HomeMy WebLinkAboutAgenda Report - May 2, 2012 C-04AGENDA ITEM C O*LA zd"w FISCAL IMPACT: Varies by project. All purchases were budgeted in the 2011-2012 Financial Plan. FUNDING AVAILABLE: Funding as indicated on Exhibits. i—ordari-Ayers, Deputy City)Manager Prepared by Sherry Moroz, Purchasing Technician JA/sm Attachment APPROVED:-- MMUNICATION 11M AGENDA TITLE: Accept Quarterly Report of Purchases Between $10,000 and $20,000 MEETING DATE: May2,2012 PREPARED BY: Deputy City Manager RECOMMENDED ACTION: Accept quarterly report of purchases between $10,000 and $20,000. BACKGROUND INFORMATION: During the first calendar quarter of 2012, the following purchases were awarded. Background information for each purchase is attached as ExhibitsA through Q. Exh. Date Contractor Project Award Amt. A 1/10/12 ERMCO Transformers $18,436.03 B 1/10/12 All Phase ElectricSupply Streetlight Heads and Globes $16,264.86 C 1/11/12 General Pacific Inc. Wire $13,813.56 D 1/30/12 Jensen Precast Concrete Vault, Risers, Lids& $13,888.98 Adapters E 1/19/12 Bobcat Central Inc. Surface Water Treatment Plant $14,686.06 UtilityVehicle F 1/26/12 Survalent Technology Corp. SCADA System Annual Maint. $19,480.00 G 1131/12 Osmose Software Update& Licenses $10,512.48 H 2/1/12 Foster Flow Control Secondary Effluent Bypass 24" $13,475.63 1 2/7/12 General Pacific Inc. Transformer and Wire $11,372.93 J 3/6/12 ERMCO Padmount Transformers $10,826.72 K 3/6/12 ERMCO Pole Mount Transformers $11,182.30 L 3/13/12 CompuCom Software Compliance Manager $13,200.25 M 3/13/12 Golden State Flow Measurement 8" Chamber Meter $14,470.83 N 3/19/12 Aqua Aerobics Systems Inc. White Slough Cloth Sack $19,574.94 Replacement 0 3/27/12 Entisys Solutions Inc. EUD Data Warehouse $19,809.47 P 3/29/12 Wesco Distribution 3 Phase Module Cabinets $12,916.26 Q 3/29/12 Wesco Distribution Tension Sleeve, DA Bolts & $10,220.62 Concrete Boxes FISCAL IMPACT: Varies by project. All purchases were budgeted in the 2011-2012 Financial Plan. FUNDING AVAILABLE: Funding as indicated on Exhibits. i—ordari-Ayers, Deputy City)Manager Prepared by Sherry Moroz, Purchasing Technician JA/sm Attachment APPROVED:-- EXHIBIT A RECOMMENDATION FOR CONTRACT AWARD PROJECT NAME: DEPARTMENT: CONTRACTOR AWARD AMOUNT: DATE OF RECOMMENDATION: Electric Inventory Electric Utility Ermco C/O Hees Enterprises $18,436.03 01/10/12 BIDS OR PROPOSALS RECEIVED: Ermco C/O Hees Enterprises HD Supply Utilites Portland Howard Industries Silicone Core Howard industries Amorphous Core Pacific Utility Supply "NO BID" or NO RESPONSE RECEIVED: $18,436.03 $20,353.98 $22,390.45 $22,185.73 $21,593.10 BACKGROUND INFORMATION& BASIS FOR AWARD: These transformers are for the Electric Inventory. They will be used in new construction, and also replacement of failed transformers in the system. Ermco is the low responsible bidder and was awarded the Purchase Order. FUNDING: 160.1496 Prepared by: Randy Lipelt Title: Buyer __ _ _ Reviewed by: Aj Purchase Order 1h.: 20960 EXHIBIT B RECOMMENDATION FOR CONTRACT AWARD PROJECT NAME: DEPARTMENT: CONTRACTOR AWARD AMOUNT: DATE