HomeMy WebLinkAboutAgenda Report - September 21, 2010 C-01 PH/SMAGENDA ITEM C do I
CITY OF LODI
,. COUNCIL COMMUNICATION
AGENDA TITLE: Conduct a Public Hearing to Consider and Approve the 2009/10 Community
Development Block Grant Consolidated Annual Performance and Evaluation
Report; and the Amendment of the 2010/11 Action Plan to Accommodate the
Reallocation of Unused Community Development Block Grant Funds from the
2009/10 Program Year.
MEETING DATE: September 21,2010
PREPARED BY: Community Development Department
RECOMMENDEDACTION: Conduct a public hearing to consider and approve the 2009/10
Community Development Block Grant (CDBG) Consolidated Annual
Performance and Evaluation Report (CAPER); and the amendment
of the 2010/11 Action Plan to accommodate the reallocation of
unused CDBG funds from the 2009/10 Program Year.
BACKGROUND INFORMATION: A public hearing is required as part of the federal requirements
of the Community Development Block Grant (CDBG) program.
The 2009/10 CAPER (Exhibit A) describes the programs and activities accomplished during that program
year, in which the City received $751,211 in federal CDBG funds. The public review and comment
period for the CAPER document begins September 1,2010 and will end September 21,2010.
The 2010/11 Action Plan was adopted on May 5, 2010, and approved by the U.S. Department of
Housing and Urban Development (HUD) in June 2010. Since that time, the City has identified three
projects that have funding available for reallocation. These projects had total costs that were lower than
anticipated, and fund balances can be moved to other open projects.
A total of $16,008.52 in CDBG funds from the following three 2009/10 projects are proposed for
reallocation:
Blakely Park Swing Area Resurfacing- $4,041.33.
When bid, this project came in substantially below budget. The project is now complete and the
remaining balance is proposedfor reallocation.
Graffiti Abatement - $7,960.68
The graffiti abatement program met its goals for the 2009/10 program year, but had a balance after cost
accounting was complete.
Spay/Neuter Program - $4,006.51
The spay/neuter program met its goals for the 2009/10 program year, but was not able to expend all of
its funds within the program year.
, Interim City Manager
CDBG CAPER Public Hearing
September 21,2010
Page 2 of 2
Staff has identified existing activities which will commit the reallocated funds. In order to commit a
substantial amount of additional funds to existing activities, the City must amend the 2010/11 Action
Plan.
The following 2010/11 projects are proposed to receive the reallocated funding:
Project 10-02 - Water Meter Installation Program
Current allocation: $212,417.00
Reallocated funds: $ 11,967.19
Adjusted allocation: $224, 384.19
Project 10-04 —Van Buskirk Park Playground Replacement
Current allocation: $165,000.00
Reallocated funds: $ 4,041.33
Adjusted allocation: $169,041.33
The Action Plan amendment was made available for public review during a 30 -day public comment
period from August 20, 2010 to September 21, 2010.
FISCAL IMPACT: The CAPER document is being completed as an administrative activity that
is funded through the City's CDBG administrative allocation from HUD.
FUNDING AVAILABLE: Not Applicable
iCon'raMTartIam
Community Development Director
KB/jw
2009-2010 CAPER
I. EXECUTIVE SUMMARY
This Consolidated Annual Performance and Evaluation Report describes the City's housing
and community development accomplishments in the 2009-10 fiscal year, with a special
focus on those activities funded by the Community Development Block Grant.
In the 2009-2010 program year, the City funded improvements to parks, infrastructure, and
the LOEL Center, as well as several public service activities. Accomplishments include the
following:
• Began work on the reconstruction of two alleys in low-income areas to improve
drainage;
• Resurfaced the swing area at Blakely Park;
• Provided nearly 300,000 pounds of food to more than 5,000 Lodi residents through
Second Harvest Food Bank;
• Removed more than 1,000 instances of graffiti in low-income areas;
• Funded the spay/neuter of 455 cats and 66 pit bulls;
• Provided 114 households with fair housing information; and
• Began work on kitchen improvements in the LOEL senior center.
In addition, staff continued to make progress on the development of an 80 -unit affordable
senior housing complex (with Eden Housing) and implementing a first-time homebuyer
assistance program. The City also provided one-on-one training to public service providers,
and implemented monitoring and fiscal systems to oversee and track progress of the CDBG
grant program. All of the proposed activities for the year were completed or underway by
the end of the fiscal year.
Program year 2009-10 was the City's first year as an entitlement jurisdiction for CDBG
funds. Staff strived to provide training opportunities to new grant recipients and establish
best practices, with the goal of integrating them into the day-to-day and long-term
implementation of the program.
ILINTRODUCTION
As an entitlement grantee for the United States Department of Housing and Urban
Development (HUD) formula Community Development Block Grant (CDBG) program, the
City of Lodi is required to prepare a Consolidated Annual Performance and Evaluation
Report (CAPER) to analyze and summarize program accomplishments during the preceding
program year. This CAPER assesses Lodi s progress in completing activities identified in
the 2009-10 Action Plan, which covers the period from July 1, 2009 through June 30, 2010.
The CAPER also reports progress in meeting overall five-year Consolidated Plan goals and
priorities, and identifies areas for improvement as a result of annual self -evaluations and
HUD performance reviews.
2009-2010 CAPER
The 2009-10 program year was the City of Lodi s first year as an entitlement recipient of
Community Development Block Grant (CDBG) funds. The Neighborhood Services Division,
within the Community Development Department, serves as the lead agency for the
administration of CDBG funds. Questions regarding this report should be directed to the
staff within this division at:
CDBG Program Administrator
City of Lodi
221 W. Pine Street, PO Box 3006
Lodi, CA 95241
209-333-6711
This report was made available for public review during a 15 -day public comment period
from September 1, 2010 to September 15, 2010. A public notice announcing its availability
was published in the Lodi News -Sentinel on August 18, 2010. A public hearing on the report
was held on September 21, 2010 at the Lodi City Council meeting.
