HomeMy WebLinkAboutAgenda Report - November 18, 1992 (65)F .� OF CITY OF L.ODI COUNCIL COMMUNICATION o� d Consideration ot an agreement between City and owners of— property south of Harney Lane which would indemnify City against losses incurred in defending Council's decision to allow oversize sewer line. MEETING DATE: November 18, 1992 PREPARED BY: City Attorney RECOMMENDED ACTION: Council consideration and possible approval of the attached draft agreement. BACKGROUND: This matter involves the offer by owners of property south of Harney Lane (identified in the attached draft agreement) to pay for oversizing of a sewer line which could ultimately serve their properties. An 8" sewer line is presently proposed for installation in conjunction with the Century Meadows project. The property owners have proposed increasing the line to 24" in order to provide capacity for their property when it develops at some future date. At the October 21, 1992 meeting, the City Council directed staff to bring back an agreement between the property owners and the City to accomplish this, and to prepare appropriate environmental clearances. The negative declaration will be coming back to the Council for possible certification at the December 26, 1992 meeting. The attached agreement reflects the previous discussions and agreements between the parties. Under this document, the property owners agree to do the following: 1. Pay directly to the Century Meadows developers all costs of oversizing the line; 2. Pay all costs to the City for engineering and other applicable fees for the oversizing project; 3. Pay all costs of oversizing the lift station, force main and collector lines at the time of construction, including any necessary redesign costs; 4. Defend and indemnify the City from any legal challenge to the oversizing project; 5. Dedicate all necessary easements for Harney Lane widening from Mills Avenue to the Southern Pacific Railroad right-of-way; 6. Dedicate the lift station site and associated easements. N APPROVED: to at THOMAS A. PETERSON wycl paper City Manager SEWERCC/TXTA.01V a AGENDA TITLE: Ag—ement for oversizing of sewer 1—e south of Harney Lane (Kjeldsen-Sinnock Report) MEETING DATE: November 18, 1992 PAGE TWO In consideration, the City will consent to the size increase, and further agrees to consider a request at some future date for reimbursement of a portion of the cost. However, the City does not obligate itself by this agreement to approve such request. The legal description for the easements and the lift station site are now being prepared and will, if Council approves, be attached to the executed agreement. FUNDING: To be determined. Respectfully submitted, Bob McNatt City Attorney BM/vc attachment - Note: Exhibit A, the vjeldsen-Sinnock Study, is not included herein. Ddlibits C and D, the easement descriptions, will follow. cc: Community Development Director Assistant City Engineer SEWERCC/TXTA.oly AGREEMENT THIS AGREEMENT, is made this day of November, 1992 by and between MARIAN M. FRY, FELIX COSTA, CARL FINK, VERA PERRIN, WILLIAM BECKMAN and CHARLES BECKMAN (hereinafter collectively referred to as "Owners") and the CITY OF LODI, a political subdivision of the State of California (hereinafter referred to as "City"). WITNESSETH: °., WHEREAS, Owns have submitted to City a South Lodi Sanitary Sewer Study of the Harney Lie Lift Station Area (hereinafter referred to as "Study"), prepared by Kjeldsen-Sinnock & Associates, Inc., Civil Engineers (Exhibit A). The Study evaluated the f ;ibility of extending the Harney Lane Lift Station Service Area to serve the area south of Harney Lane; WHEREAS, the Lodi City Council, relying on the accuracy of the Study has accepted the technical recommendations of the Study and the City staff report presented at the City Council meeting of October 21, 1992; NOW, THEREFORE, in consideration of the mutual promises contained herein, the parties agree as follows: 1. Owners shall pay the following: (a) Costs of design and oversizing of a twenty-four inch (24") sewer main within the limits of the Century Meadows Subdivision, as set forth in Alternative 4 of the Study identified above, in amounts to be agreed-upon with and paid directly to the Century Meadows developers. (b) Costs