HomeMy WebLinkAboutAgenda Report - September 16, 1992 (56)CITY CMNCIL NZETING
September 16, 1992
CITY COU40L '
`MES vkNNO • ""'�°' CITY OF LOBI
PHILUP A. PENNtNQ
Milo► Pie Tinpp�
D*M M. HnrCHMAN CITY HALL 221 WEST RNE STREET
IAC X SOC = PDQ. BOX 3006
)OHN R mtaedyl SNfOet LODI, CAUFORNIA 95241-1910
(2o9I 334-5634
FAX W" 3XMM
September 17, 1992
M r . Roger Houston
Chief Building Official )
221 west Pine Street )
Lodi, CA 95240
— SEE MIAILING LIST ATTACHED
THOMAS & PETERSON
car
AM M. RSMCHE
Car aesL
808 MCNATT
Cap AMMIM
SUBJECT: Selection Committee for Civic Center Improvements Project
Thank you for accepting the appointment to the Selection Committee for the
City of Lodi's Civic Center expansion. i'he co=ittee will be rnade up of
the following people:
City Council Member, Randy Snider
Planning Commission Chairman, Larry Hindt
SPARC Chairman, Leonard Bull
Local Building Contractor, Jim Culbertson
Public Works Director, Jack Ronsko
Finance Director, Dixon Flynn
Chief Building Official, Roger iouston
I`m enclosing a copy of the request for qualifications (RFQ) letter
that was sent to architectural firms in the Lodi ar.d Stockton arAa on
August 28, 1992. Responses are due frow the firms wishing to participate
by Monday, September 21, 1992, at 12 noon. After the responses are
received, you will be contactad by a member of tha Public Works staff to
schedule a time when the Selection Committee can reed to review these.
The committee's responsibility' will be to select the qualified firms.
If there are more than three quaTi fi ed firms, they will be invited to
submit a more detailed proposal. Following the review of those dela i 1 ed
proposals, the comittee will narrow the field of archita-cts to be invited
to give an oral presentation. If there are three or less, we maY 4o
directly to the oral presentation/interview stage. The final step, after
the oral presentations and interviewing the firms, will be to select the
architectural firm that will be recommended to the City Council.
LRFQCOMM/TXT'W 02M
Mr. Roger Houston '
September 17, 1992
Page 2
Again, thank you for agreeing to serve on the Selection Committee. I am
confident that the time and effort you take will result in the selection of
the most qualified architectural fine. If you have any questions
concerning this process, please contact Dennis Callahan, the City's
Building and Equipment Maintenance Superintendent. Dennis's phone number
is-333-6706.
Pinker Jr.
Mayor
JWP/DC m
Enclosure
cc: City Manager
Cit yy Council ✓
Building ana Equipment Maintenance Superintendent
LRFQCOMM/TXTW.02M
&NAME
&ATTN
&ADD
&CITY
Xr. Jack Ronsko
Public Works Director
221 West Pine Street
Lodi, CA 95240
Mr. Dixon Flynn
Finance Director
221 Uest Pine Street
Lodi, CA 95240
Mr. Roger Houston
Chief Building Official
221 West Pine Street
Lodi, CA 95240
Honorable John R [Randy) Snider
City Council Member
221 West Pine Street
Lodi, CA 95240
Xr. Larry Mindt
Planning Corratii s s i on Chairman'
c/o 804 Cypress Run
Woodbridge, CA 95258
Mr. Leonard Bull
SPARC Chairman
P. Q Box 667
Lodi, CA 95241
Hr. Jim Culbertson
Contractor
641 N. Pecffic Ave.
Lodi, CA 95242
.- .