III.ACTIVITY SUMMARIES
HOUSING
Affordable Housing Land Acquisition
The City will provide funding to a non-profit housing develop to purchase land for an
affordable senior housing development.
2009-10 Objective: 60-80 units constructed
Funding Allocated: $1.2 million (prior -year funding through the San Joaquin
Urban County)
2009-10 Accomplishment: Project underway
Actual Expenditure: $36,169.60 (in prior -year Urban County funds)
Narrative: City staff worked with Eden Housing, the developer selected
to build and manage the housing, to secure all entitlements
and complete grant and tax credit applications.
Environmental review of the property was completed. The
City also hired a third -party appraiser to provide valuation
of the property. Construction on the project is anticipated to
start in summer 2012. A total of 80 units are planned.
2009-2010 CAPER
PUBLIC FACILITIES
LOEL Senior Center Kitchen Renovation
Renovate and expand the current LOEL kitchen to commercial kitchen standards, so that
LOEL can take over daily senior meal preparation for north San Joaquin County. Ongoing
funding for meals will be provided through state and federal sources.
2009-10 Objective: 1 public facility improved
Funding Allocated: $228,402
2009-10 Accomplishment: Project underway
Actual Expenditure: $81,904.20
Narrative: LOEL bid the project in compliance with federal
requirements. Construction work to expand and modernize
the kitchen began in May 2010. Construction is anticipated
to be complete in September 2011. LOEL also acquired new
commercial kitchen equipment in 2009-10, using a different
funding source. Outcomes will be reported in the 2010-11
CAPER.
Alley Drainage Improvements
Reconstruct one alley to increase accessibility and drainage. Storm drain facilities will be
added and the alley will be resurfaced.
2009-10 Objective: 1 public facility improved
Funding Allocated: $249,886
2009-10 Accomplishment: Project underway
Actual Expenditure: $5,575.20
Narrative: City staff bid the project and awarded a contract for
improvements to three alleys (using additional funding from
the Urban County). After initial work began, improvements
to one alley location were determined to be infeasible. Work
continued on the two additional alleys and is anticipated to
be complete in late fall 2010. Outcomes will be reported in
the 2010-11 CAPER.
Blakely Park Swing Area Resurfacing
Resurface the Blakely Park swing area to lengthen the life of the surfacing.
2009-10 Objective: 1 public facility improved
Funding Allocated: $10,000
2009-10 Accomplishment: Project underway
2009-2010 CAPER
Actual Expenditure: $734.09
Narrative: City staff bid the project and awarded a contract for the
Blakely Park improvements. The construction was
completed in April 2010, but was not invoiced until July
2010. Outcomes will be reported in the 2010-11 CAPER.
PUBLIC SERVICES
Graffiti Abatement
The Graffiti Abatement Program will remove graffiti on properties located in target areas.
Staff will remove graffiti by pressure -washing the structure or by painting over it. The goal
of the program is to preserve neighborhood property values.
2009-10 Objective: 700 instances of graffiti removed
Funding Allocated: $50,681
2009-10 Accomplishment: 1,075 instances of graffiti removed
Actual Expenditure: $42,720.32
Narrative: The graffiti abatement program operated year-round and
exceeded goals. Most graffiti reported was removed within
1-2 days. Graffiti removal staff kept logs detailing location of
graffiti and what was written to assist the police in
identifying trends and combating future graffiti. The
remaining balance of funding will be reallocated in 2010-11.
Second Harvest Food Bank
Provide funding to Second Harvest Food Bank to purchase foods that are not typically
donated to the food bank (e.g., meat and dairy products).
2009-10 Objective: 6,500 persons assisted
Funding Allocated: $10,000
2009-10 Accomplishment: 5,552 persons assisted
Actual Expenditure: $10,000
Narrative: Second Harvest operated three food assistance programs.
The Food 4 Thought program delivered a total of 19,070
pounds of food to Lodi residents. The Senior Brown Bag
program delivered 66,816 pounds of food to Lodi seniors.
The Food Assistance Program delivered 209,329 pounds of
food to Lodi residents. The estimated value of food provided
to Lodi residents was $442,822. Second Harvest
supplemented funds from the City of Lodi with private
donations (food and cash), handling fees, and FEMA grants.
2009-2010 CAPER
Table 2
Second Harvest Food Bank Beneficiaries
Total Persons
5,552
100%
Total Low/Mod-Income
5,552
100%
Extremely low-income
4.062
73%
Low-income
910
16%
Moderate -income
580
11%
Special Needs
1,269
23%
Disabled HH Member
108
2%
Senior Headed HH
301
5%
Female Headed HH
860
15%
5+ Person HH
Not collected
-
Race/Ethnicity
--
--
Hispanic (all races)
2,145
39%
White
2,682
48%
Black or African-American
336
6%
Asian
112
<1%
American Indian or
50
<1%
Alaskan Native
Native Hawaiian or Pacific
12
<1%
American Indian or
31
<1%
Alaskan Native and White
Asian and White
59
<1%
Black or African American
119
<1%
and White
American Indian or
6
<1%
Alaskan Native and Black
Multiracial
N/A
-
Other/No response
N/A
-
San Joaquin Fair Housing
San Joaquin Fair Housing provides fair housing services, such as housing discrimination
and tenant/landlord law hotline, complaint investigation, and outreach and education
through public forums.
2009-10 Objective: 1,431 persons assisted
Funding Allocated: $20,000
2009-10 Accomplishment: 388 persons assisted (114 households)
Actual Expenditure: $20,000
Narrative: San Joaquin Fair Housing promoted fair housing by
advertising in local media, attending nine community events
2009-2010 CAPER
in San Joaquin County, and distributing fliers to four
locations in Lodi. They served a total of 388 persons (114
households) by providing information on fair housing. A
total of 25 households were served through formal intakes.
Of the 25 cases, 19 were resolved. Issues relating to formal
intakes were not concentrated on any topic.
