Loading...
HomeMy WebLinkAboutAgenda Report - September 16, 1992 (62)J CITY OF LODI @WC& COMMMATM AGENDA TITLE: Purchase 60-12kV Power Transformer with LTC (EUD 93-6) MEETING DATE: September 16, 1992 SUBMITTED BY: Electric Utility Director - That the City Council adopt the attached resolution awarding the bid for the purchase of one 60-12kV power transformer with LTC to the low bidder Cooper Power Systems, Inc., Canonsburg, PA, in the amount of $300,992.08. BACKGROUND INFORMATION: On August 5, 1992, the City Council approved specifications and authorized advertisement for bids. Bids were opened on August 28, 1992 with the results shown on the attached tabulation. This power transformer will be installed at McLane Substation as replacement for a failing regulator unit. Based on bid prices received earlier on two separate occasions for replacement of the failing regulator and reduced losses due to improved materials and construction techniques in new units, a replacement of the existing transformer/regulator combination, with this power transformer, is the most economical alternative over the design life of the equipment. Due to the very favorable bids received, this alternative is even more advantageous to the City. Transformers, in a bid evaluation, are ranked based on life -cycle cost. The life -cycle cost is the sum of the purchase price and the cost of losses over the life of the unit. In the case of power transformers, other factors such as extended warranties and costs associated with handling of the unit during installation (oil filling) are also considered in the life -cycle cost. FUNDING: Included in the Department's 1992-93 fiscal year budget Henry J. RicLE Electric Utility Director Prepared by: Hans Hansen, Assist. Electric Utility Director Attach. c: Purchasing Officer APPROVED THOMAS A. PETERSON City Manager CC -1 CC92-6/CO.COM RESOLUTION NO. 92-161 ssssssazsasasaszsasaa A RESOLUTION OF THE L0DI CITY COUNCIL AWARDING THE BID FOR THE PURCHASE OF ONE 60-12KV POWER TRANSFORMER (EUD92-6) FOR THE ELECTRIC UTILITY DEPARTMENT :��sssssassasasssssszzssssasass:aasaasaasaasasssaasaaasaasassaassasza wHEREAS, in answer to notice duly published in accordance with lav and the order of this City Council, sealed bids were received and publicly opened on August 28, 1992, at 11:00 a.m. for the bid for one 60-221CV` Power Transformer (EUD92-6), described in the specifications therefor approved by the City Council on August 5, 1992; and WHEREAS, said bids have been compared, checked, and tabulated and a report thereof filed with the City Manager as shown on the attached Bid Evaluation (Exhibit A). WHEREAS, the City Manager recommends that award of the bid for one 60-12KV Power Transformer with LTC (BUD 92-6) be awarded to the low bidder Cooper Power Systems, Inc., Canonsburg, PA; NOW, THEREFORE, BB IT RESOLVED by the Lodi City Council that award of the bid for one 60-12KV Power Transfermer with LTC (EUD 92-6)be and the same is hereby awarded to Cooper Power Systems, Inc., in the amount of $300,992.08. Dated: September 16, 1992 assassaasmbssassssasaasasasaaaaasaaasmmaaaaaszasaaasasasasaaasaaasxa I hereby certify that Resolution No. 92-161 was passed and adaptedbjr the City Council of the City of Lodi in a regular meeting held September 16, 1992 by the following vote: Ayes: Council Members - Hinchman, Pennino, Sieglock and Pinkerton (Mayor) Noes: Council Members - None Absent: Council Members - Snider 92-161 RES92161/TXTA.02J Alice M. Reimche City Clerk EUD92.6/CO.COM Extended Install. BID EVALUATION ' Cost 60-12KV POWER TRANSFORMER WITH LTC Credit (Oil) Cost EUD 92-6 0 0 $5099592.08 30 0 Load Load Cost -$4,000 Bid Price Loss Loss of Manufacturer Incl. Tax (KW) (KW) Losses Cooper Power Systems, Inc. s -829000 $2,000 760,640.00 Canonsburg, PA $300,992.08 11.5 69.8 $708,600 General Electric Co. Issaquah, W4345,877.50 12.4 66.0 206,400 MagneTek Waukesha , WI 361,719.98 12.4 68.7 211,800 Federal Pioneer Limited Winnipeg, Manitoba 420,763.75 18.2 54.5 218,200 ABB Power T&D St. Louis, MO 534,440.00 17.3 61.2 226,200 EUD92.6/CO.COM Extended Install. r` Warranty Cost Life Cycle Deli ve►y. Credit (Oil) Cost Weeks 0 0 $5099592.08 30 0 0 552,277050 29 -$4,000 0 569,519.98 32 0 $2,000 640,963075 37 -829000 $2,000 760,640.00 26 . Z�' c