HomeMy WebLinkAboutAgenda Report - May 16, 2012 C-05AGENDA ITEM C-5 A% CITY OF LODI COUNCIL COMMUNICATION AGENDA TITLE: Adopt Resolution Authorizing City Managerto Execute Contractfor Hutchins Street Reconstruction Project with A. M. Stephens Construction Company, Inc., of Lodi ($863,466.53) MEETING DATE: May 16,2012 PREPARED BY: PublicWorks Director RECOMMENDEDACTION: Adopt resolution authorizing City Manager to execute contract for Hutchins Street reconstruction projectwith A. M. Stephens Construction Company, Inc., of Lodi, in the amount of $863,466.53, BACKGROUND INFORMATION: The proposed project will reconstruct and widen Hutchins Street from Lodi Avenue to Pine Street with asphalt concrete pavement, new sidewalks and handicap ramps. The project also includes wastewater and storm drain improvements and the relocation of an existing water main (Exhibit A). The existing pavement is in poor condition and the street width varies from block to block. Staff has completed the acquisition of all the necessary street easements to create a uniform width and to add a longer southbound left -turn lane at Lodi Avenue. The final improvements will improve ADA access, pedestrian safety, and traffic flow in the project area, especially near Hutchins Street Square. Bulb -outs will be installed in multiple locations to shorten the crosswalk distance and street lighting will be enhanced. Specifications for this project were approved on March 21, 2012. The City received the following four bids for this project on May 1, 2012. Construction is scheduled to be completed by September 2012. Bidder Location Bid Engineer's Estimate $817,010.00 A. M. Stephens Construction Lodi $863,466.53 MCI Engineering Stockton $865,289.00* George Reed, Inc. Modesto $915,456.00 Knife River Construction Stockton $986,455.00 'Corrected Total FISCAL IMPACT: There will be a decrease in the street maintenance cost for this section of Hutchins Street after the street reconstruction. FUNDING AVAILABLE: Funding is available through existing FY 2011/12 appropriations in the Street, Water and Wastewater Funds. Measure K (325040): $709,451 Wastewater Capital (171014): $63,240 Water Capital (1K1014): $90,776 ���� Jor an Ayers Deputy City Manager/Internal Services Director �J_e dog' F. Wally Sandelin PublicWorks Director Prepared by Lyman Chang, Senior Civil Engineer Attachment cc: Deputy PublicWorks Director— Utilities APPROVED: Konradt Bartlart) City Manager K:\WP\PROJECTS\STREETS\Hutchins Street Improvements\CAward.doc 5/8/2012 PINE I I I I, i i HUTCHINS ST LODIAVE -PINE ST -&TM&T-REC4)N8'FR-,- T.lOW EOT o o iy T�<p0 9��Foa� II& t+ j--Exhibit-A-1 LODI AVE �--- WALNUT ST I I _ I l C WALNUT ST II J I � I � I II II II Jr-= ii WALNUT ST I I _ I l C WALNUT ST HUTCHINS STREET RECONSTRUCTION (Lodi Avenue to Pine Street) CONTRACT CITY OF LODI, CALIFORNIA THIS CONTRACT made by and between the CITY OF LODI, State of California, herein referred to as the "City," and A. M. STEPHENS CONSTRUCTION COMPANY, INC., herein referred to as the "Contractor." WITNESSETH: That the parties hereto have mutually covenanted and agreed, and by these presents do covenant and agree with each other, as follows: The complete Contract consists of the following documents which are incorporated herein by this reference, to -wit: Notice Inviting Bids Informationto Bidders General Provisions Special Provisions Bid Proposal Contract Contract Bonds Plans The July 1992 Edition, Standard Specifications, State of California, Business and Transportation Agency, Department of Transportation All of the above documents, sometimes hereinafter referred to as the "Contract Documents," are intended to cooperate so that any work called for in one and not mentioned in the other is to be executed the same as if mentioned in all said documents. ARTICLE I - That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the City and under the condition expressed in the two bonds bearing even date with these presents and hereunto annexed, the Contractor agrees with the City, at Contractor's cost and expense, to do all the work and furnish all the materials