Table 3
San Joaquin Fair Housing Beneficiaries
Total Households
114
100%
Total Low/Mod-Income
91 (households)
80%
Extremely low-income
Not collected
-
Low-income
Not collected
-
Moderate -income
91
80%
Special Needs
--
--
Disabled HH Member
35
31%
Senior Headed HH
16
14%
Female Headed HH
73
64%
5+ Person HH
26
23%
Race/Ethnicity
--
--
Hispanic (all races)
43
38%
White
48
42%
Black or African-American
5
4%
Asian
3
3%
American Indian or
Alaskan Native
1
1%
Native Hawaiian or Pacific
-
-
American Indian or
Alaskan Native and White
Asian and White
1
1%
Black or African American
and White
American Indian or
Alaskan Native and Black
Multiracial
N/A
-
Other/No response
56
49%
Spay/Neuter Program
Offer a spay/neuter program for feral cats trapped and released in target areas and pets (cats
and pit bulls) owned by low-income households.
2009-10 Objective: 214 persons assisted
2009-2010 CAPER
Funding Allocated: $32,000
2009-10 Accomplishment: 177 households assisted
Actual Expenditure: $27,993.49
Narrative: A total of 455 cats and 66 pit bulls or pit bull mixes were
fixed through the program. Of the cats, 274 were pets and
247 were feral cats. All pets fixed were owned by low-
income Lodi residents. The program reduced the number of
unwanted animals delivered to the shelter and improved
public health in the target areas by providing rabies
vaccinations to feral cats. The accomplishment is lower than
the objective because many households had multiple pets
fixed.
Table 4
Spay/Neuter Program Beneficiaries
Total Households
177
100%
Total Low/Mod-Income
177
100%
Extremely low-income
Not collected
-
Low-income
Not collected
-
Moderate -income
177
100%
Special Needs
--
--
Disabled HH Member
34
19%
Senior Headed HH
20
11%
Female Headed HH
80
45%
5+ Person HH
19
11%
Race/Ethnicity
--
--
Hispanic (all races)
36
20%
White
138
78%
Black or African-American
-
-
Asian
2
1%
American Indian or
2
1%
Alaskan Native
Native Hawaiian or Pacific
3
2%
American Indian or
Alaskan Native and White
4
2%
Asian and White
-
-
Black or African American
and White
American Indian or
Alaskan Native and Black
Multiracial
3
2%
Other/No response
25
14%
2009-2010 CAPER
Note. Data is provided only on pet owners participating in the program. Persons living
in target areas who benefited from feral cat spay/neuter are not included.
PLANNING AND ADMINISTRATION
CDBG Administration
The planning and administration funding is intended to provide funding for general staff
administration of CDBG programs and activities, including Integrated Disbursement and
Information System (IDIS) training, program set-up, reporting, planning, and subrecipient
training and monitoring.
2009-10 Objective: N/A
Funding Allocated: $150,242
2009-10 Accomplishment: N/A
Actual Expenditure: $150,242
Narrative: CDBG staff carried out a wide range of administrative
activities to implement programs and activities serving the
target income and special needs population.
EXPENDITURE SUMMARY
The following tables show the City's 2009-10 expenditures in different categories and in
comparison to federally -mandated caps. The IDIS reports in Appendix B show additional
detail on the City's expenditures.
Table 5
2009-10 CDBG Allocations and Expenditures
Planning and Administration
$150,242.00
$150,242.00
Public Services
$112,681.00
$100,713.81
Public Improvements - City
$259,886.00
$6,309.29
Public Facilities - Nonprofit
$228,402.00
$81,904.20
Total
$751,211.00
$339,169.30
Table 6
Timely Expenditure Calculation
Timely Expenditure Calculation 0%
Total 2009-10 annual funding $751,211
Total funds remaining at year-end $412,042
Percentage of total funding remaining 55%
2009-2010 CAPER
Table 7
Planning and Administration Calculation
Planning and Admin Calculation 0%
Total 2009-10 annual funding $751,211
Total planning and admin expenditures $150,242
Planning and admin percentage 20%
Table 8
Public Services Calculation
Public Services Calculation (15% max)
Total 2009-10 annual funding $751,211
Total public services expenditures $112,682
Public services percentage 13%
2009-2010 CAPER
IV.GENERAL NARRATIVE
AFFIRMATIVELY FURTHERING FAIR HOUSING
In 2009-10, the City began work on its first Analysis of Impediments to Fair Housing Choice.
This document reviews demographics; lending patterns; local, state, and federal codes and
regulations; fair housing complaints; and other relevant resources to determine
impediments to fair housing in the community. The AI will also identify actions the City
will take in order to address fair housing impediments.
During the 2009-10 fiscal year, the City contracted with San Joaquin Fair Housing, a local
non-profit agency that offers information of fair housing law and tenant -landlord disputes,
as well as investigates housing discrimination complaints. Fliers relating to fair housing
topics were distributed to four locations in Lodi, and San Joaquin Fair Housing offered
drop-in fair housing services from the Lodi Public Library one day per week. Information
was available by phone from their Stockton offices five days per week. Additional actions
taken to promote fair housing include the participation in community events, advertisement
in the Lodi News -Sentinel and on local cable access television, and maintaining a website
with fair housing information.
The City displays fair housing materials at City Hall, and copies of these materials are free
to the public. Fair housing information is sent free of charge to those who request it. In
addition, the City promotes fair housing awareness in its housing programs and works with
housing providers in the City to ensure the fair and equitable treatment of persons and
households seeking housing in the City.
AFFORDABLE HOUSING
The City's affordable housing efforts in 2009-10 focused on expanding the supply of
affordable housing and improving the ability of households to afford homeownership. The
City continued to work with Eden Housing on the 80 -unit affordable senior housing
complex planned in the Roget Park area. The project design was finalized and Eden
Housing and the City have actively pursued funding to close the gap on this project. The
City also received an $800,000 HOME grant through the California Department of Housing
and Community Development to offer a first-time homebuyer downpayment assistance
program. The City completed the program guidelines and began marketing and accepting
applications in 2009-10.
