A% CITY OF LODI
COUNCIL COMMUNICATION
TM
AGENDA TITLE: Adopt Resolution Awarding Contractfor Carnegie Forum Re -Roof Projectto Hester
Roofing of Sacramento $26,240
MEETING DATE: September 21, 2010 (Special Meeting)
PREPARED BY: PublicWorks Director
RECOMMENDED ACTION: Adopt resolution awarding the contractfor Carnegie Forum Re -Roof
projectto Hester Roofing, of Sacramento, in the amount of $26,240.
BACKGROUND INFORMATION: This project consists of installing anew thermoplastic single -ply roofing
system over the existing built-up roof. Funding for the projectwas
appropriated in the FY2010/11 budgetfrom the Capital Outlay Fund in
the amount of $20,000 for Miscellaneous Capital Improvement Projects.
The total project cost including contingencies is expected to be approximately $30,000 and, therefore, it will
be necessary to assign $10,000 of the contingencyfor the Miscellaneous Projectsto the Carnegie Forum
Re -Roof Project.
Plans and specifications for this project were approved on August 18, 2010. The City received seven bids
for this project on September 8, 2010. One bid was deemed non-responsive because of a failure to include
the required receipt of addendum.
Bidder
Location
Bid
Engineer's Estimate
$
48,000
Clark Roofing
Sacramento
$
23,920 (non-responsive)
Hester Roofing
Sacramento
$
26,240
Baker Roofing Company
Stockton
$
29,500
Priority Roofing Solutions
San Jose
$
29,700
California Single Ply, Inc.
Rocklin
$
29,725
Kodiak Union Roofing Services
Lincoln
$
33,690
T.A. Krause
Lodi
$
33,750
FISCAL IMPACT: Maintenance
costs for leak repairs should be reduced.
FUNDING AVAILABLE: Capital Outlay Fund (1211)
Cj" 6�� 4�L�
Jordan Ayers
Deputy City Manager/Internal Z-rvices Director
�W
F. Wally ndelin
Public Works Director
Prepared by Dennis J. Callahan, Fleet and Facilities Manager
FWS/DJC/dic
cc: City Attorney
APPROVED:
Konradt Bartlam, Interim City Manager
K:\WP\PROJECTSXMISC\CarnegieReRoot\CAward.doc
9/13/2010
CARNEGIE FORUM RE -ROOF
305 West Pine Street CONTRACT
THIS CONTRACT made by and between the CITY OF LODI, State of California, herein
referred to as the "City," and HESTER ROOFING, herein referred to as the "Contractor."
WITNESSETH:
That the parties hereto have mutually covenanted and agreed, and by these presents do
covenant and agree with each other, as follows:
The complete Contract consists of the following documents which are incorporated herein by
this reference, to -wit:
Notice Inviting Bids
Information to Bidders
General Conditions
Special Provisions
Bid Proposal
Contract
Contract Bonds
Plans (Drawings)
Specifications
Addenda
All of the above documents, sometimes hereinafter referred to as the "Contract Documents,"
are intended to cooperate so that any work called for in one and not mentioned in the other is to
be executed the same as if mentioned in all said documents.
ARTICLE I - That for and in consideration of the payments and agreements hereinafter
mentioned, to be made and performed by the City and under the condition expressed in the two
bonds bearing even date with these presents and hereunto annexed, the Contractor agrees
with the City, at Contractor's cost and expense, to do all the work, furnish all labor and furnish
all the materials except such as are mentioned in the specifications to be furnished by the City,
necessary to construct and complete in a good workmanlike and substantial manner and to the
satisfaction of the City the proposed improvements as shown and described in the Contract
Documents which are hereby made a part of the Contract.
ARTICLE II - The City hereby promises and agrees with the Contractor to employ, and does
hereby employ, the Contractor to provide all materials and services not supplied by the City and
to do the work according to the terms and conditions for the price herein, and hereby contracts
to pay the same as set forth in Clauses 65 and 66 General Conditions, in the manner and upon
the conditions above set forth; and the said parties for themselves, their heirs, executors,
administrators, successors and assigns, do hereby agree to the full performance of the
covenants herein contained.
