Loading...
HomeMy WebLinkAboutAgenda Report - December 19, 1990 (62)C`v U N C I l C O M M U N I C A 1 I ON TO: THE CITY COUNCIL COUNCIL MEETING DATE: DECEMBER 19, 1990 FROM: THE CITY MANAGER'S OFFICE SUBJECT: CERTIFY THE FILING OF A NEGATIVE DECLARATION BY THE COMMUNITY DEVELOPMENT DIRECTOR AS ADEQUATE ENVIRONMENTAL DOCUMENTATION ON THE 1990-1991 CAPITAL IMPROVEMENT PROGRAM INDICATED ACTION: that the City Council consider certifying the filing of a Negative Declaration by the Community Development Director as adequate environmental documentation on the 1990-1991 Capital Improvement Program. BACKGROUND INFORMATION: Earlier this fall the Planning Commission determined that the projects listed in the 1990-1991 Capital Improvement Program were in conformance with the Lodi General Plan and recommended the plan's adoption to the City Council. The City Council adopted the Capital Improvement Plan. In the past as each project in the plan came up for final review and action by the Council, the staff would file individual environmental documents. However, a recent change in the Fish and Game Code (see discussion under Regular Calendar of this agenda) requires costly filing fees for each Negative Declaration and Environmental Impact Report beginning in January, 1991. In order to get around paying multiple fees, the staff is recommending one Negative Declaration for the entire project. If the City files the Notice of Determination before January 1, 1991, we may escape paying any fees. In future years only the filing fee for the entire project would be paid. C�Hit 3 ES B. SCHROEDER mmunity Development Director CC9033/TXTD.0IC December 10, 1990 NE "ZVE MaARA" ICN Notice is hereby given that the CitY of Lodi- Planning Department has determined that the following proposal will have no "Significant Impact on the Environinent". Supporting documentation is available in the form of a "Preliminary Environmental Assessment" and is avail- able for public review in the Planning Department Office, City Hall Building, 221 W. Pine Street. Anyone wishing to cppeal the issuance of this Declaration to the Planning Commission mEV do so no later than the date indicated as "Last date to Appeal". 4 Date Nov. 28, 1990 Project Title: Cityy of Lodi Capital Improvement Plan (CIP) 1990-91 Responsible Agency: 991it IXXXIMM"t. Contact Person: Richard C. Prima, Jr. City of Lodi Public forks Department NAME OF PERSON, FIRM, OR AGENCY UNDERTAKING PROJECT: City of Lodi Public Works Department Address : City: County: 221 W. Pine St. Lodi San Joaquin Area Code: Phone; 209 333-6706 PROJECT DESCRIPTION CF NATURE, P(JRPOS> j AND LOCATION The 1990 Capital Improvement Plan includes various storm drainage, water, wastewater and street projects that will be undertaken by the City of Lodi Public Works Department. The projects are located thrcughout Lodi and will take place on City owned land, City right-of-way or public utility easements. rolect Location City Project location County LODI SAN JOAQUIN COUNTY Last Date to Appeal: Address VVIm Preliminary Environment Assessment is Ava i 7 a b l e: December 19, 1990 LODI CITY PLANNING DEPT. 221 W. 'Pine St. , Lodi, CA 95240 Phone: (209) 334-5634 Cas of Sul COMMUNITY DEVELOPMENT DEPARTMENT ENVIRONMENTAL ASSESSMENT INITIAL STUDY 1. PROJECT TITLE 1990-91 City of Lodi Capital Improvement Plan (CIP) 2. LOCATION City of Lodi - various locations 3, PROJECT DESCRIPTION The CIP includes a listing for storm drainage, wastewater, water and street projects that are' proposed for construction by the City (See attached). 4. General Plan Designation (A) Existing (city), (B) Proposed N/A S. Site description and surrounding land use _The RX4jrg +,-are—alhated_ within the existina City limits of Lodi and are mostly located within existing public right-of-way easements or public property. 6• Zoning (A) Existing, (6) Proposed _N/A Will the Project Have a Significant Effect Through Any of the Following Impacts? Yes No Maybe 7. a. Substantial alteration of natural topography, soil or subsoil features ................................... X b. Substantially degrade surface or groundwater quality.. x C. Substantially depiete surface or groundwater resources ............................................. X CL Substantially interfere with groundwater flow or recharge ........................................... X e. Cause a significant affect related to flood, erosion or siltation .......................................... _ X f. Substantial interference with the habitat of any species of fish, wildlife or plant .................... X g. Violate ambient air quality standards or creete substantial air emissions or objectionable odors...... X h. Substantially increase ambient noise or glare level for adjoining amass ............................. X 1. Substantial reduction of existing cropland............ X j. Expose individuals or property to geologic, public health, traffic, flood. seismic or other hazards...... X Adverse impacts of project and their magnitude: During the construction period for some of these projects, there will be some disruption of traffic and possibly some increase in noise and dust. These impacts will be temporary in nature and will end once the construction i s completed. Level of impacts will be less than significant. Mitigation Measures to Reduce Adverse Impacts Identified by Initial Study: The City will require that contractors utilize all practical methods for n.oi.se nd, dust control and that the work schedule be desianed to minimize disruption of traffic. Work will be completed as quickly as possible. RECOMMENDATION _X - Negative Declaration - EIR Conditional Negative Dee 1 ara t i o n JAMES 6. SCHROEDER EnvI ronmenta1 Review Officer JJ Date EIR/1-$1 Yes No Maybe k. Have a substantial, demonstrable, negative aesthetic fit............ .................................. X . 1. Result in the disruption or alteration of an archeological, historical or paleontological site.. .. X M. Cause or allow substantial increase in consumption in any natural vnvm ............................... X n. Results in the use or waste of substantial amounts of fuel or eery ...................... .................. X o. Necessitate major extensions of water, sewer, storm drain, electrical lines or public roads.. ............ X p. Substantially increase demand for or utilization of public services such as schools or fire or police ka0bedtial........................................... X q. Substantially change transportation patterns related to existing traffic load, street capacity, parking availability or traffic safety ....................... X r. Induce substantial growth, concentration or displace- ment of population ................................... X s. Result in an alteration or conflict with existing or planned land vL ............... X t. Conflict with adopted plans, goals or policies of the City of Lodi ............... ..................... X Adverse impacts of project and their magnitude: During the construction period for some of these projects, there will be some disruption of traffic and possibly some increase in noise and dust. These impacts will be temporary in nature and will end once the construction i s completed. Level of impacts will be less than significant. Mitigation Measures to Reduce Adverse Impacts Identified by Initial Study: The City will require that contractors utilize all practical methods for n.oi.se nd, dust control and that the work schedule be desianed to minimize disruption of traffic. Work will be completed as quickly as possible. RECOMMENDATION _X - Negative Declaration - EIR Conditional Negative Dee 1 ara t i o n JAMES 6. SCHROEDER EnvI ronmenta1 Review Officer JJ Date EIR/1-$1 r City o f L octi G -Basin Developoent Capita? Improvement Program (future family golf center)' This project includes t."- expansion and development of the G -Basin according to the family golf center concept. The estimates are for Master Storm Drain improvements only. Golf course improvements are estimated Separately. The basin wiii be aeveioped in phases as shown. Excavation will be over a period of approximately 3 years with no net cost to vie City. It ii.- assumea a golf course architect will be retained to participate in the design of the final grading. landscaping and irrigation. The initial excavation proposed for FY 1990/91 only includes the area presently owned by the City. Permanent fencing with mowsirtp on the north. west and south sides and temporary fencing on the east is included. The grading will follow the golf conceptual plan developed by Richard Bigler Project Number: MSDO17 imated Costs Date of EHR Updated Cost for: Jul -90 Item amount Estimate Index ENR Index: 1711 Prelim Eng: assumed Initial Study & Negative Declaration EIR: Rights of Uay: (24 Ac ® S42.000/ac) I.008.000 Jan -30 4525 3 1,055,000 Easements : Consul :ants : (design concepts. 5.300 Jun -88 4525 $ 6.000 landscaping) Design Eng.: (reappraisal) 3.300 Jan -90 4525 S 3.000 Construction: a) Excavation. fence first phase 103.000 Jun -88 4525 S 108,000 remaining phase 79.030 Jun -88 4525 $ 83.000 b) Street Improv's 374.400 Jun -88 4525 S 392.000 cl Interior drainage 135.000 Jun -89 4593 S 139.000 d) Control/Pump Str. 117.G00 Jun -88 4525 $ 122.000 el Landscape/!rrig. 303.400 Jun -89 4593 S 828.000 Other: Total Cost: $ 2,736,000 emarks i,?sio! Engineering shown separately if anticipated to be budgeted prior °c construction; if not. t is :ncludes in construction. .oastruct,or. .ncluces _entract acninistration & in-.oection unless shown otherwise. 3/29/90 MSD017.fLS G i qty o f Lod i Orchis Drive Stoat Drain Capital Improvement Ptugram West of Sylvan Way This project includes the instal latizri of :6" and 7V storm drains and manholes west and north from the existing Z6" storm drain in Orchis Yay. Exact alignment and lengths of the storm orarns will depend on the Street layout of the area. The protect is needed to accomodate the Sunwest Plaza snooping center teing developed at the southeast corner or Kettleman Lane ana :ower Sacramento Road. yLM Amount Prelim Eng covered in Sunwest Plaza EIR EIR: Rights of Way: Easements: Consultants: Design Eng.: Construction: 60.800 Other: Proiect Number. 4SDO16 Date or ENR donated Cost for: Jut -90 Estimate Index BR I^rex: 4735 Jun -88 4525 S 64.000 Total Cost: $ 64,CO1 emarles Design Er,;neer:ng shown separately ,f antic -Dated 'o oe Cudeeted prior to construction: ,f not. ^cluded in constructi�)r. :onstraction ,ncludes contract a +r^rst rat :cn ,nscection unless Shown Otherwise. x.29.90 '!SDC15.M.S City of Lodi - Storm Drainage Capital Improvement Program Storm Drain Engineering System Model This project includes the purchase of a microcomputer and storm drainage modeling software to aid in thedesigo and planningof system expansions and analysis of existing problem areas. A numberof the o/derbasins areundersized given changes in land use that haveoccurred since their construction. They need to be analyzed usingmodern techniques which are too cumoersome to do by hand. The software will be a cammercially available package. thus noc ustom programming or data processing support will beneeded. Item Prelim Eng: Environmental: Exempt Rights of Way: N/A Easements: NIA Consultants: Design Eng.: LeadDept: Public Works Project Number: Date of ENR Updated Cost for: JUI.90 Amwnt Fstimate Index ENR Index: 4735 10.000 Jun -90 4735 Total Cost: S $10.000 emarks Design Engineering shown separately if anticipated to be budgeted prior to construction: if not. it is included in construction. Construction includes contract aeministrztior & inspection unless shown otherwise 8/29/90 10,000 City of Lodi - Streets Miscellaneous Widening Capital Improvement ftmm 1 This project covers the cost of small widening protects whi:, cannot Ina rcreseen at budget time. Usually these protects are done in conjuction with worK ny a develcper �r ;.r/oate e!t!cen. For example. if an Owner is relocating a driveway cn a street :nat will •.1ti:nately he widened, the City would pay for the replacement of the remainder of the curb. gutter ara •11ril-WA N a:vng :he frontage at the ultimate width. The City would also pay for ?he additional pavement wict!: or trat zortton :�f tho work. ?he amount budgeted is consistent with actual expenaltures :r recent. ;gars. Item, Prelim Eng: EIR: Rights of Way: Easements: Consultants: Oesign Eng.: Construction: Ogler: Amount 1 ject `w,-nner: Total Cost: $ 50,000 1 Design Eng:neersng shown separately f anticipated to be budgeted prior to construction: If not. s :ncluded in construction. Construction incluees contract administration & inspection unless shown otherwise. 