HomeMy WebLinkAboutAgenda Report - December 3, 1992' Of
CITY OF LODI
COUNCIL COMMUNICATION
AGENDA TITLE: Specifications and Advertisement for Bids for
Construction of Berms and Transformer Pad (EUD 92-9)
MEETING DATE: December 3, 1992
SUBMITTED BY: Electric Utility Director
RECOMMENDED ACTION: That the City Council approve the specifications and
authorize advertisement for bids for the construction of
oil containment berms and transformer pad.
BACKGROUND INFORMATION: The oil containment structures will be installed at
McLane Substation around oil -filled electrical equipment
to confine an oil spill or leak. Environmental
Protection Agency regulations require that equipment
storing oil in volumes, as in this case, be equipped with a confinement system that
will prevent an oil spill or leak to extend beyond the immediate area of the
equipment and not migrate into the soil, the water table or the site drainage
system.
The transformer pad is being constructed to accommodate the transformer hank
replacement at McLane Substation.
The bid opening date has been set for Tuesday, December 22, 1992.
FUNDING: The estimated cost of this improvement, $45,000, is
included in the Department's 1992-93 fiscal year budget,
Henry J. Rice
Electric Utility Director
Prepared by: Mel Grandi, Electrical Engineer
c: Assist. Electrical Utility Director
Electric System Supervisor
Purchasing Officer
APPROVED
THOMAS A PETERSON rc . a nine