Loading...
HomeMy WebLinkAboutAgenda Report - December 15, 2010 C-050 AGENDA ITEM (:OOC-) &%- CITY OF LODI COUNCIL COMMUNICATION TM AGENDA TITLE: Adopt Resolution Accepting Improvements Under Contract for Lodi GrapeLine Bus Stop Improvements— Various Locations and Appropriating Funds ($12,052) MEETING DATE: December 15,2010 PREPARED BY: PublicWorks Director RECOMMENDED ACTION: Adopt resolution acceptingthe improvements under contract for Lodi GrapeLine bus stop improvements —various locations and appropriating funds in the amount of $12,052. BACKGROUND INFORMATION: The contract for this project was awarded to Mo/Jas Construction, of Stockton, on April 7, 2010, in the amount of $35,314. This project consisted of constructing improvementsto 20 bus stop locations on Lodi's fixed -route bus system. Six bus shelters were installed, 11 bus stop locations received new benches, and three bus stop locations were modified to increase the pedestrian path of travel. The final contract price was $62,052. The difference between the contract amount and the final contract price was due to two contract change orders which revised the scope of work. These two contract change orders added $26,738.50 to the contract. Of this total change order amount, $12,380.50 was caused by a revised design for the bus stop at the northeast corner of Hutchins Street and Century Boulevard. Per the recommendation of the transit company, the bus stop location was moved further north, away from Century Boulevard. This new location increased the length of the access walkway, required the removal of a tree, and added a handrail along the edge of the access path. In addition, Mo/Jas Construction performed additional asphalt concrete repairwork on the Hutchins Streetfrontage road. Of the remaining $14,358 in change order work, $5,983 was spent on additional bus stop improvements that were not included in the original contract. This work included the relocation of two benches, the installation of six solar batteries to power the bus shelter lighting, and the installation of bus stop informational signs on three neW bus shelters. The balance of the contract change order work ($8,375) was due to additional concrete flatwork and curbing to address grade and maintenance issues, and a remobilization cost due to a bus shelter that needed repair work before the installation could proceed. As part of the contract award for this project, Council approved an appropriation of $50,000. Staff is now requesting an additional appropriation of $12,052 to cover the contract change order work. Following acceptance by the City Council, as required by law, the City Engineerwill file a Notice of Completion with the County Recorder's office. The notice serves to notify vendors and subcontractors that the project is complete and begins their 30 -day period to file a stop notice requiring the City to withhold payments from the prime contractor in the event of a payment dispute. APPROVED: Konradt Bartlam, City Manager KAWP\PR0JECTS\TRANS1T\Bus stop improvements\campt.doc 12/06/2010 Adopt Resolution Accepting Improvements Under Contractfor Lodi GrapeLine Bus Stop Improvements— Various Locations and Appropriating Funds ($12,052) December 15, 2010 Page 2 FISCAL IMPACT: FUNDING AVAILABLE: There will be a slight increase in the long-term maintenance costs associated with the installation of these new improvements. Requested Appropriation: Transportation DevelopmentAct Fund (125080) Jorda"yers Deputy City Manager/internal Services Director F. Wally Sand�Nin PublicWorks Director Prepared by Wesley Fujitani, Senior Civil Engineer FWSMKF/pmf cc: City Attorney Transportation Manager $12,052.50 K:\WP\PROJECTS\TRANSIT\Bus stop improvements\caccpt.doc 12/02/2010 RESOLUTION NO. 2010-221 A RESOLUTION OF THE LODI CITY COUNCIL ACCEPTING IMPROVEMENTS UNDER CONTRACT FOR LODI GRAPELINE BUS STOP IMPROVEMENTS — VARIOUS LOCATIONS AND FURTHER APPROPRIATING ADDITIONAL FUNDS WHEREAS, the project was awarded to Mo/Jas Construction, of Stockton, on April 7, 2010, in the amount of $35,314 and has been completed in substantial conformance with the plans and specifications approved by City Council on February 3, 2010; and WHEREAS, this project consisted of construction improvementsto 20 bus stop locations on Lodi's fixed -route bus system with 6 bus shelters being installed, 11 bus stop locations receiving new benches, and 3 bus stop locations being modified to increase the pedestrian path of travel; and WHEREAS, additional funds are needed to pay for two contract change orders, which included modifications to two additional bus stop locations, additional concrete flatwork and curbing, installation of solar batteries on six bus shelters, new railings, and additional asphalt work. NOW, THEREFORE' BE IT RESOLVED that the Lodi City Council does hereby accept the improvements under the contract for the Lodi GrapeLine Bus Stop Improvements — Various Locations and directs the City Engineer to file a Notice of Completion with the County Recorder's Office; and BE IT FURTHER RESOLVED that additional funds in the amount of $12,052 be appropriated from the Transportation Development Act Fund for this project. Dated: December 15,2010 I hereby certify that Resolution No. 2010-221 was passed and adopted by the City Council of the City of Lodi in a regular meeting held December 15, 2010, by the following vote: AYES: COUNCIL MEMBERS — Hansen, Mounce, Nakanishi, and MayorJohnson NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — Katzakian ABSTAIN: COUNCIL MEMBERS— None iDI �JOHL City Clerk 2010-221