5/29/90 MiSCWI DE.ALS City of Lodi - Streets Miscellaneous Curb & Gutter Capita? Improvement Program Replacements electri ion This project covers the cost of small curb & gutter projects ..n+c- cannot be foreseen at budget time. Usually these projects are done in conjuction with wont by a :eveioper or private riti:en. For example. if an owner is replacing a driveway, and the_ iotacent gutter was ti very Door condition. the City would Fay for additional curd & gutter replacement. This account is also used to fund curb & gutter replacements lone n ccnlurctlor, with other stre?t projects if additional funds are needed for the project. 4owever, pavamert maintenance es ;even priority, thus funds budgeted for curb & ;utter replacement are insufficient to wet -ie -,emand. elated Proiects 'roiect �lufrtber: stimated Costs Item Amount Prelim Eng: EIR: Rights of Way: Easements: Consultants: Design Eng.: Construction: Gther: Total Cost: $ 15,000 ,emarks Design Engineering shown separately if anticipated to be budgeted prior to construction: :f not, it is included in construction. Construction includes contract acmigistration : inspection unless shown otherwise. 6/29/90 M1SC C&G.ALS { City of Lodi - Streets Sidewalk Replacements Capital Improvement Program roiect Description t This project includes the replacement of ha:ardcus s:aewalk -�-aer tre ter -+s :,f the City's siCewalk replacement policy (attached). A complete inspection of the City's sidewalk was eerie in ;985 .ir.t ,s .:Erg -atone .n summer. 1990. Temporar; repairs are mane and eefects are prioritized by the amour.[ ,.. ;ter±•:.,: :•rs�t ;i.e., now much the sidewalk is raised'). Replacements are done in priartty order ty street .1:str•ct t_ '.n.: i,n1s ar? available. 'elated Proiects stimated Costs Item Prelim Eng: EIR: Rights of Way. Easements: Consultants: Design Enq.: Construct ion: Other: .Amount -oject Number. Tota '.9st: $ Tema rk s Design Engineering shown separately if anticipated to be budgeted prior to construction: :f lot. ,t incluced ,n construction. Construction includes contract Bamin,straticn & ,nsoecticn unless shown otherwrse. 50,000 0/29/90 SWK REPI.ALS City of Lodi - Streets Handicapped Rasp Installations Capital Improvement Program i P.-Ciect Descriptioni This projectAneludes the installation of new handicapped •xea at reeded iccations. At present there is no formai priority list of potential ? xac ons. 1!!T.4eounts tudgeted (55000) „-- is insufficient to do more than three Iccattons at rest. ?'+e. ai'at ;rt requires:reloca +on of a-.pole or catch.basin.then only one ramp can be ;:onstru:ta•t. The increased amount ($10.000) will allow a more effective-et-*.;Tt Ramps are included.in estimates for street reconstruction cr 'ec snJ :eriay projects :nvolJing curb S gutter replacement :near curb returns. Related ProJects --tect 'lumber- ttimate CostI _Itp,,,.. Amount , Prelim Eng: EIR: Rights of WW.. I Easements: Consultants: Design Eng.: Construction: Other: Total Cost: $ 10,00 ?emarks Design Engineering shown separately if anticipated to be budgeted pr•or to construction: f not. :t s included :n construction. Construction includes contract administration . inspection unless shown otherwise. 5/29/90 HC RAMPS.XLS City of Lodi - Streets yiscel laneous Traffic Operational Capital Improvement Program oject Description This project includes various minor traffic operation and caFncity ­cr:•ements such as: 1. conversion of fixed time or semi -actuated traffic sign43s :a 'k.:1' t:tuation 2. addition of protected left turn phases a existing ,zgnils 3. additional traffic detection loops to improve actuated s:gra: ;cert::,)n 4. new signing at major intersections 5. new striping/channelization at intersections stimated Costs •r. tete Prelim Eng: EIR: tights of Way: Easements: Consultants: Design En-.: Construction: Other: amount Project Humber: I Total Cost: $ 15,0001 emarks Design Engineering shown separately if anticipated to be budgeted prior to construction: it not. •s !nci.uded in construction. Construction includes contract aaninistratior. & inspection unless shown otherwise. 5/29/90 NISCTRAF.XLS 4 City of Lodi - Streets Traffic Signal Capita? laprovewnt Program Turner Rd P Stockton St Prolect Description This project includes the installation of a traffic act atea -�-ynal protected left turn phases on turner Road. The design-All provide for future aoditic^ of protecrea 1p+t t.rn phases on Stockton St/Riwok Dr. Related Proiects -o;ect *Iumter- stimated Costs Date of ENR _cdateG Cost •:r: jut-90 Item , un ti id+ x CYR '-vor: s?m Prelim Eng: EIR: Rights of Way: Easements: Consultants: Cesign Eng.: Construction: 95.000 Jun-30 6135 $ 95.000 Other: Total Cost: $ 95,000 terra rk s Design Engineering shown separately if ;nticipatea to he budgetel prior to construction; if not, :t is included in construction Construction includes contract administration : inspection unless shown otherwise. E/Z9/10 TS TURST.ALS 4 City of Lodi - Streets Traffic Signal Capital Improvewnt Program Kettlexan Ln R Hills Ave This project includes the installation of a traffi; actuater. ;;gna; .:-n aratected left turn phases on Kettleman Ln. (Hwy 12). The design will provide for suture id-I!*r:" cratected left turn phases on Hills Ave as weir as the future extension of Mills Awe. north. ;timated costs Cate :f ENR item Amount ' "' —+:de Prelim Eng: EIR: Rights of Way: Easements: Consultants: Design Eng.: Construct ion: 105.000 Jun -90 47,35 Other: --o;ect ?lumber: pdated Cost for: Jul -90 =411 'ndet• 17 S 105.000 Total Cost: S 105,000 1 Design Engineering shown separately if anticipated to be budgeted prior to construction; if not. -t s •:;cluded in construction. �'.onstruct:cn includes contract administration & inslect;on unless shown otherwise. 5/29/90 TS KETMI.XLS City of Lodi - Streets Traffic Signal Capital Improvement Progran Kettleman In @ Central Ave Protect Description This p I roject includes the installation of a traffic ictiatea si;nal ov— protected left turn phases on Kettleman Ln. (Hwy 12). The design will provide for s ignal izat — ^• 1 -!ie entrance to the KeWeeman Station shopping center. .1elated Protects '"riject Nurrber: ELt imated Cost p Cate of E4R '.:plated Cost `or: ;u1-90 I Item Amount Estimate Jr-dev --,4R !naev: im Prelim Erg: EIR: Rights of Nay: Easements: Consultants: Design Eng.: Construction 110.000 Jun -90 4735 S 110.000 Other: Total Cost: $ 110,000 emarks Design Engineering shown separately if anticipated to be budgeted .1r,or to corstruction; if not. it is 1-ic!uded in construction. Construction includes contract administration L inspectior, unless shorn otherwise. 