CITY COUNCIL
JAMES W PINKERTON, Mayor
PHILLIP A. PENNINO
Mayor Pro $-pone
o^no M. HINCHMAN
JACK A. SIECLOCK
)OHN R. t WKhi SNIDER
CITY OF LODI
SEE WILING LIST ATTACHED
CITY HALL, 221 WEST PINE STREET
P.Q BOX 3006
LODI, CALIFORNIA 952414910
(209) 3345634
FAX OW. 3336796
August 28, 1992
SUBJECT: Request for Qualifications (RFQ)
Civic Center Improvements
THOMAS A. PETERSON
City Manager
ALICE M. REIMCHE
City Clerk
BM MWATT
City AM -my
The City of Lodi is interested in developing a list of qualified architects
for providing the City with facilities programing services, schematic
design, preparation of plans and contract documents, and assisting in
construction administration for the remodeling of the two-story,
unreinforced masonry City Hall structure at 221 West Fine Street, and the
single -story structure at 212 West Fine Street. The total scope of this
work is discussed below. These services are being sought from only
qualified Lodi and Stockton architects.
BACKGROUND: The City of Lodi recently prepared a Governmental Center
Master Plan which includes expansion alternatives for the City Hal7
facilities. This document is on file in the Public Works Department.
It has been determined that in order to provide the additional square
footage required, the existing City Hall will be remodeled to meet a??
ADA and structural requirements and that we will, on an interim basis
(10 years :tY, lease and remodel the building across the street at
212 West Pine Street. Ultilwately, the City will be constructing a major
addition to the existing City Hall.
SELECTION PROCESS: The City of bods will be pursuing a three -stage
selection .process. The first stage will consist of review of the responses
to this RFQ by a selection committee. The comnittee will then develop a
list of no more than five qualified firms.
In the second stage, the qualified firms will be invited to submit a
detailed proposal for providing consultant services for this project. The
selection comnittee, after reviewing the detailed proposals, will narrow
the field of architects to be invited to give an oral presentation.
Depending on the number of qualified firms determined in the first stage,
this stage may be combi:ied with the third stage (oral presentation).
The third stage, the final selection process, will consist of an interview
with the selection committee, including an oral presentation by the
selected architects. The selection committee's recommendation will be
forwarded to the City Council for approval.
LRFQCIVC/TXTW.02M
August 28, 1992
Page 2
SCOPE OF WORK: The use of 212 West Pine Street is an interim solution to
the City's ultimate space needs. As indicated in the master plan, the
ultimate solution is to provide an addition to the existing City Hall
complex. Therefore, any remodeling of the existing City hall facility must
be coordinated with the future addition design. In general, we see the
scope of work including the following four areas:
1. 212 West Pine Street - It is anticipated that the remodeling of
this 7,300 square foot facility will include:
° programing services
° development of schematic design
° preparation of plans and specifications, including:
ADA requirements
° interior building and HVAC improvements
° computer cabling connection to City Hall
° assistance in contract administration
° preparing design and layout of office systems
2. 221 West Pine Street (City Hall Remodel) - It is anticipated
that the remodel ot the existing threefloorCity Hall facility,
approximately 19,600 square feet, wilt include:
° programming services
° development of interim and ultimate floor plans
° preparation of plans and specifications, including:
elevator and other ADA requirements
° structural upgrade
° HVAC upgrade
° assistance in contract administration
3. 221 West Pine Street (City Hall Addition) - This facility is
anticipated to be a two-story structure of approximately 15,000
square feet locatae north of, and connected to, the exfsting City
Hall by a galleria. It is anticipated that the work required on
this addition, in order to develop the remodel plans of City
Hal?, will include:
° development of conceptual floor plans, elevations and
.sections necessary to establish utility elevator and
public access locations
4. TeEporary Relocation - With the completion of the remodel at
712 West Pine Street, some of the City Hall employees will be
moved to this location. In order to remodel the City Hall
facilities, the remaining employees will have to be housed in
temporary trailer/modular structures to be located in the mall
area of City Hall. It is anticipated that this work will
i ncl ude :
LRFQCIVC/TXTW.02M
/-.
