HomeMy WebLinkAboutAgenda Report - March 22, 1989 (64)CITY OF LODI
PUBLIC WORKS DEPARTMENT
COUNCIL COMMUNI+CATION
The bid opening for this project is scheduled for March 15, 1989. Assuming
there are no problems with the bids, an award recommendation will be presented
at the Council meeting on March 22, 1989.
JffckRoinsk.o
Pks irector
JLR/ML/mt
a.
cc: Purchasing Officer
Water/Wastewater Superintendent
APPROVED:
`FILE Y0.
..., •AIW.ULM , ,
Project Data
Originally BU get€ :
1987/88
TO:
City Council
Budgeted Fund: Water Capital
Outla
Amount Budgeted: $168,000
(total
FROM:
City Manager
Total Project Estimate:
$99,700
(this
phase)
MEETING DATE:
March 22, 1989
Bid Opening Date:
3/15/89
AGENDA TITLE:
Award Contract for Well Drilling, Well 23, 55 East Harney
Lane,
and Authorize Advertising
for Bids
The bid opening for this project is scheduled for March 15, 1989. Assuming
there are no problems with the bids, an award recommendation will be presented
at the Council meeting on March 22, 1989.
JffckRoinsk.o
Pks irector
JLR/ML/mt
a.
cc: Purchasing Officer
Water/Wastewater Superintendent
APPROVED:
`FILE Y0.
..., •AIW.ULM , ,
CITY OF LODI
PL IL WpRKS DEPARTMENT1.000
RECOMMENDED ACTION: That the City Council award the contract for the above
project yli ck Drilling, Inc. in the amount of $98,460.00.
BACKGROUND INFORMATION: This well site is located on Harney Lane, west of
Stockton Street and east of the Southern Pacific Rail Line. The project
consists of d ri I I i ng a production water well. The test well results have shown
that sufficient water bearing strata are present to recommend the completion of
this well to a depth of 547 feet. Most of the recent wells are between 300 and
400 feet deep. The additional depth of this well accounts for the higher
project estimate.
Additional information from the drillers indicates prices are higher due to the
drought, material costs have risen 20%over last year, and bonding and insurance
costs have increased.
Plans and specifications for this project were approved on March 1, 1989•
The City received the following three bids for this project:
Ridde I nratinn Bid
Engineer's Estimate
Beylik Drilling, Inc.
Clark Well & Equipment Co., Inc.
tame -Western Co.,- Inc.
L
6.v Jack L. Ronsko
Public Works Director
JLR/ML/mt
cc: Purchasing Officer
Water/Wastewater Superintendent
APPROVED:
$ 85,000.00
La Habra 98,460.00
Stockton 109,850.00
Woodland 114,988.00
CWELL23.4/TXTW.02M March 15, 1989
Pro' e c t Data
O r i g i n a l ybudgeted:
1987/88
T0:
City Council
Budgeted Fund: Water Capital
Outl
Amount Budgeted: $262,000
(total
FROM:
City Manager
Total Project Estimate:
$99,700
(this
phase)
MEETING DATE:
March 22, 1989
Bid Opening Date:
3/15/89
AGENDA TITLE:
Award Contract for Well
Drilling, Well 23, 55 East Harney
Lane,
and Authorize Advertising for Bids
RECOMMENDED ACTION: That the City Council award the contract for the above
project yli ck Drilling, Inc. in the amount of $98,460.00.
BACKGROUND INFORMATION: This well site is located on Harney Lane, west of
Stockton Street and east of the Southern Pacific Rail Line. The project
consists of d ri I I i ng a production water well. The test well results have shown
that sufficient water bearing strata are present to recommend the completion of
this well to a depth of 547 feet. Most of the recent wells are between 300 and
400 feet deep. The additional depth of this well accounts for the higher
project estimate.
Additional information from the drillers indicates prices are higher due to the
drought, material costs have risen 20%over last year, and bonding and insurance
costs have increased.
Plans and specifications for this project were approved on March 1, 1989•
The City received the following three bids for this project:
Ridde I nratinn Bid
Engineer's Estimate
Beylik Drilling, Inc.
Clark Well & Equipment Co., Inc.
tame -Western Co.,- Inc.
L
6.v Jack L. Ronsko
Public Works Director
JLR/ML/mt
cc: Purchasing Officer
Water/Wastewater Superintendent
APPROVED:
$ 85,000.00
La Habra 98,460.00
Stockton 109,850.00
Woodland 114,988.00
CWELL23.4/TXTW.02M March 15, 1989
K 3OLOTiON 1`O. 89-3i
A RESOLUTION OF THE LODI CITY COUNCIL
AWARDING THE CONTRACT FOR WELL DRILLING, VVELL 23
55 EAST HARNEY LANE
WHEREAS, in answer to notice duly published 'in accordance with law and
the order of this City Council, sealed bids were received and publicly opened on
March 15, 1989 at 11:00 a.m. for the contract for Well Drilling, Well 23, 55 East
Karney Lane, described in the specifications therefor approved by the City Council on
March 1, 1989; and
WHEREAS, said bids have been compared, checked, and tabulated and a
report thereof filed with the City Manager as follows:
Bidder I nratinn Bid
Beylik Drilling, Inc.
La Habra $ 98,460.00
Clark Well & Equipment Co., Inc.
Stockton 109,850.00
Layne-Westeri. Co., Inc.
Woodland 114,988.00
WHEREAS, the City Manager recommends that award of the contract
for
Well Drilling, Well 23, be made to the low
bidder, Beylik Drilling, Inc.;
_I
NOW, THEREFORE, BE IT RE90LVEO by the City Council of the City of
Lodi
that award of contract for Well Drilling,
Well 23 be and the same is hereby awarded
to Beylik Drilling, Inc., the low bidder,
in the amount of $98,460.00.
Dated: March.22, 1989
I hereby certify that Resolution No. 89-31 was passed and adopted by the
Cte
Council .,of the City of Lodi in a regular meeting held March 22, 1989 by
_
followino, vote:
-_
Ayes: Council Members - Hinchman, Olson,
Reid, Snider and Pinkerton (Mayor)
Noes: Council Members - None
Absent: Council Members - None
Alice M. Reimche
u
City Clerk
89-31