6/29/90 TS-KETCE ALS City of Lodi - Streets A7wnd Dr Improvements Capita? I"rovement Program West City Limits to Cherokee Ln roiect Descrt:tion This protect includes an overlay of the pavement and instal iaton curb 1; gutter where none evists. Curb. gutter and sidewalk are missing irarn portions of tre south sire cr t4e street. City has the necessary Right-of-bay to install the curb 8 gutter ,ino pavement rideming and the estiirated is based on this plan. upon substantial improvement to the property, the owner wpuid be required to 4nstall sicewaik. Hater and sewer services will be installed for the future use or the remaining unimproved parcels so the street will not need to be cut. 7!ae est--ate assumes the parcel at 428/448 Almond will be ,eveioped per pians presently teing precessed. The street was designed with a reduced Structural section assuming a future veriay cue to cuts for sudsequen development. Prior to design, the street should be tested rcr the oosssoii-ty the wer+sy could ce deferred. ;elated Profectj rrolect 'lumber: Estimated c9sts Date of EMR ^:pdated Cost 'or: :u1-90 Item Amount Estimate !_nvex c!tR ^lax: i Prelim Eng: EiR: assume Negative Declaration Rights of Way: Easements_ Consultants= Design Eng.: Construction: overlay 55.000 Jun-90 4735 S 55.000 420 Almond - being installed with development at 428/448 452 Almond 7,700 Jun-90 4735 S 8.000 458 Almond 7,700 Jun-30 4735 S 8,300 Other: Total Cost: $ 71,001 ema re s Design Ergineering shown separately if anticipated to be budgeted prior to c-instruction; if not. it •s -cluced in construction. Constrict-en ,^cludes contract administration R inspection unless shown Otherwise. 5/13/90 ALM_CLCti.XLS City of Lodi - Streets Church St. Improvements Capital Improvement Program Kettleman to Al/Swain This project includes the reconstruction of the pavement -incl -nstaliation r !•andicao ramps where none exist. In addition. irop inlet catch basins and substandard laterals will he ropl_-cea. Curb. gutter and sidewalk are missing from port:ens of tna *est si,ie :• -rte street. =t the 1300 block. the City has the necessary Rignt-of-flay and has required tre •nst3113tion ry the property owners. It the 1.700 block, there are four parcels where 10 ft. is needed. it :nese !coat ,ns tno Cit, w o' icquire the Right -of -gay and then require the installation of improvements L,v *,e property --caner. The steet can re improved without the acquist ion of Right -of -Way .to t5 t^P ­":ge or the 'uture potter. An extruded curb could be ;*'aced at that location to control runott The estimate is based on a Traffic Index of 6.5 (the segment frM Kettieman tC the snooping center drivewcf at 7.0 due to truck traffic) and tested soil R -values. irn Date of ENR em Amount Estimate Index Prelim Eng: EIR: assumA Negative Declaration Rights of way: 1700 blk 35,000 Jun -90 '735 Easements: Consultants: appraisal 5.000 Jun 90 4735 Design Eng.: Construction: reconstruction 266.000 Jun -89 4593 Other: °--)Ject 4umher. Updates Cost f:r. ,:u1-90 -4R I nclex : iM 25.000 S 5,000 $ 274,000 Total Cost: $ 3I4,001 `marks Oes?gn E^gineer-9 shown separately if dnt:cipateo to be budgeted prior to construction: if not. eP 's •nc'uded in construction. Construct-= :n^ludes contract administration P. inspection unless shown otherwise. 6/29/90 CHU KESW.xlS f City of Lodi - Streets Hutchins St Widening Capital Improvement Program -Lodi Ave to Pine St This project includes reconstruction of the pavement with asonalt t3ncrete snd a new base. The widening is from Lodi Ave to Walnut St to provide a transition from 3 lines south -f Leat 'a 2 lanes north of Walnut. the Master Plan for this street calls for 3 lanes from Lcdt ave to _ccKefc1 c St. however the interim plan for this project adopted in 1952 did not include the full wlueni"'I. Preliminary engineering funds were approoriatea in ::388/89 and f -,nos are oroposed for 1989:90. The Right -of -Way acquisition will be per the gaster Plan 'i0 It, :n iicr ride f_r a tdtai width of dO ft). Prior to design of the project. alternatives an the actual cur. aitgnme".t Atli -e brought to the City Council for public review and a decision. A Master Storm Drain 'tine is alarmed to !'utCF.ins St from Wain a to Etn. ':ars 'or this tin. have been appropriated. The project has been delayed until the design for the street project is determined. +'-oject `lumber: Estimated CQStg Oate o' ENR Opdated Cost `or: „ul-90 Item Amount Estiniete Index :riL�nr..x•_ Pre)i+n Eng: already appropriated S 10.000 ETR: completed in 1982 Rights of Way: already appropriated 65.1,00 East side already acquired Consultants: Oesign Eng.: Construction: (prelim. estimate based 231.900 Dec -86 4348 on 0.3 AC/0.5 AB & 75% of curb & gutter replaced) Other: $ 252.000 1 ! Total Cost: S 252,000 1 Design Engineering shown seoarateiv anttc•oated to be budgeted prier to construction; if not. it is 'nclu,jed �n construction. Construct :on ;ncludes contract administration ; inspection unless shown otherwise. 6/29/90 HUT LOPI.XLS City of Lodi - Streets Cherokee Lane Overt ay Capita? Improvement Program Kettl'eman lane to Delores St Project Description This project consists of joint sealing. reinforcing fabric :nd in asonalt concrete overlay 10.2 ft). ?he project has been submitted for partial funding under the State -:zeal Partnership Program which has a maximum state funding level of 50%. the actual funding will likely re 30Cro.imately 15 to 20 X. If accepted by the State. the project must to awarded ey jure 30. ..lelated Proiects - aroJect Number: 8/13190 CME KEDE.XLS City of Lodi - Streets C"uh St. Overlay Capital Improvement Program Vine Street to Lodi Avenue Pro+ ri t n S This project consists of an asphalt concrete overlay with pavement reinforcement fabric The edge of the pavement at the gutter will be removed by grinding before the overlay to provide a better tie-in and reduce the cross -slope. This will ilso prevent vehicles from scraping the pavement at driveways. The estimate is cased on an assumed overlay of 0.15'. Deflection testing and determination of a Traffic I..