OF RECOMMENDATION BIDS OR PROPOSALS RECEIVED: All Phase Electric Supply Electric Inventory Electric Utility All -Phase Electric Supply $16,264.86 01/10/12 "NO BID" or NO RESPONSE RECEIVED: General Pacific HD Supply Benicia HID Supply Portland Rexel Wesco Distribution Platt Electric Supply $16,264.86 BACKGROUND INFORMATION& BASIS FORAWARD: These streetlight heads and globes are for the Electric Inventory. They will be used in new construction, and also replacement of failed streetlight heads and globes in the system. AD Phase Electric Supply is the low responsible bidder and was awarded the Purchase Order. FUNDING: 160.1496 Prepared by: Randy Lipelt Title: Reviewedby: Purchase Order No.: 20965 EXHIBIT C RECOMMENDATION FOR CONTRACT AWARD PROJECTNAME: DEPARTMENT: CONTRACTOR AWARD AMOUNT: #8 Str Red and Green Wire Electric Utility General Pacffic $13,813.56 DATE OF RECOMMENDATION: 0111112012 BIDS OR PROPOSALS RECEIVED: General Pacific All Phase Rexel Platt Intraline HD Supply Benicia "NO BID" or NO RESPONSE RECEIVED: GEXPRO Wesco Distribution HD Supply Portland One Source Distribution $13, 8 i 3.56 $14,115.25 $1 6,162.50 $15,128.10 $20,472.50 $1 5,085.00 BACKGROUND INFORMATION& BASIS FORAWARD: The wire is for the fusing and grounding of streetlights. General Pacificwas the low responsible bidder and was awarded the Purchase Order. FUNDING: 160,1496 Prepared by: Randy Lipelt Title: Buyer Reviewed by -y �LAO-� Purchase Order No.: 20967 EXHIBIT 0 RECOMMENDATION FOR CONTRACT AWARD PROJECT NAME: DEPARTMENT: CONTRACTOR Concrete Vault risers, lids &adapters Electric Utility Jensen Precast AWARD AMOUNT: $13,888.98 DATE OF RECOMMENDATION: 01130/2012 BIDS OR PROPOSALS RECEIVED: Jensen Precast "NO BID" or NO RESPONSE RECEIVED: Utility Vault/Old Castle $13,888.98 BACKGROUND INFORMATION& BASIS FORAWARD: The concrete vault parts are used in repair of existing vaults. They are also used in new vault construction. The vault parts are made to our specification so that they will work on either a Jensen Vault or a Utility Vault/Oldcastle. Jensen and Utility Vault are the only two manufactures in the City Electric System, Oldcastle has purchased Utility Vault, Brooks Concrete, Christy Concrete, and other vault manufactures. Jensen Precast is the low responsible bidder and was awarded the Purchase Order. FUNDING: 160.1496 Prepared by: RandyLipelt Title: B ,��wReviewed by: )!t-- 6 Purchase Order No.: 20986 EXHIBIT E RECOMMENDATION FOR CONTRACT AWARD PROJECT NAME: SurfaceWater Treatment Plant UtilityVehicle DEPARTMENT: PublicWorks; CONTRACTOR Bobcat Central Inc. AWARD AMOUNT: $14,686.06 DATE OF RECOMMENDATION: 101/19/2012 BIDS OR PROPOSALS RECEIVED: Bobcat Central Inc. Garton Tractor $14,870.95 Woodland Tractor& Equipment Co Inc. $15,196.69 "NO Bl1V or NO RESPONSE RECEIVED: I BACKGROUND INFORMATION& BASIS FORAWARD: ResolutionNo. 