of preparing plans to City specifications for the above and payment of apT-ropriate engineering and other fees in accordance with City of Lodi written policies and requirements. .I- (c) �-Osts of oversizing the lift station, force main, and collector lines entering the lift station, as identified in Exhibit B hereto. payable at the time of approval of construction plans. It is understood that the present cost estimate of oversizing the lift station and force main is approximately One Hundred Ten Thousand Dollars ($110,000). and the cost of oversizing the collector lines entering the lift station is approximately Sixty Thousand Dollars 1560,0001, per Exhibit B. (d) Cost to modify the lift station as needed to later serve the area south of Harney Lane at the time of development. 2. Owners will indemnify, defend and hold harmless from and against any and all liability or actions accruing as a result of the City's decision to install such oversized facilities as referred to above, where such action or proceeding arises out of the City's approval of a negative declaration for said facilities. 3. owners shall, upon execution of this agreement, dedicate to City: (a) The lift station site and adjacent construction easement on the south side of Harney Lane, east of Mills Avenue, more particularly described in Exhibit C hereto. (b) Street right-of-way and construction easement on the south side of Harney Lane from Mills Avenue to the southern Pacific Railroad right-of-way, more particularly described in Exhibit D hereto. (c) Omwm acknowledge that such dedication is necessary concurrently with execution of this agreement since construction of the facilities must occur before development south of Harney Lane in order to serve areas north of Harney Lane which at present have priority under the City's Growth Management Plan. 4. Ownu.s may, at an appropriate future date, apply to City for a reimbursement agreement in accordance with Lodi Municipal Code Chapter .2- 1.6.40, but noth_-.g herein shall be deemed to ob—gate the City to approve such reimbursement agreement. S. owners acknowledge that because of engineering concerns arising from such oversizing, the trunk sewer line in Harney Lane will require special construction due to its depth and that the number and location of fr..ture connections will be limited. Special manholes and/or parallel lines m:.y be needed to serve adjacent property. IN WITNESS WHEREOF, the parties hereto have set their hands the day and year first hereinabove mentioned. "CITY" "OWNERS" CITY OF LODI, a political subdivision of the State of California THOMAS A. PETERSON City Manager ATTEST: ALICE M. REIMCHE City Clerk Approved As To Form: BOBBY W. MCNATT City Attorney MARIAN M. FRY FELIX COSTA CARL FINK VERA PERRIN WILLIAM BECKMAN CHARLES BECKMAN .3- Exhibit B South Lodi Sanitary Sewer Analysis Notes: 1 Costs per Nalla Development Impact Fee Study. ENR updated to July 1992 2 Costs per Kieldsen•Sinnock Study. July 1992 3 First phase of lift station estimated by City at 90% of total cost 4 Ex. Master Plan & Alt. 1 assumed to be equivalent at average cost of $351,000, FINK SS.XIS Existing Master Plan South Lodi Sanitary Alt. 1 Alt. 2 Sewer StudyI Alt. 3 Alt. 4 Phased Construction Alt 4-1 Alt. 4-2 Area served: 292 acres 244 acres 546 acres 244 acres 302 acres North of North of Harney Ln. North of Harney Ln. North of South of Harney Ln. (Alt. 1&2) plus 302 Harney Ln. Harney Ln. acres south of Harney Lift Sta. Location: Lower Sac. Lower Sac. Mills Ave. I Lower Sac. Mills Ave. Mills Ave. @Harney N/Harney @ Harney @ `Harney @ Harney @ Harney Lift Sta. Cost: $280,000 $285,000 $298,000 $478,000 $433,000 $390,OOC $43,0003 Oversize Main Cost: $67,000 $70,000 $92,000 $227,000 $211,000 $127,000 $84,0002 Total Cost: $347,0001 $355,000 $390,000 $705,000 $644,000 2 $517,000 $127,000 Cost above Ex. Plan/Alt. 1 4 to develop area north $39,000 $166,000 Harney: Cost per acre: $1,200 $1,500 $1,600 $1,30 $1,200 $2,100 $400 Notes: 1 Costs per Nalla Development Impact Fee Study. ENR updated to July 1992 2 Costs per Kieldsen•Sinnock Study. July 1992 3 First phase of lift station estimated by City at 90% of total cost 4 Ex. Master Plan & Alt. 1 assumed to be equivalent at average cost of $351,000, FINK SS.XIS