^.de: is needed prior to design. a Due to the age and condition of the pavement. it is recommended this project not be defered more than a year. However. a traffic study needs to tie done at the Lodi Ave. intersection to determine if minor widening is s appropriate due to the heavy turning movements and lack of dedicated turn lanes. The estimate also includes 7 new handicap ramps to provide complete accessibility at the Tckay and i Chestnut intersections. Pr t Project Number: Ittimatad Costs Date of ENR Updated cost tor: Jul -90 _Item_ Amount Estimate index ENR Index- Prel in Eng: EIR: assume Negative Declaration Rights of Way: Easements: Consultants: Design Eng.: construction: Vine to Tokay 88.800 Jun -90 4735 $ 89.000 Tokay to Chestnut 87.000 Aug -90 4735 $ 87.000 Chestnut to Lodi 25.200 Jun -90 4735 $ 25.000 Cther: Total Cost: $ 201,OOLI emarks Design Engineering shown separately if antic--patee to be budgeted prior to construction; if not. it is included in construction. Construction includes contract acini nistraticn & inspection unless shown otherwise. 8/30/90 CHU_VILO.ALS City of Lodi - Streets Capital Improvement Program Hutchins Street Overlay Pine St to Lockeford St roieot Oescrioticn This project consists of.c.rack sealing, reinforcing fabric and an asphalt concrete o :rlay (0.2 ft). The estimate does not include ..any street widening; only minor curb a gutter repair is included. The project has been subiattted .fol partial framing unoer the State -LOW Partnership Program which has a maximum state funding level of 50%. The actual funding wilt 1*ke)y to 210% of Vie early protect estimate of $108,900. The project has been accepted by the State. and must be awarded by June 33. 1991. belated Prollects p-oject Number: mimat_ ed Costs ,item Prelim Eng: EIR: Rights of Way: Easements: Consultants: Design Eng.: Construction: Ocher: Date of . ENR _belated Cost for: Jul -90 Amount Estimate Index '_NR lwwOx: . •�%� 108.900 Jun -89 4593 S 112.000 Total Cost: $ 112,000 emarks Design Engineering shown separately if 3nticipated :o be budgeted prior to construction; if not. •t --icluded in construction. Constr•:c-�on !ncludes contract administration", inspection unless shown otherwise. 8/14/90 HUT PILO.XLS City of Lodi - Streets Ni 11 s Avenue Overlay Capita? Improvement Program Lodi Ave St to Elm St P_roiecL Desc;r;Qticn This project consists cf crack seating, edge 3rinding, reinforcirg ranric and to asphait concrete overlay (0.2 ft). The pro3ect hat been submitted for partial funding under tre -Dirnersnio Program wnich has a maximum state finding 'evel of FOX. the actual funding wiil to ;•i. ;, The protect `+as peen accepted by the State. and must ce awarZeo by 2 -ire RelatedProiects •ect number: imated costi Date of ENR ;lpdated Cost for: Jui•90 Item tn Estimate index -12 rt r• Prelim Eng: j, : EIR: Rights. of Yay: Easements: Consultants: 0esign Eng.: Construction: 93,640 Jun -89 4593 3 86,000 Other: Total Cost: $ 86,000 omark`: Design Engineering mown seperately it anticipated Ko be budgeted prior to construction; _* rot. it s =ncludeo to construction. Construction includes contract administration & inspection unless shown otherwise. 9/14/90 MIL LOELALS City of Lodi - Streets Pine Street Overlay Capital Implrn"wzt Prognn Hutchins St to School St This project consists of crack sealing. edge grinding, reinforcing fabric and an asphalt concrete overlay (0.2 ft). The project has been submitted for partial funding under the State -Local Partnership Program which has a maximum state funding level of 50%. The actual funding wilt likely oe .m,cn less. If accepted by the State. the project must be awarded by June 33. :992. elated Protects Project Number: stimated Costq Date of ENR Updated Cost for: Jul -90 .Item Amount ;Si'iTAfA Indax _"IR indet� Prelim Eng: EIR: Rights of Way: Easements: Consuitants: Design Eng.: Ccnstructicn: 68.200 Jun -90 4735 s 69.000 Other: Total Cost: $ 68, OW emarks Design Engineering shown separately :f anticipated to be budgeted prior to construction; if not. it is included in construction. C'onstruction includes contract administration & inspection unless shown otherwise. 7/9%90 PIN MUSC.uLS City of Lodi - Streets Sacramento St Overlay Capital Improvement Program Lockeford St St to Turner Rd Proiect Description This project consists of crack sealing. edge grinning, reirforctnq fabric and an asphalt concrete overlay (0.2 ft). In addition, the buried railroad tracks will be mioved and some curb.8 gutter will be replaced.. The project has beer submitted for partial funding under tie State -Local Pari:nersrnip Program which has a maximum state funding level of 50%. The actual funding will be apprerimately 20% of the early project estimate of 5235.300, The project has been accepted by the State. and must be awarded by lune 30. 1941. RelAted Proiects Orvject 'umber: item Prelim Eng: EIR: Rights of May: EasNnents: consultants: Design Eng.: Construction: Other: Date of ENR updated Cost for: .13i-40 Amount tstimate Index ct!R'rr!aex. 235.400 Jun -89 4593 $ 243.000 Total Cast: $ 243,000 1 eMrks Design Engineering shown separately +4 anticia�tea to be budgeted prior to construction; if not. t is ,ncluaed in construction. -_instruction incluaes contract administration °, inspection unless shown otherwise. ?!14l90 SAC LOTU.xLS 4 City of Lodi - Streets Stockton St Overlay Capita? Improvealent Program Lodi Ave to Lockeford St r41eCt OescriDtidn This project includes an asphalt concrete overlay with a pavement rein,+orcing fabric. Although the' City's Street Master Plan calls for this street to ultimately ae widened to : ?snes t5; 't. curb to eurb).-}+idening will dot be needed within the life of the overlay due to me relatively i;w :vistinq Traffic volumes. Preliminary design vx& done n spring 1950 determined the need for caro VII! ,utter WOO ceyond the sCope of the original estimate, Also the Circulation :turfy done as part of the ,enerai Flan -,poate i,v sates t"at a 3-lane facility (2 lanes plus 2-way Left turn iane) is appropriate ror Stockton St, The reccrrmended project includes the minor, widening on one side of the ,treet to acccinodate 3 lanes plus parking. The portion north of locust st. is estimates separately due to r+indinq constraints. Also this portion on the vAst side has no sidewalk. cased on pas: City practice. '.ne property ;Pners will he required to install the sidewalk, This will take time to implwiient. nlated P aroiect `umber- stimated Costs Date of ENR u+pdat.