HomeMy WebLinkAboutAgenda Report - October 7, 1992 (56)� aF v` CITY OF LODE @99WOL COMMUNICATION AGENDA TITLE: Contract Change Order - Church Street Overlay, Lodi Avenue to Chestnut Street, Tokay Street to Vine Street MEEIIING DATE: October 7, 1992 PREPARED BY: Public Works Director RECOMMENDED ACTION: This item i s for information only. 1`b action i s required. BACKGROUND MFJvftTION: This information is being given to the City Council in accordance with the Contract Change Order policy approved by Resolution 85-72. One of the requirements of this policy is that vie inform the City Council of all change orders over 10 percent of the contract amount. The attached contract change order, approved by the City Manager, is in the amount of $12,240.75, which is 15.7% of the contract. The work includes extending the limits of the project to 60 feet south of Vine Street. Funds are available in the project budget since the contractor's (Claude C. Wood Co bid was $17,500.00 below the engineer's estimate. The final phase of the Church treet overlay (from Kettleman Lane to Vine Street), planned for next year, will be easier if the next contractor doesn't have to work through the Vine Street intersection. The estimated time of completion was increased by three days by this change order. FUNDM. Originally Budgeted: Budgeted Fund: Contract Amount: Fiscal Year 1991/92 Gas Tax $77,929.20 `Jack L. Ronsko Publ c works Director Prepared by Wesley K. Fujitani, Senior Civil Engineer JLR//lm Attachment ,r APPROVED. THOMAS A. PETERSON CCHURCI6/TXTW.02M (C0. COM) September 15, 1992 CITY OF LODI PLJBLIC WORKS DEPARTMENT CONTRACT CHANGE ORDER NO. 1 Sheet I of 2 Date Sept. 9, PW Account No.121.0-5 0.60 PROJECT: CHURCH STREET OVERLAY Lodi Avenue to Chestnut Street Tokay Street to Vine Street CONTRACTOR: Claude C. Wood Co. You are directed to make the following changes or do the following work not included in the Plans and Specifications on this contract. - - - - - - - - - - - - - - - - - - - - - - - - - - - - - — - - - - - - Description of work to be done, estimate of quantities, and prices to be paid. Specify whether additional work is at contract price, agreed price, or force account. Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. 1. Install handicap ramps cn southwest and southeast corners of Church Street and Vine Street; relocate catch basin at southeast corner of Church Street and Vine Street; grind and overlay Church Street to 60 feet south of Vine Street. See attached estimate for detailed breakdown. Agreed upon price .12,240.75 PERCENT OF CONTRACT Original Contract Price S 77 929.20 Total Cost of This Change Order NOT TO EXCEED 15.7 % Previous Change Orders $� Total Cost o f All Change Orders to Date S77,77. _75 15.7 % Contract Price, including all Change Orders, will be: $ Time of completion will be adjusted as follows: add tnree (3) days -------------------------------------------- Submitted by Date 9-9-92 Approval Recommen d I I Date Approveubl i s Director Date ,t— i'1-? z Appro y er (if over -la ge of 55,000 or 10% each or$25, tot s Date 913 9t - The gggdWrcontractor, having carefully considered the change proposed, agrees , if this proposal is approved, to provide all equipment, furnish all materials, except as otherwise noted above, perform all services necessary for the work above specified, and accept as full payment the prices shown above. ACCEPTED: Date By Contractor Title If the Contractor does not sign acceptance of this order, the Contractor should refer to Section 4-1.03A of the Standard Specifications regarding filing a written protest within the specified time. X-WORK.XLS Publics Works Department Extra Work Cost Estimate Project: Church Steet Overlay; Tokay - Vine Contractor. Claude C. Wood Co. Item Description 1 Traffic Control 2 Remove Curb S Gutter 3 Remove Ex. SICB S Lateral 4 Clearing S Grubbing 5 Misc. Concrete Subgrade Compaction 6 Pavement Reinforcing Fabric 7 Asphalt Concrete 8 Pavement Repair 9 Pavement Grinding 6' x 0.10' 10 Pavement Grinding 10'x 0.10' 11 Pavement Grinding 15' x 0.10' 12 Install 12" Storm Drain (Plus $17.50 Extra) 13 Adjust SD Manhole FSC to Grade 14 Furnish SD Manhole FSC 15 Adjust WW Manhole FSC to Grade 16 Furnish WW Manhole FSC 17 Install Square type Curb S Gutter 18 Install Sidewalk / Wheelchair Ramp 19 Install Street Sign Post 20 Install Side Inlet Catch Basin 21 Adjust Water Valve FSC to Grade 22 Furnish Water Valve FSC 449 245 SF SY 8/31192 Qty unit . Price Total 1 LS $400.00 ; $400.00 l 22.00 LF 10.25 225.50 1 EA 60.00 60.00 lF A M 9LA AA 449 245 SF SY 2.25 ; 0.90 i 1,01025 --- 220.50 42 ' TON ! 31.50 1,323.00 SF__ ! LF. ; 0.801 64.00 X80 f lF 70 421 1 LF LF EA 2.40 ' 168-001. 38.001 3,346.00 330.00 330 1 EA 172.001 17200 EA i EA 48 LF 19.50 936.00 353 SF 3.50 1,235.50 1 i EA 100.00 100.00 1 i EA 600.00 { 600.00 , 41 EA 1 325.00 1,300.00 -� --I EA i Page 1 of 1 Total $12,240.75