CONTINUUM OF CARE NARRATIVE
Lodi is a member of San Joaquin County's Continuum of Care. The Continuum of Care is
coordinated by the San Joaquin County Neighborhood Preservation Division, which also
manages the Shelter Plus Care and Supportive Housing Programs, both of which provide
homeless County residents with rental assistance and supportive services. San Joaquin
County also coordinates the Homeless Prevention and Rapid Re -housing Program, which
2009-2010 CAPER
offers short-term and medium-term assistance to homeless households or households as risk
of becoming homeless due to the economic recession.
The Continuum of Care is in the process of developing a Homelessness Prevention Plan,
which will contain strategies and priority actions to expand programs and services for
homeless persons and those at risk of homelessness in the region. The focus will be on
developing individual and family self-sufficiency and, to the extent possible, helping
persons at risk of homelessness to remain in their homes.
Lodi participates in the bi-annual countywide homeless survey. Staff assists with the
planning and the point -in -time count, and sponsors a community event that focuses on
connecting homeless persons with local services in coordination with the homeless count.
Local Service Provider Assistance
There are many local and regional organizations that provide assistance to the homeless,
persons at risk of homelessness, seniors, and other special needs groups. These
organizations include the Salvation Army, Second Harvest Food Bank, LOEL Center, Lodi
House, Hand Up, and many others. Second Harvest Food Bank, which provides food
primarily to very low-income families, and LOEL, which serves primarily low-income
seniors, both received grant funding in 2009-10. The City has funded many other local
service providers that serve homeless and special needs groups in prior years and continues
to support their activities.
Senior Services
In 2009-10, the City funded improvements to kitchen at the LOEL Center. The
improvements are currently underway, and once completed LOEL will begin preparing and
delivering meals to homebound seniors (Meals on Wheels) as well as continuing to offer
congregate meals at the senior center. The City also continued to make progress on the 80 -
unit affordable senior housing complex planned for the Roget Park area.
Homeless and Homeless Prevention Services
Lodi has several agencies that serve homeless populations. The Salvation Army operates an
emergency shelter with 45 beds for men and 25 beds for women/children, and owns four
units of transitional housing. They also offer daily meals and a range of supportive services
for homeless persons. Lodi House has a total of 26 beds for women/children, and they offer
supportive services as well. Although the City did not use CDBG funding in 2009-10 to
support these organizations, the City has funded them in the past and continues to support
their efforts in other ways.
Lodi staff also works with Hand Up, a grassroots homeless outreach organization that meets
monthly to discuss homeless issues. Participants include the San Joaquin County Board of
Supervisors, Salvation Army, the Unity Project, and several churches. Many of the churches
work together to provide meals to the homeless in a local park.
2009-2010 CAPER
OTHER ACTIONS IN SUPPORT OF CDBG
GOALS
Actions to Address Obstacles to Meeting Under -Served Needs
The need for affordable housing for low-income households and seniors continues to exceed
the available resources. The City has provided services, discussed previously under the
Continuum of Care narrative, and has worked to create new affordable housing
opportunities for under -served groups, including seniors.
Fostering and Maintaining Affordable Housing
The City of Lodi Strategic Plan identifies development of new housing resources as a
primary component of the City's housing strategy. The City is actively encouraging
affordable housing, most notably through the Tienda Drive affordable senior housing
complex and the downpayment assistance program.
In 2009-10 the City continued to work with Eden Housing on the development of an 80 -unit
affordable senior housing complex. Site plans were completed, and the City assisted Eden
Housing with applications for permanent financing. In 2010-11, the City anticipates selling
property to Eden Housing in an arms length transaction.
In 2009-10, the City also created its downpayment assistance program, funded by an
$800,000 HOME grant through the California Department of Housing and Urban
Development. Approximately 15 loans are anticipated to be made in 2010-11.
In 2010-11, the City plans to devote additional resources to advancing affordable housing
opportunities. City staff plans to explore alternative resources, including tax credits and
regional and state grant opportunities.
Barriers to Affordable Housing
Lodi continues to work toward meeting the housing needs of its low- and moderate -income
residents. Falling sales prices in Lodi have made many homes affordable to low- and
moderate -income households. The median sales price for homes in Lodi in 2009 was
$165,000. Despite falling sales prices in Lodi and San Joaquin County, home prices and rents
are still high enough to make it difficult for extremely low-income households to locate an
affordable unit.
A continued supply of housing affordable to all household income levels is essential to meet
the needs of the residents of the City. The City recognizes the importance of balancing
construction of new affordable housing with preserving and rehabilitating current
affordable housing resources.
The City is in the process of updating its Housing Element and completing an Analysis of
Impediments to Fair Housing Choice. Both of these documents explore barriers to
producing affordable housing, including governmental and non-governmental constraints.
2009-2010 CAPER
Governmental constraints include land use controls, entitlement processing, fees, and
building codes. Land use controls are necessary to ensure orderly and appropriate
development and growth in the City. Fees, land dedication, and public improvements are
usually required as part of land development and entitlement processing to ensure an
adequate supply of infrastructure, parks, and schools to serve the development. To facilitate
the development of affordable housing, the City may consider assisting developers in
locating resources for funding affordable housing. Building and housing codes are
implemented to ensure the safety of the community (housing residents, specifically). It is
unlikely that the City will waive building or housing code requirements as a method of
increasing affordability.
Non-governmental constraints include the availability of mortgage and rehabilitation
financing, the supply and cost of land, and construction costs. The City will monitor these
constraints and provide incentives to reduce them when possible.
Regional Housing Needs Allocation
In 2008, the City received its 2007-2014 regional housing needs allocation (RHNA) from the
local Council of Governments. The allocation indicated the continued need for a supply of
affordable housing and targets these needs by income group. In summary, the allocation
calls for 25 percent of new housing production to be affordable to low-income households
and 17 percent to be affordable to moderate -income households (using the HUD CDBG
income definitions, which differ from those used in the Housing Element). This is a total of
917 low-income units and 650 moderate -income units, and reflects a significant need for new
affordable housing.