•d '.ost f,.r: ;ui-90 Item AmountEstimate Index =yR :nae•: s� PnIim Fng EIR: Rights of Slay: Consultants: Cesion Eng.: Construction: (prelim. es ima a based 59.000 Jun-8: on 0.2' AC plus fabric & 15% of curb & gutter replaced; structural section verified by 1989 testing) Lodi to Locust 215.000 Jun-89 4735 3 215.000 Locust to Lockeford 52.000 Jun-89 1735 5 52.000 Other: Total Cost: $ 267,000 emrks Design Engineering shown separately if antic-Dated to be budgeted prior to construction: if not. it is included in construction. Constriiction !nc;udes contract administration : inspection unless shown otherwise. 8/14/90 STO LOLO.XLS f t City of Lodi - Streets Stockton St Rehabilitation Capi tal IVrovement Program Tokay St to Lodi Ave .:nrt:nncrrintinn This project includes the reconstruction and possible wieen-r,; r► StocKton St. The a isting.curb to curb width is approximately 40 ft. whicr. rii! -lot allow instailaticn bf'a two-way left,,,, ; .urn; lane.`as .exists sout4 of Tokay St. ;This wrath. however. mos app -even by lie City Council, in 1932.:., The reconstruction estimate 'includes replacement of pract:ci0 y e:` rhe c:,rb and gutter due to A is poor condition.Given this. it is appropriate that the City the decision on the width.af the street. Thus, preliminary engineering is shown seoarately sa :he matter ;en be considered before a project budget is adopted. A separate estimate rcc an 4nterim cyer',iy !s ,iisc s^vwn for info -mat ion. Overlays for Stockton St. north of Lodi are also shown. crslaco:ns ci traffic volumes do not indicate a neft for immediate widening. _Also.` the present curb to caro wicth wil! allow instailatien of a two-way heftiturn lane with _relatively minor improvements. Rl�lated Proiects The 8 water main between Tokay and Lodi reeds to be lowered and upgraced to 15". 'roiect 60ober: Estimated Costs Date of ENR aPdated Cost for: Jui-90 item Amount Est;�ate Index ENR Index: 47�� Prelim Eng: S :0.000 Jun -90 4735 S 10,000 EiR: done Rights of Way: to be determined Consultants: Design Eng.: construction: Tokay to Lodi - Reconstruct 249.000 Feb -87 4348 $ 271.000 Overlay 16.000 Feb -87 4348 S 83.000 Lodi tc Lockefcrd Overlay budgeted Lockeford to Turner Overlay (0.2' AC 142.000 ltin•87 4387 S 153.000 fabric) Other: Total Cost: It 434,00(3 (gtrarks Design Ergineering srown separately if anticipated to be budgeted prior to censtr-.,coon; if not. it is :ncludea :n construction. Construction includes contract administration & inspection unless shown otherwise. 6/29/90 STO_TOLO.XLS City of Lodi - Streets OIrlay Analysis/Design Capital Improvement Program . ,oiect Description This project covers the consulting fees and testing services involved in doing preliminary designs for pavement overlays. The process begins in the Street Maintenance Division wnich conducts biennial ratings of ail the City's streets. The ratings are used in a computerised pavement miintenance management program. The program suggests various maintenance techniques for each street segment. Streets recommended for overlays 1" or thicker are handled under the Capital improvement Program. i i The thick overlay design process includes obtaining and projecting truck counts to aetemine the design loads (Traffic Index) and determining the structural value of the existing pavement. The Traffic Index is determined by City staff. The structural value is determined by a consultant using the DynafIect* nondestructive pavement testing device. This device places a 1000 lb oscillating load on the pavement, and the tavement's movement (deflection) Is measured. The results are anaiyed using a Cal Trans developed procedure. The results are then reviewed with City staff and a final recommendation is made. t Project Number: i stimated Costs Ie. AmbLLnt j Prelim Eng: EIR: Rights o f Way: Easements: Consultants: 5.000 Design Eng.: 1.000 Construction: Other: Total Cost: $ 6,000 lemark.s Design Engineering shown separately if anticipates to be budgeted prior to construction: if not. it is included in construction. Construction includes contract administration & inspection unless shown otherwise. 5/14140 OVERLDES.ALS City cf Lodi -Wastewater Capital Improvement Program MiscellaneousWastewater Lines sect oestxiotion This project consists of minorwaslewnter main extensions or replacements generally done inconjuction with a development The work may be by City forces. the developer's contractor or informal bid. Lead Dept: Public Works Prolect Number. Date at ENR UpdatedCostfor: Jul -90 Jto n. Amount Estimate Index x• im Prelim Eng: Environmental: exempt Rightsot Way: N/A Easements: N/A Consultants: Design Eng.: Construction: Total Cost. $ 10,000 aemarks Design Engineering shown separately if anticipated to be b,.sdgetsd pt, .,o construction it not. it is included in construction Construction mcludescontract administration & inspection unless shown otherwise 8/24/90 MISC_WW.XLS City of Lodi - Wastewater Oversize Wastewater Mains Capital Improvement Program This project provides funds for credits to instafts of oversize vnlstswater mains generaly dons in conpction with a devok*wfsnt. Per City ordinances. the City is responsible for the incremental cost of materials for water mains 12 and larger. Acmud was per year varywith development. The amount budgeted is a rough estimate of the amount needed based on history. Lead Dept: Public Works Oroiect Numoer: new costs Date of ENR Updated Cost for. it -.LW itemrtA mount Estim-ate Index €NR Index: :5= Prelim Eng: Environmental: exempt Flights of Way: N/A Easements: N/A Consultants: Design Eng-: Construction: Total Cost:S 5,0001 Design Engine r m g shown separately if anticipatedto be budgeted prior to construction: it not. it is included in construction Construction v rcludes conttaet administration& inspection unless shown otherwise. 8,,24,'90 ONSIZEWW.XLS City of Lodi -Wastewater MiscellaneousSystem Relocations Capital Improvement Program Proiect Description This project consists of relocating servicss necessary for WW work. it also inekides adjusting frames and covers to grade after a street project. This places the cost of such work with the appropriate utiIityas itdonewith privateutilities in Lodi and other aganctes. The amount budgeted is consistentwnh recent history although mayvary depending on the number and location of other proiects. LeadC pt: Public Works Project Number. imated Costs Oats of ENR Updated Cost for: Jul -90 hem Amount im t ;ndex EMIR Moax: 4M Prelim EW Environmental: exempt Rights of Way: N/A Easements: NA Consultants: Design Eng.: Construction: Total Cost: $ 10,000 emarks Design Engineering shown separately if anticipated to be budgeted prior to construction: if not itis includedinconstructwn Construction incluces contract acmimstration & inspection uniessshown otherwise. 