except such as are mentioned in the specifications to be furnished by the City, necessary to construct and complete in a good workmanlike and substantial manner and to the satisfaction of the City the proposed improvements as shown and described in the Contract Documents which are hereby made a part of the Contract. ARTICLE II - The City hereby promises and agrees with the Contractor to employ, and does hereby employ, the Contractor to provide all materials and services not supplied by the City and to do the work according to the terms and conditions for the price herein, and hereby contracts to pay the same as set forth in Section 5.600, "Measurement, Acceptance and Payment," of the General Provisions, in the manner and upon the conditions above set forth; and the said parties for themselves, their heirs, executors, administrators, successors and assigns, do hereby agree to the full performance of the covenants herein contained. ARTICLE III - The Contractor agrees to conform to the provisions of Chapter 1, Part 7, Division 2 of the Labor Code. The Contractor and any Subcontractor will pay the general prevailing wage rate and other employer payments for health and welfare, pension, vacation, travel time, and subsistence pay, apprenticeship or other training programs. The responsibility for compliance with these Labor Code requirements is on the prime contractor. Contract.doc l 05/01/12 ARTICLE IV - And the Contractor agrees to receive and accept the following prices as full compensation for furnishing all materials and for doing all the work contemplated and embraced in this agreement; also for all loss or damage arising out of the nature of the work aforesaid or from the action of the elements, or from any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution of the work until its acceptance by the City, and for all risks of every description connected with the work; also for all expenses incurred by or in consequence of the suspension or discontinuance of work and for well and faithfully completing the work, and the whole thereof, in the manner and according to the Plans and Contract Documents and the requirements of the Engineer under them, to -wit: Perform the work necessary to install 4,500 tons of asphalt concrete, 8,700 square feet of concrete sidewalk, 2,080 linear feet of concrete curb and gutter, 600 linear feet of 8 -inch water pipe, street light system, traffic striping, and other incidental and related work, all as shown on the plans and specifications for "Hutchins Street Reconstruction, Lodi Avenue to Pine Street". CONTRACT ITEMS ITEM EST'D. NO. DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE 1. Traffic Control LS 1 $ 2,500.00 $ 2,500.00 2. Construction Notification LS 1 $ 1,500.00 $ 1,500.00 3. Water Pollution Control IS 1 $ 9,435.00 $ 9,435.00 4. Excavation Safety LS 1 $ 721.50 $ 721.50 5. Clearing and Grubbing LS 1 $ 49,300.00 $ 49,300.00 6. Abandon 6 -Inch Water Main LS 1 $ 555.00 $ 555.00 7. Roadway Excavation CY 3,867 $ 2.00 $ 7,734.00 8. Compact Original Ground SF 87,000 $ 0.17 $ 14,790.00 9. Concrete Subgrade Compaction SF 15,690 $ 1.50 $ 23,535.00 10. Asphalt Concrete TON 4,511 $ 89.55 $ 403,960.05 11. Miscellaneous Paving TON 15 $ 440.00 $ 6,600.00 Contract.doc 2 05/01/12 ITEM EST'D. NO. DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE 12. Adjust Storm Drain Manhole to Grade EA 6 $ 666.00 $ 3,996.00 13. Adjust Wastewater Manhole to Grade EA 6 $ 666.00 $ 3,996.00 14. Concrete Sidewalk/Wheelchair Ramp SF 8,700 $ 6.01 $ 52,287.00 15. Concrete Curb and Gutter LF 2,080 $ 22.23 $ 46,238.40 16. Minor Concrete Curb LF 175 $ 18.27 $ 3,197.25 17. Concrete Alley Approach SF 900 $ 8.37 $ 7,533.00 18. Residential Driveway SF 890 $ 6.40 $ 5,696.00 19. Commercial Driveway SF 890 $ 7.99 $ 7,111.10 20. 