HomeMy WebLinkAboutAgenda Report - November 17, 2010 D-10AGENDA ITEM bak'%o CITY OF LODI COUNCIL COMMUNICATION Im AGENDA TITLE: Adopt Resolution Appropriating Additional Fundsfor Contract Change Order No.4 for Lodi Grape Bowl All -Weather Surface Project ($12,061.56) MEETING DATE: November 17,2010 PREPARED BY: Public Works Director RECOMMENDED ACTION: Adopt resolution appropriating additional funds for Contract Change Order No. 4 for Lodi Grape Bowl All -Weather Surface Project ($12,061.56). BACKGROUND INFORMATION: City Council at its meeting of April 7, 2010 awarded a contract to Western Engineering Contractors, Inc., in the amount of $592,675 for field preparation and awarded a contract to Fieldturf USA, Inc., for the purchase and installation of the field. On August 4, 2010, Council approved an additional appropriation of $156,577.80 to cover Contract Change Order Nos. 1, 2 and 3. These change orders were issued to cover various field changes and the installation of steps and ramps that would conform to the requirements of the Americans with DisabilitiesAct. Contract Change Order No. 4 addresses changes made to the design of the steps and ramps, additional work performed to relocate the storm drain retention chambers, a premium to speed the delivery of the railings, and deducts to the contract to help offset these added costs. The steps and ramps were widened to meet Building Code exit requirements and guardrails were needed on the steps instead of handrails. The changed dimensions added $13,883.68 to the contract, and the change of the handrails to guardrails increased the cost by $3,270.75. The storm drain retention chamber was relocated as part of Contract Change Order No. 1, but the contractor also needed to perform an additional $10,434 worth of force main work due to the storm drain relocation. Contract Change Order No. 4 also added $2,079 to cover premium costs so that the project would be completed by November 12,2010. In order help offset the added costs, fence work added in Contract Change Order No. 1 has been deleted (-$9,350), the 7 -foot sidewalk added in Contract Change Order No. 1 has been narrowed to a 6 -foot sidewalk (-$3,962.67), a concrete mow band underthe booster pump fence was deleted (-$867.20) and completion of the aggregate base grading work will be performed by the Parks Department (43,426). The net result of Contract Change Order No. 4 is an increase of $12,061.56. Staff is therefore recommending the appropriation of $12,061.56 from the Parks Impact Mitigation Fees Fund to cover this contract change order cost. FISCAL IMPACT: There will be reduced maintenance cost of the areas surrounding the all- weather surface and reduced exposure to ADA -access claims at the Grape Bowl facility. Use of impact fees will reduce funds available for future parks. F APPROVED: Konra Bartlam, Interim City Manager K:\WPIPROJECTS\PARKS1GrapeBowlWll Weather Surface\C_CC04.doc 11/8/2010 Adopt Resolution Appropriating Additional Funds for Contract Change Order No. 4 for Lodi Grape Bowl All -Weather Surface Project ($12,061.56) November 17,2010 Page 2 FUNDING AVAILABLE: Requested Appropriation: Parks Impact Mitigation Fees (1217005): $12,061.56 ordan Ayers y Deputy City Manager/Internal Services Director James M. Rode -mi' Interim Parks and Recreation Director Prepared by Wesley K. Fujitani, Senior Civil Engineer FWSMKF/pmf cc: City Attorney Parks Superintendent Management Analyst Areida-Yadav �Df F. Wally Sandelin Public Works Director K:\WP\PROJECTS\PARKS\G rape BoOAll Weather Surface\C CC04.doc 11/2/2010 RESOLUTION NO. 2010-191 A RESOLUTION OF THE LODI CITY COUNCIL AUTHORIZING APPROPRIATION OF FUNDS FOR CONTRACT CHANGE ORDER NO.4 FOR GRAPE BOWL ALL-WEATHER SURFACE PROJECT . WHEREAS, on April 7, 2010, City Council awarded a contract to Western Engineering Contractors, Inc., in the amount of $592,675 for field preparation and awarded a contract to Fieldturf USA, Inc., for the purchase and installation of the field. On August 4, 2010, City Council approved an additional appropriation of $156,577.80 to cover Contract Change Orders No. 1, 2, and 3, which were issued to cover various field changes and the installation of steps and ramps that would conform to the requirements of the Americans with DisabilitiesAct; and WHEREAS, Contract Change Order No. 4 addresses changes made to the design of the steps and ramps, additional work performed to relocate the storm drain retention chambers, a premium to speed the delivery of the railings, and deducts to the contract to help offset these added costs; and WHEREAS, staff recommends appropriating $12,061.56 from the Parks Impact Fee Fund to cover the cost of the change orders. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby authorize appropriation of $12,061.56 from the Parks Impact Mitigation Fee Fund for this project. Dated: November 17, 2010 I hereby certify that Resolution No. 2010-191 was passed and adopted by the City Council of the City of Lodi in a regular meeting held November 17, 2010, by the following vote: AYES: COUNCIL MEMBERS — Hansen, Hitchcock, Johnson, Mounce, and Mayor Katzakian NOES: COUNCIL MEMBERS —None ABSENT: COUNCIL MEMBERS — None ABSTAIN: COUNCIL MEMBERS— None 2010-191