The City's draft 2010-2016 Housing Element determines that based on the state allocation
needs, Lodi will need to demonstrate the capacity, based on appropriately zoned land, to
accommodate 917 housing units affordable to low-income households and 650 housing units
affordable to moderate -income households during the current RHNA period. In addition,
the City will have to demonstrate the capacity to accommodate 716 units for persons earning
between 81 and 120 percent of the area median income.
Public Housing and Resident Initiatives
The City does not own any public housing. The 2009-2014 Consolidated Plan does not
include plans to construct or operate public housing. The City does have two public and/or
subsidized housing developments within its boundaries. These are owned and operated by
the Housing Authority of the County of San Joaquin (HACSJ). The City works with HACSJ
to ensure the continued quality of public housing in the City.
Lead -Based Paint
The City did not conduct any activities for which lead-based paint clearance was necessary
in 2009-10. For non-CDBG-funded housing programs, the City does conduct a visual
assessment to identify lead-based paint hazards when necessary and contracts with certified
lead-based paint inspectors on a case-by-case basis.
2009-2010 CAPER
Compliance and Monitoring
City staff met with the subrecipient staff responsible for each activity prior to the beginning
of the program year. All subrecipients were informed of the obligations to collect the
required information on income, household composition, and race and ethnicity. The City
also provided information on subrecipient agreement policies, data collection, and financial
management and recommended each subrecipient read the "Playing by the Rules' guide
produced by HUD. Staff provided technical assistance to subrecipients throughout the year.
Quarterly, staff examined the progress the subrecipient was making toward performance
targets. Public services subrecipients must report their service population with each billing.
Each subrecipient agreement contains provisions for reductions to or suspensions of
payments in the event that targets are not being met (without valid reason) or when past
performance issues have not been resolved.
The City has placed a strong emphasis on its subrecipients gathering complete and accurate
information on the persons and/or households they serve, and regularly reporting on
progress.
Anti -Poverty Strategy
During the program year, the City worked with several organizations that focus on
increasing self-sufficiency among lower-income populations. These organizations included
the Salvation Army, which provides a full range of counseling and training services to
homeless residents, and the Lodi Library adult literacy program. The Second Harvest Food
Bank, which was funded by a $10,000 CDBG grant, provided food to low-income families
through local churches and non -profits, many of whom offer social services to assist with
job training and housing security. The City also provides code enforcement services to
ensure that lower-income households have a habitable place to live.
The City contracts with San Joaquin Fair Housing to provide fair housing counseling to
residents; most of the households that take advantage of this resource are low-income. The
housing counseling offers advice on resolving tenant -landlord disputes, among other topics,
in an attempt to help low-income households stay in their homes.
The City's support of the LOEL Center kitchen renovation will ensure that the City's elderly
receive adequate nutrition at a nominal cost. This preserves the limited income that many
elderly persons have.
LEVERAGING RESOURCES
With respect to public services funded with CDBG funds, the City requires all subrecipients
to identify other resources they will utilize during the program year to operate and
implement CDBG-supported activities. It is the City's intent to ensure adequate non-federal
and private funds are available, thus minimizing the dependence on federal funds. To best
leverage the City's available resources, the City will continue to layer private and non-
federal resources with federal resources.
2009-2010 CAPER
CITIZEN COMMENTS
The City provided public notice of the public review period and planned submission of this
CAPER. The draft document was made available on the City website and at City Hall.
Public notice included the address of City Hall, staff contact names, mailing addresses,
phone numbers, the address of website to view the report, and information on where to
direct comments and questions.
If any comments are received, the City endeavors to respond to all questions or comments
within 10 business days.
SELF-EVALUATION
What is the status of grant programs?
Although 2009-10 was Lodi s first year as a CDBG entitlement jurisdiction, the City had
several years of experience operating a CDBG program under the Urban County. The City
spent approximately 45 percent if its first-year allocation, with all projects underway as of
the end of the fiscal year. The City worked with three non-profit service providers on public
service and facility projects benefiting low- and moderate -income households and seniors.
The City also conducted services and facility improvements in the target areas.
Are grant disbursements timely?
HUD requires that at a point approximately three-quarters of the way through the fiscal
year, grantees have available in their line of credit no more than 1.5 times that year's
entitlement grant. The City of Lodi is compliant with this regulation. Staff has implemented
a system to draw funds shortly after the costs are paid or incurred, meaning the City is
reimbursed promptly for all CDBG costs.
Are major goals on target?
Overall, the City is progressing toward its goals of fostering the development of affordable
housing, improving target areas through public facilities and increases in services, and
providing supportive services to the elderly and low-income households. Other goals in the
five-year Consolidated Plan that will need continued effort include rehabilitation of
residential areas on Lodi s Eastside and programs targeted at economic development.
Are any activities or types of activities falling behind schedule?
The Activity Summaries section, beginning on page 2, provides a description of each activity
planned in 2009-10 and its actual accomplishments during the year. All planned projects
were started during the fiscal year. The alley drainage project started later in the year than
anticipated due to engineering delays, but is on track to be completed during the 2010-11
year.
2009-2010 CAPER
In mid -year, the City analyzed each project's rate of expenditure and ability to meet
identified goals. As a result of this analysis, the City moved to reallocate funding that looked
likely to remain unspent.
Are the activities and strategies making an impact on identified needs?
The housing and community development activities that are funded through the grant are
making a positive impact in the community and specifically on the needs identified in the
Consolidated Plan and Action Plan. The funded activities and strategies are vital to the
City's health and well-being in many ways. The City's considerable efforts to foster
neighborhood improvements will allow more residents to have access to attractive, safe, and
affordable housing, community services, and public facilities. The funded public service
activities provide many vulnerable citizens, such as seniors and extremely low-income
persons, with essential and life -enhancing services. Each funded activity in this program
year is directly related to one of the goals in the Consolidated Plan and helps to further
achievement of the City's community development objectives and goals.