ARTICLE I I I - The Contractor agrees to conform to the provisions of Chapter 1, Part 7, Division
2 of the Labor Code. The Contractor and any Subcontractor will pay the general prevailing
wage rate and other employer payments for health and welfare, pension, vacation, travel time,
and subsistence pay, apprenticeship or other training programs. The responsibility for
compliance with these Labor Code requirements is on the prime contractor,
CONTRACT.DOC 1 9/10/2010
ARTICLE IV - And the Contractor agrees to receive and accept the following prices as full
compensation for furnishing all materials and for doing all the work contemplated and embraced
in this agreement; also for all loss or damage arising out of the nature of the work aforesaid or
from the action of the elements, or from any unforeseen difficulties or obstructions which may
arise or be encountered in the prosecution of the work until its acceptance by the City, and for
all risks of every description connected with the work; also for all expenses incurred by or in
consequence of the suspension or discontinuance of work and for well and faithfully completing
the work, and the whole thereof, in the manner and according to the Plans and Contract
Documents and the requirements of the Engineer under them, to -wit:
Perform the work necessary to furnish all labor, material, tax, equipment, and services
necessary for the construction and completion of the "Carnegie Forum Re -Roof, 305 West Pine
Street" Project and associated improvements. The Project includes installing a new
thermoplastic single -ply roofing system over the existing built-up roof, and all associated work
as described in the project plans (drawings) and specifications, all in accordance with the
specifications and working details and other contract documents now on file with the Director of
Public Works, City Hall, 221 W. Pine Street, Lodi.
Item Description Unit Total Price
1. Carnegie Forum Re -Roof Project LS $26,240.00
ARTICLE V - By my signature hereunder, as Contractor, I certify that I am aware of the
provisions of Section 3700 of the Labor Code, which requires every employer to be insured
against liability for workers' compensation or to undertake self-insurance in accordance with the
provisions of that code, and I will comply with such provisions before commencing the
performance of the work of this contract.
ARTICLE VI - It is further expressly agreed by and between the parties hereto that, should
there be any conflict between the terms of this instrument and the Bid Proposal of the
Contractor, then this instrument shall control and nothing herein shall be considered as an
acceptance of the said terms of said proposal conflicting herewith.
ARTICLE VII - The City is to furnish the necessary rights-of-way and easements and to
establish lines and grades for the work as specified under the Special Provisions. All labor or
materials not mentioned specifically as being done by the City will be supplied by the Contractor
to accomplish the work as outlined in the specifications.
ARTICLE VIII - The Contractor agrees to commence work pursuant to this contract and to
diligently prosecute to completion within 30 CALENDAR DAYS.
When signing this contract, the contractor agrees that the time of completion for this contract is
reasonable and the contractor agrees to pay the city liquidated damages of $500.00 per day
for each day the work is not completed beyond the time specified in the preceding
paragraph. Contractor agrees that this amount may be deducted from the amount due the
contractor under the contract.
CONTRACTLOC 2 9/10/2010
IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands the year
and date written below.
CONTRACTOR:
By:
Title
(CORPORATE SEAL)
CITY OF LODI
By:
Konradt Bartlam
Interim City Manager
Date:
Attest:
Randi Johl, City Clerk
Approved as to form:
D. Stephen Schwabauer
City Attorney
CONTRACT. DOC 3 8/24/2010
RESOLUTION NO. 2010-159
A RESOLUTION OF THE LODI CITY COUNCIL AWARDING
THE CONTRACT FOR CARNEGIE FORUM REROOF PROJECT
WHEREAS, in answer to notice duly published in accordance with law and the order of
this City Council, sealed bids were received and publicly opened on September 8, 2010, at
11:00 a.m. for the Carnegie Forum Reroof Project, described in the specifications therefore
approved by the City Council on August 18,2010; and
WHEREAS, said bids have been checked and tabulated and a report thereof filed with
the City Manager as follows:
Bidder
Bid
Engineer's Estimate
$
48,000
Clark Roofing, Sacramento
$
23,920* (non-responsive)
Hester Roofing, Sacramento
$
26,240
Baker Roofing Company, Stockton
$
29,500
Priority Roofing Solutions, San Jose
$
29,700
California Single Ply, Inc., Rocklin
$
29,725
Kodiak Union Roofing Services, Lincoln
$
33,690
T.A. Krause, Lodi
$
33,750
*Bid deemed non-responsive due the failure of the bidder to include
the required Receipt of Addendum.
WHEREAS, staff recommends awarding the contract for the Carnegie Forum Reroof
Project to the lowest responsible bidder, Hester Roofing, of Sacramento, California, in the
amount of $26,240.
NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby award
the contract for the Carnegie Forum Reroof Project to the lowest responsible 'bidder, Hester
Roofing, of Sacramento, California, in the amount of $26,240.
Dated: September 21, 2010
I hereby certify that Resolution No. 2010-159 was passed and adopted by the Lodi City
Council in a special meeting held September 21, 2010, by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
COUNCIL MEMBERS — Hansen, Hitchcock, Johnson, Mounce, and
Mayor Katzakian
COUNCIL MEMBERS — None
COUNCIL MEMBERS— None
COUNCIL MEMBERS —None
2010-159
RANDI JOHL
City Clerk