviations
E2 Site Plan
E3 Site Plan
E4 Site Plan
E5 Duct Bank Sections
E6 Manholes and Handholes
:- iRICAL (Continued)
E7
Power Distribution One -line
E8
Headworks PICC -B One -line
Ej
Sludge Dewatering PSCC -G One -line
E1C
Control Building PICC -A One -line
E 11
Digester Control Building MCC -E One -line
E 12
Effluent Pumping PICC-R/Chlorine Room PICC -D One -Lines
E13
Secondary Sludge Pump Station Cme-line
E14
Gravity Belt Thickener One -line
E15
Miscellaneous One -line
E16
PLC System Ladder Diagram
E17
PLC System Ladder Diagram
E 18
Schematics
E19
Schema t i c s
E20
Schematics
E22
PLC System One -lines
E23
PLC 1/0 Schedules
E24
Instrument P&ID Legend
E25
P&ID
E25
P&ID
E27
P&ID
E28
P&ID
E29
.. Instrumentation Devfce Schedule
E30
Instrumentation
E31
Instrumentation
E32
Headworks - Power Wiring and Lighting
E33
Sludge Dewatering Building - Power Wiring and Lighting
f_ E34
"Primary Sedimentation - Power Wiring and Lighting
E35
Control Building - Power Wiring and Lighting
E36
,...,Aeration Basin - Power Wiring and Lighting
E37
- Dige- ter Control Building - Power Wiring and Lighting
E38
laneous Power Wiring and Lighting
City of Lodi
Attachment No. 2 to
WHITLEY, BURCHETT work order No. 2
and Associates, tnc.
May 4, 1988
Black and Veatch
3470 'Buskirk Avenue
Pleasant Hill, California 94523
Attention: Mr. Ken Jones
Subject: City of Lodi White Slough WPCP Expansion Project
Amended Proposal for Professional Engineering Services
Dear Mr. Jones:
I am pleased to submit this amended proposal to furnish
professional engineering services on the White Slough Water
Pollution Control Plant expansion project, The scope of work for
this proposal reflects comments regarding my original proposal by
the City of Lodi and our discussions regarding the appropriate
arrangements between Black And Veatch and Whitley, Burchett and
Associates.
The purpose of my involvement would be to oversoe the development
of the project design and to represent the city's interests in
matters with outside agencies, contractors and Black and Veatch,
General responsibilities would include project review and quality
control, and serving as a special consultant to the city and Black
and Veatch on an as needed basis.
To maintain a clear line of responsibility for the overall design
of the project between the City of Lodi and Black and Veatch, my
position on the design team would be as a special consultant and
member of the Quality Control Committee.
During the detailed design phase of the project, the scope of
services would include the following:
1. Attend regular meetings of the design team.
2. Review drawing check prints and draft specifications
monthly,
3. Participate as member of Quality Control Committee in
the normal B&V quality control process.
4, Review project correspondence,
5. Attend meetings with the city and outside agencies, as
required by the city.
6. Other tasks, as required by the city or Black and
Veatch.
The scope of services during the conttruction phase would include
the following:
1. Attend regular monthly construction meetings with the
contractor.
Mr. Ken Jcnes
May 4, 1988
?age 2
2. Monthly visit to construction site.
3. Review construction correspondence.
4. Assist city in deliberations regarding contract changs
orders.
5. Assist city in resolving disputes.
6. Other task, as required by the city or Black and
Veatch.
An estimate of the budget for the detailed design phase of the
project is attached as Exhibit A. This budget is based on 9-1/2
months to prepare the bid documents as indicated in the project
schedule dated February 4, 1988. Budgets for the optional work
are allowances; actual budgets would be determined on a
case-by-case basis.
Please review this proposal and let me know if it is satisfactory.
I am looking forward to working with you and the city on this
important project.
Very truly yours,
WHITLEY, BURCHETT and ASSOCIATES, Inc.
Max E. Eurchett, P.E.
EXHIBIT A
City of Lodi White Slough WPCP Expansion Project
Professional Engineering Services - Max E. Burchett
Amended Budget Estimate - Detailed Design Pnase
1. Attend regular meetings of design team
1 meeting/week, 1 hour/meeting, 9.5 months = 41 hours
2. Review drawing check prints and draft specifications
3 hours/month, 9.5 months = 28.5 hours
3. Quality Control Committee (50% & 90%)
2 reviews, 24 hours/review =
4. Review project correspondence
1 hour/week, 9.5 months =
5. Attend meetings with city and outside agencies
Assume 2 meeting/month,
4 hours/meeting, 9.5 months =
6. Other tasks, as required
Assume 80 hours (allowance) _
Total
48 hours
41 hours
76 hours
80 hours
314.5
say 320 hours
320 hrs/9.5 mo
33+ hrs/mo
Budget - Labor 320 hours @ $94 = $30,080
Mileage 2400 miles @ $0.25 = 600
Telephone 9 months @ $25 = 225
Postage 15
$301920
Description
General & Mechanical
Sheets
Work Element No. 1
CITY OF LODI
ATTACIZIENT NO. 3 TO WORK ORDER NO. 2
COST SUMMARY
Direct Indirect* Direct Fixed
Labor Expenses Expenses Subtotal Fee
Total
cost
101,193 131,551 4,000 236,744 35,510 272,254
Structural & 'kr chi-
tectural Sheets
Work Element No. 2
36,181
47,035
2,000
85,216
12,784
98,000
Electrical Sheets
Work Element No. 362,676
81,479
2,000
145,155
21,925
168,080
Whitley, Burchett &
Associates, Inc.
Work Element No. 4
--
--
30,920
30,920
1,546**
32,466
Geotechnical Services
Work Element No. 5
--
--
7,000
7,000
350**
7,350
Supplemental Work
Work Element No. 6
18,469
24,009
1,000
43,478
6,522
50,000
Tot31
218,519
284,073
40,920
549,513
78,637
628,150
*1.3 times direct
labor.
**Five percent fee on subconsultants
to
cover cost
of additional accounting.