What barriers may have a negative impact on fulfilling the strategies
and the overall vision?
The primary barrier to achieving the Consolidated Plan goals and strategies is a lack of
funding. The City's need for affordable housing, public facilities, and public services to fully
serve the low- and moderate -income population is extensive, and far exceeds available
funding resources. The economic recession also limits the City's ability to funds projects and
program using local resources.
Based on findings, what adjustments or improvements to strategies
and activities might meet the City's needs more effectively?
The City will devote substantial staff time to researching new funding opportunities to
maximize the City's ability to meet residents' needs. The City will also evaluate all proposed
activities based on factors such as leveraging and number of beneficiaries in an attempt to
increase funding efficacy.
2009-2010 CAPER
RESOLUTION NO. 2010-162 ' w
A RESOLUTION OF THE LODI CITY COUNCIL APPROVING THE 2009-10 COMMUNITY
DEVELOPMENT BLOCK GRANT CONSOLIDATED ANNUAL PERFORMANCE AND
EVALUATION REPORT; AND AMENDING THE 2010-11 ACTION PLAN TO
ACCOMMODATE THE REALLOCATION OF UNUSED COMMUNITY DEVELOPMENT
BLOCK GRANT FUNDS FROM THE 2009-10 PROGRAM YEAR
WHEREAS, the Department of Housing and Urban Development has determined that the City of
Lodi, California, is entitled to Community Development Block Grant (CDBG) as an entitlement community;
and
WHEREAS, the 2009-10 Consolidated Annual Performance and Evaluation Report (CAPER)
describes the programs and activities accomplished during that program year, in which the City received
$751,211 in federal CDBG funds; and
WHEREAS, the City of Lodi has held, with proper notification and at the completion of the
mandatory 15 -day public comment period, a public hearing at the City Council meeting of September 21,
2010, to receive comments on the draft CAPER; and
WHEREAS, the 2010-11 Action Plan was adopted on May 5, 2010, and approved by the U.S.
Departmentof Housing and Urban Development (HUD) in June of 2010; and
WHEREAS, since that time, the City has identified the following three projects that have a total of
$16,008.52 in CDBG funding available for reallocation:
funds:
Blakely Park Swing Area Resurfacing $4,041.33
Graffiti Abatement $7,960.68
Spay/Neuter Program $4,006.51
WHEREAS, the City has identified the following existing activities that will commit the reallocated
Project 10-02 Water Meter Installation Project $11,967.19
Project 10-04 Van Buskirk Park Playground Replacement $ 4,041.33
WHEREAS, the reallocation of funds requires an amendment of the 2010-11 Action Plan; and
WHEREAS, the City of Lodi has held, with proper notification and at the completion of the
mandatory 30 -day public comment period, a public hearing at the City Council meeting of September 21,
2010, to receive comments on the proposed Action Plan amendment.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Lodi does hereby
approve the Final 2009-10 CAPER that is to be submitted to HUD by September 30, 2010; and
BE IT RESOLVED that the City Council does also approve the amendment of the 2010-11 Action
Plan to accommodate the aforementioned reallocations.
Dated: September 21, 2010
hereby certify that Resolution No. 2010-162 was passed and adopted by the City Council of the
City of Lodi in a special meeting held September 21, 2010, by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN
COUNCIL MEMBERS— Hansen, Hitchcock, Johnson, Mounce, and
Mayor Katzakian
COUNCIL MEMBERS— None
COUNCIL MEMBERS—None
COUNCIL MEMBERS— None
2010-162
CDBG Public Hearing
Presented by
Community Development Department
September 2010
CDBG Public Hearing
■ 2009/10 Consolidated Annual Performance and
Evaluation Report (CAPER)
Lj Programs and Activities Accomplished in 2009/10 Program
Year (July 1, 2009 — June 30, 2010)
Lj Due to HUD before September 30, 2010
■ 2010/11 Action Plan Amendment
Lj Reallocation of Unused 2009/10 CDBG Funds
■ Public Review/Comment Period
Li No Public Comments Received
CDBG Public Hearing
CAPER
■ Review 2009/10 CDBG Activities
❑ Alley Improvement Project
❑ Blakely Park Playground
❑ Second Harvest Food Bank
❑ Graffiti Abatement
❑ Spay/Neuter Program
❑ Fair Housing
❑ LOEL Kitchen Project
■ Program Evaluation
❑ Timeliness
❑ On -Target Major Goals
❑ Continued Effort
CDBG Public Hearing
Action Plan Amendment
■ Unused 2009/10 Funds Available
• Blakely Park Swing Resurfacing $4,041.33
o Graffiti Abatement Program $7,960.68
o Spay/Neuter Program $4,006.51
■ Total Reallocation Amount: $16,008.52
o Reallocation
of
these funds
requires the
Amendment
of
our 2010/11
Action
Plan
CDBG Public Hearing
Action Plan Amendment
■ Reallocated Funds Directed to:
Project 10-02 Water Meter Installation Program
■ Current Allocation $212,417.00
■ Reallocation $ 11,967.19
• Adjusted allocation: $224,384.19
Project 10-04 Van Buskirk Park Playground
Replacement
■ Current Allocation
■ Reallocation
• Adjusted Allocation
$165,000.00
$ 4.041.33
$169,041.33
CDBG Public Hearing
■ Public Hearing
. Questions or Comments.?
■ Requested Action
u To adopt the Resolution approving...
■ the 2009/10 Consolidated Annual Performance and
Evaluation Report...
■ And the amendment of the 2010/11 Action Plan to
accommodate the reallocation of available CDBG funds from
2009/10.
CITY OF LODI
LEGAL ADVERTISEMENT
ADVERTISING INSTRUCTIONS
SUBJECT: NOTICE OF PUBLIC HEARING FOR DISCUSSION OF POSSIBLE
CDBG APPLICATIONS
PUBLISH (DATES): August 18,20 10
TEAR SHEETS WANTED: 1 EXTRA (ONLY) DELIVER TO: Community
Development Dept.