12-Inch Storm Drain LF 537 $ 59.94 $ 32,187.78 21. Side Inlet Catch Basin EA 15 $ 1,348.65 $ 20,229.75 22. Install 24-Inch Riser EA 2 $ 721.50 $ 1,443.00 23. Install Fire Hydrant and Valve EA 1 $ 4,717.50 $ 4,717.50 24. Relocate Fire Hydrant EA 2 $ 2,220.00 $ 4,440.00 25. Install 8-Inch Water Pipe LF 600 $ 78.81 $ 47,286.00 26. Install 8-Inch Water Valve EA 6 $ 1,332.00 $ 7,992.00 27. Install 1-Inch Water Service EA 8 $ 1,998.00 $ 15,984.00 Contract.doc 3 05/01/12 ITEM EST'D. NO. DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE 28. Install Temporary Blow -Off EA 1 $ 277.50 $ 277.50 29. Adjust Water Valve Frame and Cover to Grade EA 13 $ 555.00 $ 7,215.00 30. Furnish Manhole Frame and Cover EA 5 $ 277.50 $ 1,387.50 31. Furnish Water Valve Frame and Cover EA 13 $ 177.60 $ 2,308.80 32. Street Sign Post EA 6 $ 388.50 $ 2,331.00 33. Traffic Striping LS 1 $ 9,518.25 $ 9,518.25 34. Street Light System LS 1 $ 44,918.15 $ 44,918.15 35. Yard Restoration LS 1 $ 10,545.00 $ 10,545.00 TOTAL $ 863,466.53 ARTICLE V - By my signature hereunder, as Contractor, I certify that I am aware of the provisions of Section 3700 of the Labor Code, which requires every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract. ARTICLE VI - It is further expressly agreed by and between the parties hereto that, should there be any conflict between the terms of this instrument and the Bid Proposal of the Contractor, then this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said proposal conflicting herewith. ARTICLE VII - The City is to furnish the necessary rights-of-way and easements and to establish lines and grades for the work as specified under the Special Provisions. All labor or materials not mentioned specifically as being done by the City will be supplied by the Contractor to accomplish the work as outlined in the specifications. ARTICLE VIII - The Contractor agrees to commence work pursuant to this contract within 15 calendar days after the City Manager has executed the contract and to diligently prosecute to completion within 60 WORKING DAYS. Contract.doc 4 05/01/12 WHEN SIGNING THIS CONTRACT, THE CONTRACTOR AGREES THAT THE TIME OF COMPLETION FOR THIS CONTRACT IS REASONABLEAND THE CONTRACTOR AGREES TO PAY THE CITY LIQUIDATED DAMAGES AS SET FORTH IN SECTION 6-04.03 OF THE SPECIAL PROVISIONS. CONTRACTOR AGREES THAT THIS AMOUNT MAY BE DEDUCTED FROM THE AMOUNT DUE THE CONTRACTOR UNDER THE CONTRACT. IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands the year and date written below. IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands the year and date written below. CONTRACTOR: CITY OF LODI By: Konradt Bartlam City Manager By: Date: Title Attest: City Clerk (CORPORATE SEAL) Approved As To Form D. Stephen Sch City Attorney Contract.doc 5 05/01/12 RESOLUTION NO. 2012-67 A RESOLUTION OF THE LODI CITY COUNCIL AWARDING CONTRACT AND AUTHORIZING THE CITY MANAGER TO EXECUTE CONTRACT FOR HUTCHINS STREET RECONSTRUCTION PROJECT WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened on May 1, 2012, at 11:00 a.m., for the Hutchins Street Reconstruction Project, described in the plans and specifications therefore approved by the City Council on March 21, 2012; and WHEREAS, said bids have been checked and tabulated and a report thereof filed with the City Manager as follows: Bidder Bid A. M. Stephens Construction Company, Inc. $ 863,466.53 MCI Engineering $ 865,289.00" George Reed, Inc. $ 915,456.00 Knife River Construction $ 986,455.00 *Corrected Total WHEREAS, staff recommends awarding the contract for the Hutchins Street Reconstruction Project to the low bidder, A. M. Stephens Construction Company, Inc., of Lodi, California, in the amount of $863,466.53. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby award the contract for the Hutchins Street Reconstruction Project to the low bidder, A. M. Stephens Construction Company, Inc., of Lodi, California, in the amount of $863,466.53; and BE IT FURTHER RESOLVED that the City Manager is hereby authorized to execute the contract. Dated: May 16, 2012 hereby certify that Resolution No. 2012-67 was passed and adopted by the City Council of the City of Lodi in a regular meeting held May 16, 2012, by the following vote: AYES: COUNCIL MEMBERS — Hansen, Johnson, Katzakian, Nakanishi, and Mayor Mounce NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — None ABSTAIN: COUNCIL MEMBERS — None 4Z)JOHL City Clerk 2012-67