August 28, 1992
Page 3
° design and bid documents for trailer or modular
structure layout, ramps and decking
° design for temporary utility connections
STATEMENT OF QUALIFICATIONS: The statement of qualifications shall include
the following:
a) The response shall be mailed to:
City of Lodi
Attn: Dennis Callahan
Building and Equipment Maintenance Superintendent
P, 0. Box 3006
lodi, CA 95241-1910
b) Submittal deadline: Monday, September 21, 1992, 12 noon
c) Size: 8 1/2" by 11" format, maximum of eight pages
d) Copies: Eight
e) Size and composition of firm and major subconsultants proposed
for the design team
f) Mame(s) and resume(s) of the project architect(s) who will be
assigned to this work
g) Statement of experience describing recent projects of similar
type and scope, including project name. location, and client
reference and phone number
h) Firm's experience in providing programming services and
space planning
i) Finn's experience in renovation projects
j) Firm's experience with historical renovation and the Los Angeles
Historical Code related to unreinforced masonry structures
k) Firm's experience in construction observation services for this
type of project
PROJECT SCHEDULE: The City is desirous of moving on this project as
quickly as 'ossible due to its present overcrowding problem. ADA
requirementE, and HVAC deficiencies. The City presently has the
money available for the design and remcdeiing of the facilities at
212 and 221 West Pine Street.
if you have any questions concerking this RFQ, please contact:
Dennis Callahan, Building and Equipment Maintenance Superintendent,
at (209) 333-6706.
Jack L. Ronkso
Public Works Director
JLR/lm
cc: City Manager
Selection Committee
Building and Equipment Maintenance Superintendent
LRFQCIVC/TXTW.02M
&NAME
&ATTN
&ADD
&CITY
Architechnica
555 W. Benjamin Holt U
Suite 423
Stockton, CA 95207
Architecture 2
Clinton Jew, Architect
3768 W. SenJamin Holt Dr
Stockton, CA 95209
Mr. Stephan, Castellanos
Architect
777 M. Pershing Avenue
Stockton, CA 95203
Crus Design Corp.
Ambitects
1625 W. March Ln., Ste. S.
Stockton, CA 95207
Dahlin Group, Inc.
Arch i te-cts
28W W. March Ln.
Stockton, CA 95207
W.'. S:ott Dasko
Architect
712 Peach Street
Lodi, CA 95242
D!erivi-Castel lanos
Architects
94b North Yosemite
Stocktdn, CA °5203
ft. Linda Derivi
!krchitect
777 N. Pershing Ave.
Stockton, CA 95203
Mr. Michael R. Donaldson
Architect
2W Pacific Avenue
Stockton, CA 95204
Ernst & Lloyd Architects
2132 N. E1 Dorado
Stockton, CA 95204
Mr . Xichael D. Carr
A-chitect
2468 W. Swain Rd
Stockton, CA 95207
Gideon Architect
P. 0. Box 55304
Stockton, CA 95205
Itaya-Espalin & Associates, Inc.
Architects
1109 North Center
Stockton, CA 95202
Kikuchi Della 'Monica & Associates
Architects
617 S. Leer Sacramento Road
L o d i, CA 95242
Lesovsky 0,,jnaldson
Architects
2540 Pacific Avenue
Stockton, CA 95204
Mr. Frank B. Mansfield
Architect
222 Wei Lockeford St.
Lodi, CA 95240
Ar. Edward Charles Merlo
Architect
165 W. Cleveland
Stockton, CA 95204
Yalden J. Moll Architect, Inc.
1833 W. March Lane
Stockton, CAS 95207
Mr. Paul A. Nichols
Architect
P. 0. Box 311
Stockton, CA 95201
ski
RX -S Professional Consultants, Inc.
Attn: Bob Snyder
4118 Coronado Avenue
Stockton, CA 95204
San Joaquin Design Group
Architecture & Planning
7565 N. Pershing Ave.
Stockton, CA 95207
W. Dean E. Trachiotis
Architect
1128 N. Union
Stockton, CA 95205
W. David Vizcarra
Architect
P. 0. Box 7463
Stockton, CA 95207
Wenell Mattheis Bowe
Architects
222 W. Lockeford St., 49
Lodi, CA 95240
Ms. Lisa Wong
Architect
704 N. Stockton St.
Stockton, CA 95203
Warren C. T. Yong & Associates
Arch tests
414 E. Fremont
Stockton, CA 95202