2010-182, City Council Authorizing the construction and equipment purchaseto operate included $200,000 appropriatedfor shop cf equipment. A yard utility vehicle is necessary for the every day operation of the plant. This vehicle will also be a valuable tool during the plant construction process. Public Works recommendsthe purchase of this vehicle now to be utilized during the construction using the appropriated funds. T FUNDING: 181011-1836.2300 7 Prepared by: Randy Laney Title: Fleet Services Supervisor Reviewed by: Purchase Order No. RECOMMENDATION FOR CONTRACT AwARD PROJECT NAME: DEPARTMENT: CONTRACTOR AWARD AMOUNT: DATE OF RECOMMENDATION Suwalent Electric Utility Suwalent Technology Corporation $19,480.00 January 26,2012 BIDS OR PROPOSALS RECEIVED: Survalent Technology Corporation "NOBID" cr NO RESPONSE RECEIVED: N/A EXHIBIT F $19,480.00 BACKGROUND INFORMATION & BASIS FORAWARD: Renewal of the annual maintenance contract on the City of Lodi's SCADA system that monitors and controls the electric, water, & wastewater systems in the City of Lodi. Renewal also includes training, not included in previous contract. FUNDING: Purchase Order No. 160653.7335,181011.1825.2300 Prepared by: Kevin Riedinger Title: Electric Operations—Superintendent Reviewed by: EXHIBIT G RECOMMENDATION FOR CONTRACT AWARD PROJECT NAME: Electric Engineering DEPARTMENT: Electric Utility CONTRACTOR OSMOSE AWARDAMOUNT: $10,512.48 DATE OF RECOMMENDATION: 01/31/12 BIDS OR PROPOSALS RECEIVED: Osmose "NO BID" or NO RESPONSE RECEIVED: $10,512.48 BACKGROUND INFORMATION & BASIS FORAWARD: This software update and new licenses are for an existing software package on the EUD Engineering computers. The version we own has to be updated and the individual computers must have their own licenses. FUNDING: 160612.7355 Preparedby: RandyLipelt Title: Buyer Reviewed by: Purchase Order No.: EXHIBIT H IRECOMNMNDATION FOR CONTRACT AwARD PROJECT NAME: Secondary Effluent Bypass 24" PrattfM!Iliken ButterflyValve DEPARTMENT: PubllcWorks CONTRACTOR Foster Flow Control AWARD AMOUNT: $13A75.63 DATE OF RECOMMENDATION: 2/11/12 BIDS OR PROPOSALS RECEIVED: Foster Flow Control Allied Packing Frank Olsen (vendor did not spec like equipment) "NO BID" or NO RESPONSE RECEIVED: $13,475.63 $13,676.25 $11,373.42 BACKGROUND INFORMATION& BASIS FORAWARD: The valve will enablethe secondary effluentto bypass the filters and UV system into the ponds, saving wear and tear on equipment and a savings in electrical usage. FUNDING: Purchase Order No. 170403.7331 Prepared by: Kelly Powers Title: WaterNVastewater Supervisor Reviewedby,:/ EXHIBIT I RECOMMENDATION FOR CONTRACT AWARD PROJECT NAME: DEPARTMENT: CONTRACTOR AWARD AMOUNT: DATE CF RECOMMENDATION: Current Transformer, #12 str cu wire, #8 Str cu wire Electric Utility General Pacific $11,372.93 02107/2012 BIDS OR PROPOSALS RECEIVED: General Pacific AD Phase N/B Current Transformer Rexel N/B Current Transformer Platt N/B Current Transformer Intraline NIB Current Transformer HDSupplyBenicia N/B Current Transformer "NO BID" or NO RESPONSE RECEIVED: GEXPRO Wesco Distribution HD Supply Portland One Source Distribution Wire Only $10,933.2 $11,184.45 $12,752.21 $15,217.00 $13,818.94 $12,202.69 W/Current Tra $11,372.93 0.00 0.00 0.00 0.00 0.00 BACKGROUND INFORMATION& BASIS FORAWARD: The current transformer is for primary metering. The wire is for the fusing and grounding of streetlights. General Pacific was the low responsible bidder and was awarded the Purchase Order. FUNDING: 160.1496 Prepared by: Randy Lipelt Title: Buyer Reviewed by:Wk-. 