Loading...
HomeMy WebLinkAboutAgenda Report - December 15, 2010 C-06AGENDA ITEM 61F10 &%, CITY OF LODI COUNCIL COMMUNICATION AGENDA TITLE: Adopt Resolution Accepting Improvements Under Contractfor 2010 Street Improvements Project and Appropriating Funds ($100,000) MEETING DATE: December 15,2 0 10 PREPARED BY: PublicWorks Director RECOMMENDED ACTION: Adopt resolution accepting improvements under contract for 2010 Street Improvements Project and appropriating funds in the amount Of $100,000. BACKGROUND INFORMATION: The project was awarded to Granite Construction Company, of Stockton, on May 19,2010, in the amount of $886,885. The contract has been completed in substantial conformancewith the plans and specifications approved by City Council on November4, 2009. This project consisted of street improvements on Ham Lane and Vine Street, including new ADA accessible ramps at every intersection and overlay and striping of Ham Lane between Kettleman Lane and Century Boulevard and Vine Street between FairmontAvenue and Mills Avenue. During construction it was discovered that the existing roadway subgrade on Ham Lane between Century Boulevard and Brandywine Drive required cement treatment to stabilize the area prior to paving. A geotechnical engineerfrorn Neil 0. Anderson & Associates was retained as part of this work to provide direction on the best means and methods to resolve the subgrade issue. There were two change orders for this project, one which included cement treatment of the roadway subgrade adjacent to Tokay High School to stabilize the roadway ($72,075, 32) and the second for increases in the base contract work quantities for asphalt paving, removal and replacement of concrete sidewalk, curb, gutter and sign posts ($98,596,50), for a total cost of $170,671.82. The total final contract amount is $1,057,556.82. The requested appropriation is to fund the change order costs, additional testing and inspection services performed by Neil 0. Anderson & Associates ($6,514.00), and project costs (City staff, printing, bidding, materials, etc.) not covered by the original appropriation of $1,064,262. Following acceptance by the City Council, as required by law, the City Engineerwill file a Notice of Completion with the County Recorder's office. The notice serves to notify vendors and subcontractors that the project is complete and begins their 30 -day period to file a stop notice requiring the City to withhold payments from the prime contractor in the event of a payment dispute. FISCAL IMPACT: The projectwill reduce the maintenance costs in the project areas. FUNDING AVAILABLE: Requested Appropriation: d: $100,000 A-X4z�--� J-65-r-d—ar�Ayers Deputy City Manager/Interna rvices Director -41 fl &11 - AA� F.'Wallv- S661(il—in- - PublicWorks Director Prepared by GaryWiman, Construction Project Manager FWSIGW/pmf APPROVED: kon'radt Bartlam, City Manager K:\WP\PROJECTS\STREETS�201OStreetlmprovements\CAccept 2010 Street Improvements Project.doc 12f71201 0 RESOLUTION NO. 2010-211 A RESOLUTION OF THE LODI CITY COUNCIL ACCEPTING IMPROVEMENTS UNDER CONTRACT FOR 2010 STREET IMPROVEMENTS PROJECT AND FURTHER APPROPRIATING ADDITIONAL FUNDS FOR THE PROJECT WHEREAS, the project was awarded to Granite Construction Company, of Stockton, on May 19, 2010, in the amount of $886,885; and WHEREAS, the contract has been completed in substantial conformance with the plans and specifications approved by City Council on November4,2009; and WHEREAS, this project consisted of street improvements on Ham Lane and Vine Street, including new Americans with Disabilities Act accessible ramps at every intersection and overlay and striping of Ham Lane between Kettleman Lane and Century Boulevard and Vine Street between FairmontAvenue and Mills Avenue; and WHEREAS, there were two change orders for this project, one which included cement treatment of the roadway subgrade adjacent to Tokay High School to stabilize the roadway ($72,075.32) and the second for increases in the base contract work quantities for asphalt paving, removal, and replacement of concrete sidewalk, curb, gutter, and sign posts ($98,596.50); and WHEREAS, staff recommends appropriation from the Proposition 1B fund to cover change order costs and additional testing and inspection services not covered by project contingencies. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby accept the improvements under the contract for the 2010 Street Improvements Project and directs the City Engineerto file a Notice cf Completion with the County Recorder's Office; and BE IT FURTHER RESOLVED that additional funds in the amount of $100,000 be appropriated from the Proposition 1 B Fund for this project. Dated: December 15, 2010 I hereby certify that Resolution No. 2010-211 was passed and adopted by the City Council of the City of Lodi in a regular meeting held December 15, 2010, by the following vote: AYES: COUNCIL MEMBERS — Hansen, Mounce, Nakanishi, and Mayor Johnson NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — Katzakian ABSTAIN: COUNCIL MEMBERS— None 07H L City Clerk 2010-211