8/24/90 MISRELWWALS City of Lodi - Wastewater Wastewater Service Taps Capital Improvement Program Proms Desoriotion This project consists of the installation of new services. The estimated cost is paid by the party requesting the tap. thus this account should be balanced by service tap charges. The account is established for acc unting reasons. Lead Deft: Public Works Project Number: stima"d cost Date of ENR Updated Cost for: Jul -90 item Amount Estimate Index ENA Index: 4M Prelim Eng: Environmental: exempt RightscMay: N/A Easements: N/A Consultants. Design En_%: Construction: Total Cost: $ 15.000 Ren! rk Design Engineering shown separately if anticipated to be budgeted prior tnconstruction: if not. it is included in construction. Construction includes contract administration& inspec!ion unless shown otherwise 8/24/90 WWTAP XLS City of Lodi -Wastewater Collection System Improvements Capital Improvement Program I Alley E/School 0 Oak St. This projxt consists of the installation of a new 4' line to reroute flows from the parcels east of the Post Office. The existing line is in poor condition and is tri-+uently plugs up. Replacing the existing lute in place is impractical due to the Post Office wall and parking lot. Total Cost: $ 19,000 lemarks Design Engineering shown separately if anticipated to be budgeted prior to construction: if not:. it is included in construction Construction inclucles contract administration 6 inspection unless shown otherwise. 9/ 6/ 96LLOAK.XLS Lead Dept: Public Works P►eject Nurnuer. Estimated Costs Date of ENR Updated Cost tor: .All -90 item Amount Estimate Index ENR Index am Prelim Eng: EnWn0nMental: Not exempt: assumed Initial Stuyy S Neg. Declarationlby Planning Dept.) Rights of Way: n"A Easements: N/A Consultants: Design Eng.: Construction: 19.200 Jun -90 4735 $ 19.000 Total Cost: $ 19,000 lemarks Design Engineering shown separately if anticipated to be budgeted prior to construction: if not:. it is included in construction Construction inclucles contract administration 6 inspection unless shown otherwise. 9/ 6/ 96LLOAK.XLS iM City of Loci -Wastewater Collection System Improvements Capital Improvement Program Alley NiEim, Washington to Cherokee This ptolea CORStsts of thereplacement Of 81V ~With 8 t r fnain. The existing line is in poor condition and is overloaded. In addition to serving the adjacent properties. the lute serves the oanmercial area east of Ctarokse Lane between Pine St and thoSPRR and Hwy 99. The project is proposed for FY 90/91 to accomodate new construction in the area. Partial funding by new deve!qNnent has boon approved by the City Council. Lead Dept: Public Works Froject Number: Estimated Costs Date of ENR Updated Cost for. Jul -90 Item Amount EstirnAM Index ENR„Index: im Prelim Eng: Environmental: Not exempt: assumed Initial Study!.: Nog. Declaration (by Planning Dept.) Rigttts of Way: N/A F.aserrtee>ts: N/A Consultants: Design Eng.: Construction: 186.000 Jun -90 4735 $186.000 Total Cost. $ 186.000 aemarks Design Engineering shown separately ifanticipated to be budgeted prmr to construction if not. itis included in construction Construction includes cmtractadministration& inspection unless shown otherwise 9/ii/6`0 ALLNELMALS City of Lodi -Wastewater Collection System Improvements Capital Improvement Program Poplar St. 0 Cherokee Lane proiect Description This project consists of the installation of a new to' main to replace a problem line which serves the JOZqukn St. area east of Cherokee Lane. The existing line is in poor conoition and is frequently phngs up Musing severe maintenance problems upstream. The estimate includes jacking a new pipe across Cherokee Lane. Lerd Dept: Public Works Project Number: Estimated Date of ENR Updated Cost for: Jul -90 .liet1mount ftimate Index ENS Index: i7 Prelim Eng: Environmentai: Exempt Rights of Way: N/A Easements: NIA Consultants: Design Eng.: Construction: 50.000 Jun -90 4735 $S01000 Total Cost. $ 50,000 remarks Design Engineering shown separately if anticipated to be budgeted prior to construction: it not. it is included in construction Construction includescontract administration& inspection unless shown otherwise. 8/24/90 PCPCHE9 XLS City of Lodi - Wastewater White Slough Water Pollution Control Facility Capital Improvement Program Improve Roadways Tisis onpoarg project consists of improving the pond Levee roadways with asphalt concrete to provide sit-vneather access and reduce erosion. The work 1sdone by CityStreet Division crews as time permits. ,i Y A a 4 i s E Load Dept: Public Works Proiew NuMber, Estimated Date of ENR Updated Cost for: Jul-9t) AmWnt s innate In x ENR Index 47 PrrAim Eng: Erwironmental: Exempt Rights of Way: N/A Easements: N, A Consultants: Design Eng.: Construction: Total Cost: S 5.000 emarks Design Engineering shown separately it anticipated to be budgeted prior to construction: if not. it is included in construc!ion. Construction includes contract administration & inspection unless shown otherwise. 9/6/90NS ROADS.XLS City of Lodi -Water Miscellaneous Water Mains Capital Improvement Program Date of ENR updated Cost for Jul -90 Ron Amoti t !:-Simatainft ENR Mdex: Sm Prelim Eng: Environmental: exempt Rights of Warr. N/A Easements: N/A Consultants: Design Eng-: Construction: Total Cost: $ 10.000 Design Engineering shown separatelyir anticipated to bebWQOted prior to construction: if not.. ss inchidedin construction. Construct.on includes contract administration& inspection unlessstiowr, otherwise 8124;90 MISC WM.XLS City of Lodi - Water Capital improvement Program OversizeWater Mains Consultants: Deso Eng.: construction: Total Cost: S 20.000 Design Engineering shown separately it anticipated to be budgeted prior to construction: it not. it is included in construction. Construction includes contract administration& inspection unless shown otherwise. 