61iki Purchase Order No.: 20961 EXHIBIT J RECOMMENDATION FOR CONTRACT AWARD PROJECT NAME: Padmount Transformers DEPARTMENT: Electric Utility CONTRACTOR ERMCO/Hees Enterprises AWARD AMOUNT: $10,826.72 DATE OF RECOMMENDATION: 03/06/2012 BIDS OR PROPOSALS RECEIVED: Ermoo/Hees Enterprises Howard Industries ABB/Pacific Utility Supply "NO BID" or NO RESPONSE RECEIVED: CG Power Systems HD Supply Portland $10,826.72 $12,257.64 $11,313.75 BACKGROUND INFORMATION& BASIS FOR AWARD: These transformers will be used in new construction and replacementof a failed transformers in the Electric System. Ermco/Hees Enterpriseswas the low responsible bidder and was awarded the Purchase Order, FUNDING: 160.1496 Prepared by: Randy Lipelt Title: Buyer Reviewedby: Purchase Order No.: 21055 EXHIBIT K RECOMMENDATION FOR CONTRACT AwARD PROJECT NAME: DEPARTMENT: CONTRACTOR AWARD AMOUNT: DATE OF RECOMMENDATION: BIDS OR PROPOSALS RECEIVED: Ermco/Hees Enterprises HD Supply Portland Howard Industries ABB/Pacific Utility Supply Pole Mount Transformers Electric Utility ERMCO/Hees Enterprises $11,182.30 03/06/2012 "NO BID" or NO RESPONSE RECEIVED: CG Power Systems $11,182.30 $12,574.43 $13,354.54 $12,142.35 BACKGROUND INFORMATION& BASIS FOR AWARD: These transformers will be used in new construction and replacementof failed transformers in the Electric System. Ermco/Hees Enterprises was the low responsible bidder and was awarded the Purchase Order. FUNDING: 160.1496 Prepared by: Randy Lipelt Title: Buyer Reviewed by: "imz Purchase Order No.: 21056 EXHIBIT L RECOMMENDATION FOR CONTRACT AwARD PROJECT NAME: Software Compliance Manager DEPARTMENT: Internal Scvs%ISD CONTRACTOR Compucom AWARD AMOUNT: $13,200.25 DATE OF RECOMMENDATION: 3-13-12 BIDS OR PROPOSALS RECEIVED: COMPUCOM $13,200.25 ideal Solutions $14,623.35 Express Matrix $15,362.00 "NO BID"' cr NO RESPONSE RECEIVED: BACKGROUND INFORMATION& BASIS FOR AWARD: The purpose of this software yrogram is to automate comprehensive software license management and usage analysis FUNDING: Purchase Order No. ISD 100411.7313 Prepared by: Steve Mann Title: E Manager Reviewed by: EXHIBIT M RECOMMENDATION FOR CONTRACT AWARD PROJECT NAME: 8" Chamber Meter Purchase DEPARTMENT: PublicWorks CONTRACTOR Golden State Flow Measurement Inc AWARD AMOUNT: $14,470.83 DATE CF RECOMMENDATION: 3/13/12 BIDS OR PROPOSALS RECEIVED: Golden State Flow Measurement Inc Sole Source Letter Attached ... NO BID" or NO RESPONSE RECEIVED: $14,470.83 BACKGROUND INFORMATION& BASIS FORAWARD: The Water/Wastewater Division needs to purchase an eight inch omni meter for the Casa De Lodi meter installation project. The property owner will be paying the City of Lodi for the cost of the meter. FUNDING: 181402.1831.2100 Prepared by: Lance Roberts Title: Water/Via teWater,Superintendent. 