AFFIDAVIT & BILL TO: Communi Development - CDBG
Cily of Lodi
221 W. Pine Street
Lodi, CA 95241
DATE: August 16,2010 ORDERED BY: Joseph Wood
TITLE: Neighborhood Services Division Manager
P\Community Development\Neighborhood Services Division\CDBG\2009-2010\CAPER\2009-10 CAPER Public Notice-Revised.doc
LEGAL NOTICE
NOTICE OF PUBLIC HEARING FOR ANNUAL REPORT OF THE COMMUNITY
DEVELOPMENT BLOCK GRANT PROGRAM
NOTICE IS HEREBY GIVEN that a public hearing will be held on Wednesday, September 21,2010 at
7:00 a.m. or as soon thereafter as the matter may be heard, in the Lodi City Council Chambers, 305
West Pine Street, Lodi, CA 95241 in order to consider the Community Development Block Grant
(CDBG) Program Consolidated Annual Performance and Evaluation Report. The 2009-10 CAPER
describes the programs and activities accomplished during that program year, in which the City received
$751,211 in federal CDBG funds.
The release of this notice is one of the City's activities to fulfill citizen participation requirements.
Federal regulations require localities to provide the public with reasonable access to the documents.
The CAPER is available for public review at the Lodi City Hall, 221 West Pine Street, and on the City's
website at www.lodi.gov/community_development/neighborhoods/cdbg.html. Copies of the CAPER
will be made available upon request and are free of charge.
The public review and comment period begins September 1, 2010 and will end September 21, 2010.
The City Council will consider adoption of the CAPER and provide an opportunity for public comment
at their September 21, 2010 meeting.
The purpose of this public hearing will be to give citizens an opportunity to make their comments
known regarding community needs and accomplishments under the CDBG Program. If you are unable
to attend the public hearing, you may direct written comments to the City Clerk, City of Lodi, PO Box
3006, Lodi, CA 95241, or you may telephone (209) 333-6711. In addition, information is available for
review at Lodi City Hall (221 West Pine Street) between the hours of 8:00 a.m. and 5:00 p.m. on
weekdays.
The City promotes fair housing and makes all its programs available to low- and moderate -income
families regardless of age, race, color, religion, sex, national origin, sexual preference, marital status or
handicap.
Neighborhood Services Manager
Joseph Wood
Dated: August 18,2010
J:\Community Development\Neighborhood Services Division\CDBG\2009-2010\CAPER\2009-10 CAPER Public Notice-Revised,doc
LEGAL ADVERTISEMENT
ADVERTISING INSTRUCTIONS
SUBJECT: 2010-11 COMMUNITY DEVELOPMENT BLOCK GRANT ACTION PLAN
AMENDMENT
PUBLISH (DATES): August 19,20 10
TEAR SHEETS WANTED: 1 EXTRA (ONLY) DELIVER TO: Communi . Development
Dept.
AFFIDAVIT & BILL TO: Communi . Development - CDBG
City of Lodi
221 W. Pine Street
Lodi, CA 95241
DATE: August 16,2010 ORDERED BY: Joseph Wood
TITLE: Neighborhood Services Manager
Dated: August 19,2010
NOTICE S HEREBY GIVEN that on Tuesday, September 21, 2010, at the hour of 7:00 a.m.,
or as soon thereafter as the matter may be heard, the City Council will conduct a public hearing
at the Camegie Forum, 305 West Pine Street, Lodi, to consider the following matter:
2010-11 Community Development Block Grant Action Plan Amendment
The City of Lodi plans to amend its 2010-11 Action Plan. As a recipient of Community
Development Block Grant (CDBG) funding, the City has developed an Action Plan that
describes the activities proposed to be funded in 2010-11. The Action Plan generally describes
how the City will utilize program funds for eligible activities during the fiscal year. The Action
Plan can be amended as needed to reallocate funds to housing and community development
activities.
The City proposes to reallocate funds from projects with unspent funds to the Water Meter
Installation Project and the Van Buskirk Playground Improvements. The Water Meter
Installation Project will assist low-income homeowners with paying their assessments for water
meters. The Van Buskirk Playground Improvements project will replace existing playground
equipment to meet new ADA and playground safety requirements.
The release of this notice is part of the City's activities to fulfill federal citizen participation
requirements. The Action Plan amendment must be available to the public and the City must
provide reasonable access to documents.
The Action Plan amendment will be available for public review at the Lodi City Hall, 221 West
Pine Street, and on the City's website at
http://www.lodi.gov/community_development/Neighborhoods/CDBG.html. Copies of the
documents will be made available upon request.
The public review and comment period begins August 20, 2010 and will end September 21,
2010. The City Council will consider adoption of the Action Plan amendment and provide an
opportunityfor public comment at their September21, 2010 meeting.
Questions or comments regarding the Action Plan amendment can be directed to Joseph Wood,
Neighborhood Services Manager, at (209) 333-6711 orjwood@lodi.gov.
Information regarding this item may be obtained in the Community Development Department,
221 West Pine Street, Lodi, (209) 333-6711. All interested persons are invited to present their
views and comments on this matter. Written statements may be filed with the City Clerk, City
Hall, 221 West Pine Street, 2nd Floor, Lodi, 95240, at any time prior to the hearing scheduled
herein, and oral statements may be made at said hearing.
If you challenge the subject matter in court, you may be limited to raising only those issues you
or someone else raised at the public hearing described in this notice or in written
correspondence delivered to the City Clerk, 221 West Pine Street, at or prior to the close of the
public hearing.
In compliance with the Americans with Disabilities Act, if you need special assistance to
participate in this meeting, please contact the Office of the City Clerk at (209) 333-6702.
Notification 48 hours prior to the meeting will enable the City to make reasonable arrangements
to ensure accessibilityto this meeting.
