Loading...
HomeMy WebLinkAboutAgenda Report - November 17, 2010 D-09AGENDA ITEM CITY OF LODI COUNCIL COMMUNICATION .im AGENDA TITLE: Adopt Resolution Appropriating Fundsfor Contract Change Ordersfor DeBenedetti Park (G -Basin) Storm Drain Improvements Project ($150,000) MEETING DATE: November 17,2010 PREPARED BY: Public Works Director RECOMMENDED ACTION: Adopt a resolution appropriating funds for contract change orders for DeBenedetti Park (G -Basin) Storm Drain Improvements Project in the amount of $150,000. BACKGROUND INFORMATION: This project consists of installing approximately 870 lineal feet of 72 -inch storm drain pipe, 42 lineal feet of 42 -inch storm drain pipe, one weir structure and three outfall structures. This projectwas awarded to Teichert Construction, of Stockton, on October 7, 2009. This project is the first stage of multiple storm drainage and parks projects at DeBenedetti Park. It is necessaryfor this project work to be completed prior to the other projects being started, which required the work to continue during the rainy season. Last winter's above -normal rainfall had a major impact on the project, due to the nature of the project and the time when it was required to be performed. The contractor had to continuously reroute and pump storm water flows to continue with the contract work. It was also necessary to pump down the basin so that the other park contract work (irrigation and planting) could be performed. It was necessary to construct a temporary dam within the basin in an attempt to keep the work area dry enough for projectwork to continue. All extra work was tracked on a time -and -materials basis. Change Order No. 1 is for costs related to the construction of a coffer dam in G -Basin to permit work to begin on the 72 -inch storm drain ($24,313.54). Change Order No. 2 includes lowering the elevation of the 72 -inch line by two feet ($26,819.00), removal of the temporary coffer dam ($23,986.92), purchase of 60 -inch reinforced concrete pipe for tie-in at Century Boulevardto ease impact on traffic ($5,007.02), increase in material escalation costs for metal rebar ($1,959.85) and other work related to the control of storm water during the project ($61,778.40). The total for Change Order No. 2 is $119,551.19. The project is 99 percent complete. FISCAL IMPACT: There will be a slight increase in the long-term storm drain maintenance of the proposed facilities. FUNDING AVAILABLE: Requeste�,,Appropriation: Storm Drain Impact Fee (326017) — $150,000 ln.ti„ 4n Ayers Deputy City Manager/Internal S ice Director F. Wally Seaddlin PublicWorks Director Prepared by Gary Wiman, Construction Project Manager FWS/GW/pmf APPROVED: Konradt artlam. Interim City Manager K:\WP\PROJECTS\PARKS\DeBenedetti(G-Basin)\Storm Drain Improvements\C Appropriate G Basin CO Funds.doc 11/9/2010 RESOLUTION NO. 2010-190 A RESOLUTION OF THE LODI CITY COUNCIL AUTHORIZING APPROPRIATION OF FUNDS FOR CONTRACT CHANGE ORDERS FOR DEBENEDETTI PARK (G -BASIN) STORM DRAIN IMPROVEMENTS PROJECT WHEREAS, the DeBenedetti Park (G -Basin) Storm Drain Improvements Project was awarded to Teichert Construction, of Stockton, on October 7, 2009; and WHEREAS, this project is the first step in multiple storm drainage and parks projects at DeBenedetti Park. It is necessary for this project work to be completed prior to the other projects being started, which required the work to continue through last winter's above -normal rainfall; and WHEREAS, Change Order No. 1 is for costs related to the construction of a cofferdam in G -Basin ($24,313.54); and WHEREAS, Change Order No. 2 includes lowering the elevation of the 72 -inch line, removal of the temporary coffer dam, purchase of RCP pipe, increase in material escalation costs for metal rebar, and other work related to the control of storm water during the project ($119,551.19); and WHEREAS, staff recommends appropriating $150,000 from the Storm Drain Impact Fee Fund to cover the cost of the change orders. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby authorize appropriation of $150,000 from the Storm Drain Impact Fee Fund for this project. Dated: November 17,2010 I hereby certify that Resolution No. 2010-190 was passed and adopted by the City Council of the City of Lodi in a regular meeting held November 17, 2010, by the following vote: AYES: COUNCIL MEMBERS —Hansen, Hitchcock, Johnson, Mounce, and Mayor Katzakian NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS— None ABSTAIN: COUNCIL MEMBERS— None (&H City Clerk 2010-190