1- 1 Reviewed by: ��M- bn WA IP - - Purchase Order No. Req Order# 1199 EXHIBIT N RECOMMENDATION FOR CONTRACT AWARD PROJECT NAME: DEPARTMENT: CONTRACTOR AWARD AMOUNT: DATE OF RECOMMENDATION: White Slough Cloth Sack Replacement PublicWorks Aqua -Aerobics Systems, Inc. $19,674.94 March 19,2012 BIDS OR PROPOSALS RECEIVED: Aqua -Aerobics Systems, Inc. "NO BID" or NO RESPONSE RECEIVED: None $19,574.94 BACKGROUNDINFORMATION & BASIS FORAWARD: No other bids were pursued as this is a sole source supplier as noted in attached letter. FUNDING: 1714 Prepared by: Kenneth Capitanich Title: ChiefWastewater Plant Operator Reviewed by. Requisibon Order No. 1222 EXHIBIT 0 RECOMMENDATION FOR CONTRACT AWARD PROJECT NAME: DEPARTMENT: CONTRACTOR AWARD AMOUNT: DATE OF RECOMMENDATION I EUD DATA WAREHOUSE ISD ENTISYS SOLUTIONS INC $19,809.47 3/27/12 BIDS OR PROPOSALS RECEIVED: ENTISYS SOLUTIONS INC $19,809.47 9T05 COMPUTER.COM $24,225.00 INSIGHT $26,001.99 "NO BID" or NO RESPONSE RECEIVED: BACKGROUND INFORMATION& BASIS FORAWARD: Electric Utility desires to utilize meter read data for statistical and transformer use tracking purposes. This device will be used for long term data storage supporting these activities, The make and model of this unit is similar to the ones previously purchased. FUNDING: Prepared by: STEVE MANN Title: IS MANAGER Reviewed by: Purchase Order No. EXHIBIT P RECOMMENDATION FOR CONTRACT AWARD PROJECT NAME: DEPARTMENT: CONTRACTOR AWARD AMOUNT: DATE OF RECOMMENDATION: BIDS OR PROPOSALS RECEIVED: Wesco Distribution HD Supply Benicia 3 -Phase Module Cabinets Electric Utility Wesco Distribution $12,916.26 03/29/2012 "NO BID" or NO RESPONSE RECEIVED: All Phase, Platt Electric Supply, GEXPRO, Intraline HD Supply Portland, Ace Supply, Rexel, Azco One Source Distribution $12,916.26 $13,059.30 BACKGROUND INFORMATION & BASIS FOR AWARD: These 3 -Phase Module Cabinets will be used in new construction and rebuilding of the current Electric System, Wesco Distribution was the low responsible bidder and was awarded the Purchase Order. FUNDING: 160.1496 Prepared by: Randy Lipelt Title: Buyer Reviewed by: PurchaseOrder No.: 21100 EXHIBIT RECOMMENDATION FOR CONTRACT AWARD F PROJECT NAME: Tension Sleeve, DA Bolts, Concrete Boxes DEPARTMENT: Electric Utility CONTRACTOR Wesco Distribution AWARD AMOUNT: $10,220.62 DATE CIF RECOMMENDATION: 03/29/2012 BIDS OR PROPOSALS RECEIVED: Wesco Distribution HD Supply Portland General Pacific Platt Electric HD Benicia AZCO One Source Distribution ALL Items Boxes Only Bolts Sleeve $10,220.62 $ 9,075.24 $447.16 $698.22 $ 14,303.49 $13,058.98 $495.65 $748.86 0.00 0.00 $621.72 0.00 0.00 $1 1,675.79 0.00 0.00 0.00 0.00 $4613.71 $928.81 0.00 $12,317.44 0.00 0.00 0.00 0.00 $497. EL $1,016.08 "NOBID" cr NO RESPONSE RECEIVED: AR Phase, GEXPRO, Intraline Ace Supply, Rexel, BACKGROUND INFORMATION & BASIS FOR AWARD: These iternswill be used in new construction and repair of the existing Electric System. WESCO Distributionwas the low responsible bidder and was awarded the Purchase Order. FUNDING: 160.1496 Prepared by: Randy Lipelt Title: Buyer Reviewedby: t, Purchase Order No.: 21104