8/24.90 OVSQEWM.XLS City of Lodi -Water MiscellaneousSystem Relocations Capital improvement Program Proiect Description This project consists of relocating fire hydrants and services necessary for street or other gravity utilities. It also includes adjusting frarnes and covers to grade atter a street project. This places the cost of such work with the appropriate utility as is done with private utilities in Lodi and other agencies. The amount budgeted is Consistent with recent history although may vary depending on tho number and location of other projects. Prelim Eng: Environ'nental: exempt Rights of Way: NIA Easements- N/A Consultants: Design Eng.: Construction: Lead Dept: Public Works .t Number: Date of FENR Updated Cost for: Jul -90 Amount Estimate W4ex ENR Index: 47 Total Cost. $ 40.000 lemarks Design Engineering shown separately if anticipated to be budgeted prior to construction: if not. it is includedin ccostruct ton Construction intrudes contract administration & inspection unless si-.own otherwise 8124/90 MISRELOW.XLS City of Lodi -Water . Lead Service Replacements Capital Improvement Program fsroiect Desmation This project consists of locating and replacing ser iw lines made of lead pipe. ead Deot: Public Works Proje^t Number. Fes:. +'twrlCosta Date of ENR Updated Cost for: Jui•90 kem Arrxx" Estimate Index. ENR Index: 4m Prelim Eng: Environmental: exempt Rights of Way: N/A Easements: NIA Consultants: Design Eng.: Construction: Total Coat: $ 15,000 lemarks Design Engineering shown separately it anticipated Lobe budgeted prior to construction: if not. it is included in construction. Construction includes contract administration& inspection unless shown otherwise 3/24/90 LEADSERVALS u'Z10Sixdyiei3ivn o6 es!Mjaglo uA"s ssolun uouoedsu! •p uoilejisju!wpe loejluoo sapnpui uo!lonasuco •uo!lonjlsuoo u! papnlou! 21 1! 'lou;! :uo!lonjisuoo of joud paiaBpnq aq o3 poisdlo!iue it Alaleleclas um-ous 6uuaaw5u3 u61SOO 000'0£ $ :Isoo 18101 :Wponasuoo :'BU9 u61290 sluelinsuo'J VIN xluawasa3 VJN AIM P sWOM ldwaxa :lalwwua!Au3 :U3 u+!!aJd Lb :xaplq �Y WFUT —51-m-l-sm _40—row 06-Inr .j% Isco PalYpdn kwNs ;o old ;ioaulnN R s4,oM o!Ignd :uao peal •suosm &Awnoxe J% PWS!lgaisa $! w»o*= aql •se5wp dad aapuas dq pa:wwalag ag parous luno*oa sull sagl dal rm Owmnba+ Aliad ma Aq p!ad s! a= polum sa stu •ssrl ns Mau jo umlel"m aye /o sis!suoo uloid s!yl weJ6oJd luawsAoJdwl {ez!deo sdel a,OinJaS JaleM jalem - ipo-1 jo filo iill•...•1 M....li •.11'.1 Design es 6-4-: I Total Cost: $ 15.000 Design Engineering shown separately if anticipated to be budgeted prior toconstruction: ifnot. if is included in construction. Construction includes contract administration & inspection unless shown otherwise. 8/24/80 DISTSYIM.XIS Consultants: Design Eng.: Construction: 110.000 Jun -90 4735 $110.000 Total Cost.$ 110100( lemarks Design Engineering shown separately if anticipatedto be budgetedprior to construction: ff not. it is included in construction. Construction includes contract administration & inspectionunless shown otherwise. c Date of = ENR- = Updated Cost for. JuM kern Arng= t t2 ENR kldeX 47 Prelim Eng: Environmental: exempt Rights of Way: N/A Easernentr. N/A Consultants: Design Eng.= rmstnrtion: 13.000 Jun -90 473! $13.000 Total Cost: $ 13,000 IbMarkS Design Engineering shown separately if anticipated to be budgeted prior toconstructim it not. it is included in Construction. Construction includes contract administration& inspection unless shown otherwise. 8/24/90 SACWMLOD.XLS Ltimated Data of ENR Updated Cost for: Jut -90 ft . Amount Estimate Index ENA Index: ii Prelim Erg Environmental: assumed exempt Rights of Way: N/A Easements: N/A Consultants: Design Eng.: City statf & inspection Construction: (preliminary, rough estimate) 56.000 Jun -90 4735 2% 10.000 Jun -90 4735 500.000 Jun•90 4735 S661000 S101000 $500.000 Total Cost: $ 566.000 lemarks Dasrgn Engineering shown separately if anticipated 3obe budgeted prior toconstruotion: if not. it is included in construction. Construction includes contract administration& inspection unless shown otherwise 8/24/90 SBGEN XLS n— i Consultants: Architect for Well 3R 10.000 Jun -90 4735 $10,000 Design Eng-: Construction: Well 3R 376.W0 Jun -90 4735 $ 376,000 Well 11R 308.000 Jun -90 4735 $308.000 Well 24 295;000 ,1m-90 4735 $235.000 woe 11S ian nm im.an 4735 $ 280.000 Total Cost: $ 1,269,00( Design Engineering shovm separatelyifanucipateo to be budgeted prior to construction: if not its included In construction. Construction includes contract administration & inspection uniessshownotherwise 9/6/90W ELLS.XLS Preimn Eng: ' Environmental: assurned exempt Rights of Way: N/A Easements: N/A Consultants: first unit Design Eng.: Consiruction: first unit remainingunits. including design 50.000 Jun -90 4735 46(3,000 Jun -90 4735 5.119,400 Jun -90 4735 $50,000 $465.000 1 $ 5.119,000 Total Cost: $ 5,635,00( Gema -hs Design Engineering snown separately ifanticipatedto beWdgeted prior to construction: if not. it isinciuded in construction. Constructionincludes contract administration & inspection unless shown otherwise. 8/24/90 DBCPCIP.XIS .; onsuitants: Desert Eng.: Constrtictiot: 55,000 Jun -90 4735 Total Cost: $ lemerks Design Engineering shown separately if anticipated to be budgeted prior to c onstruction: if not. it is included in construction. Construction includescontract administration & inspection unless shown otherwise 8/24/90 55,00( City of Lodi - Water Miscellaneous Projects/Studies r Capital Improvement Program Water Tank DemWition This project incl des the removal of the old water tank. �s} This taerlt was constructed inapproximately 1910 and was replaced with a new tank in tti89., F z The dernoiition was delayed until the new tank passed its cr ieleer warranty sction. - The work Irides demolition of the,okt pili and some aojacent dilapidated stomps build' ty`s in WOW* provide room to the tank removal,, :.. _ The removal of the old fire house near the tank is not.'inckKW Inthiswork. = E, J t: Lead Dept: Public Woacs Project Number. i. : Date of ENR t)pdated Cost for Jul -9C h�rt� t- FAIMM ind" ENRI^ X'. 4i Prs!«it Eng: Environmental: completed with-jr removal of other Parks & Recreation storage buildings Rights of Way- N/A Easements: N; A .; onsuitants: Desert Eng.: Constrtictiot: 55,000 Jun -90 4735 Total Cost: $ lemerks Design Engineering shown separately if anticipated to be budgeted prior to c onstruction: if not. it is included in construction. Construction includescontract administration & inspection unless shown otherwise 8/24/90 55,00(