X
DECLARATION OF POSTING
PUBLIC HEARINGTO CONSIDERAND APPROVE THE 2009110 COMMUNITY
DEVELOPMENT BLOCK GRANT CONSOLIDATED ANNUAL PERFORMANCE AND
EVALUATION REPORT; AND AN AMENDMENT OF THE 2010111 ACTION PLAN TO
ACCOMMODATE THE REALLOCATION OF UNUSED COMMUNITY DEVELOPMENT
BLOCK GRANT FUNDS FROM THE 2009/10 PROGRAM YEAR
On Friday, September 3, 2010, in the City of Lodi, San Joaquin County, California, a
Notice Public Hearing to consider and approve the 2009/10 Community Development
Block Grant Consolidated Annual Performance and Evaluation Report; and an
amendment of the 2010/11 Action Plan to accommodate the reallocation of unused
Community Development Block Grant funds from the 2009/10 program year (attached
and marked as Exhibit A) was posted at the following locations:
Lodi Public Library
Lodi City Clerk's Office
Lodi City Hall Lobby
Lodi Carnegie Forum
I declare under penalty of perjury that the foregoing is true and correct.
Executed on September 3, 2010, at Lodi, California.
JENNIFER M. ROBISON, CMC
ASSISTANT CITY CLERK
N:\Administration\CLERK\Forms\DECPOSTCDD.DOC
ORDERED BY:
RANDIJOHL
CITY CLERK
LEGAL NOTICE
NOTICE OF PUBLIC HEARING FOR ANNUAL REPORT OF THE COMMUNITY
DEVELOPMENT BLOCK GRANT PROGRAM
NOTICE IS HEREBY GIVEN that a public hearing will be held on Wednesday, September 21, 2010 at
7:00 a.m. or as soon thereafter as the matter may be heard, in the Lodi City Council Chambers, 305
West Pine Street, Lodi, CA 95241 in order to consider the Community Development Block Grant
(CDBG) Program Consolidated Annual Performance and Evaluation Report. The 2009-10 CAPER
describes the programs and activities accomplished during that program year, in which the City received
$751,211 in federal CDBG funds.
The release of this notice is one of the City's activities to fulfill citizen participation requirements.
Federal regulations require localities to provide the public with reasonable access to the documents.
The CAPER is available for public review at the Lodi City Hall, 221 West Pine Street, and on the City's
website at www.lodi.gov/communityjevelopment/neighborhoods/edbg.html. Copies of the CAPER
will be made available upon request and are free of charge.
The public review and comment period begins September 1, 2010 and will end September 21, 2010.
The City Council will consider adoption of the CAPER and provide an opportunity for public comment
at their September 21, 2010 meeting.
The purpose of this public hearing will be to give citizens an opportunity to make their comments
known regarding community needs and accomplishments under the CDBG Program. If you are unable
to attend the public hearing, you may direct written comments to the City Clerk, City of Lodi, PO Box
3006, Lodi, CA 95241, or you may telephone (209) 333-6711. In addition, information is available for
review at Lodi City Hall (221 West Pine Street) between the hours of 8:00 a.m. and 5:00 p.m. on
weekdays.
The City promotes fair housing and makes all its programs available to low- and moderate -income
families regardless of age, race, color, religion, sex, national origin, sexual preference, marital status or
handicap.
Neighborhood Services Manager
Joseph Wood
Dated: August 18,2010
J:\Community Development\Neighborhood Services Division\CDB"1 009-2010\CAP1 R\2009-10 CAPER Public Notice-Revised.doc
Dated: August 19, 2010
NOTICE IS HEREBY GIVEN that on Tuesday, September 21, 2010, at the hour of 7:00 a.m.,
or as soon thereafter as the matter may be heard, the City Council will conduct a public hearing
at the Carnegie Forum, 305 West Pine Street, Lodi, to consider the following matter:
2010-11 Community Development Block Grant Action Plan Amendment
The City of Lodi plans to amend its 2010-11 Action Plan. As a recipient of Community
Development Block Grant (CDBG) funding, the City has developed an Action Plan that
describes the activities proposed to be funded in 2010-11. The Action Plan generally describes
how the City will utilize program funds for eligible activities during the fiscal year. The Action
Plan can be amended as needed to reallocate funds to housing and community development
activities.
The City proposes to reallocate funds from projects with unspent funds to the Water Meter
Installation Project and the Van Buskirk Playground Improvements. The Water Meter
Installation Project will assist low-income homeowners with paying their assessments for water
meters. The Van Buskirk Playground Improvements project will replace existing playground
equipment to meet new ADA and playground safety requirements.
The release of this notice is part of the City's activities to fulfill federal citizen participation
requirements. The Action Plan amendment must be available to the public and the City must
provide reasonable access to documents.
The Action Plan amendment will be available for public review at the Lodi City Hall, 221 West
Pine Street, and on the City's website at
http://www.lodi.gov/community_development/Neighborhoods/CDBG.htmi. Copies of the
documents will be made available upon request.
The public review and comment period begins August 20, 2010 and will end September 21,
2010. The City Council will consider adoption of the Action Plan amendment and provide an
opportunity for public comment at their September 21, 2010 meeting.
Questions or comments regarding the Action Plan amendment can be directed to Joseph Wood,
Neighborhood Services Manager, at (209) 333-671 1 orjwood@lodi.gov.
Information regarding this item may be obtained in the Community Development Department,
221 West Pine Street, Lodi, (209) 333-6711. All interested persons are invited to present their
views and comments on this matter. Written statements may be filed with the City Clerk, City
Hall, 221 West Pine Street, 2nd Floor, Lodi, 95240, at any time prior to the hearing scheduled
herein, and oral statements may be made at said hearing.
If you challenge the subject matter in court, you may be limited to raising only those issues you
or someone else raised at the public hearing described in this notice or in written
correspondence delivered to the City Clerk, 221 West Pine Street, at or prior to the close of the
public hearing.
In compliance with the Americans with Disabilities Act, if you need special assistance to
participate in this meeting, please contact the Office of the City Clerk at (209) 333-6702.
Notification 48 hours prior to the meeting will enable the City to make reasonable arrangements
to ensure accessibility to this meeting.