Loading...
HomeMy WebLinkAboutAgenda Report - September 7, 2011 C-08AGENDA ITEM fe 049 CITY OF LODI COUNCIL COMMUNICATION AGENDA TITLE: Adopt Resolution Approving the Purchase of Padmount Transformers from HEES Enterprises, Inc., of Astoria, OR and Howard Industries Inc., of Laurel, MS ($44,513.69) MEETING DATE: September 7, 2011 PREPARED BY: Electric Utility Director RECOMMENDED ACTION: Adopt a resolution approving the purchase of padmount transformers from HEES Enterprises, Inc., of Astoria, OR and Howard Industries Inc., of Laurel, MS ($44,513.69). BACKGROUND INFORMATION: On April 6, 2011, the City Council authorized the advertisement of bids to procure padmount transformers to maintain inventory for the replacement of damaged/old transformers in the distribution system. On August 10, 2011, bids were opened with six suppliers submitting proposals. Life -cycle costs (total purchase price plus cost of operation based on estimated power loss during the projected life of the transformer) were evaluated for the responsive bids as shown on the attached summary. HEES Enterprises, Inc., of Astoria, OR, and Howard Industries Inc., of Laurel, MS submitted responsive bids with the lowest life -cycle costs as shown below. 10 each 50kVA, 1 -Phase 240/120V HEES Enterprises, Inc. $18,608.43 5 each 100kVA, 1 -Phase, 240/120V Howard Industries, Inc. $15,041.90 2 each 112.5kVA, 3 -Phase, 480/277V Howard Industries, Inc. $10,863.36 FISCAL IMPACT: Purchase cost is $44,513.69. Life -cycle cost is $65,277.43 FUNDING: Included inFY2011/12 Budget Account No. 160.1496 Jordan Ayers Deputy City Manager/Internal Service Director PREPARED BY: Weldat Haile, Senior Power Engineer EAKNVHAst r 04 0100 6/' , Xz' r izobetM A. Kirkley Electric Utility Director APPROVED: r Ko radt Bartlam, City Manager RESOLUTION NO. 2011-138 A RESOLUTION OF THE LODI CITY COUNCIL AWARDING THE BID FOR THE PURCHASE OF PADMOUNT TRANSFORMERS . WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened on August 10, 2011, at 11:00 a.m. for the purchase of polemount transformers for the Electric Utility Department, described in the specifications therefore approved by the City Council on April 6, 2011; and WHEREAS, said bids have been compared as to life -cycle costs, checked, and tabulated and a report thereof filed with the City Manager as shown on Exhibit A attached; and WHEREAS, the bids meeting the City's specifications with the lowest estimated life -cycle costs are shown below: 10 each 50kVA, 1 -Phase 240/120V HEES Enterprises, Inc. $18,608.43 5 each 100kVA, I -Phase, 240/120V Howard Industries, Inc. $15,041.90 2 each 112.5kVA, 3 -Phase, 480/277V Howard Industries, Inc. $10,863.36 NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby authorize the bid for the purchase of padmount transformers as shown above, in the amount of $44,513.69. Dated: September 7, 2011 ------------------------------------------------------------------ ------------------------------------------------------------------ hereby certify that Resolution No. 2011-138 was passed and adopted by the City Council of the City of Lodi in a regular meeting held September 7, 2011, by the following vote: AYES: COUNCIL MEMBERS —Hansen, Katzakian, Mounce, Nakanishi, and Mayor Johnson NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — None ABSTAIN: COUNCIL MEMBERS — None �Wl City Clerk 2011-138 09-07-11 WH Padmount-Attach.xls EXHIBIT A -PAD MOUNTED TRANSFORMER 13113 EVALUA I wry AgUSL 7U, LU"1"1 Transformer Bid Evaluation Bid Opening: August 12, 2011 Padmount Tax (factor): 1.0775 Primary Windings: Three -Phase, 12000 Volt, 60Hz, Delta Connected No Load Loss $/watt: 3.75 Single -Phase, 12000 Grd. e/6930 Volt, 60Hz For 09/7/2011 Council Meeting Load Loss $/watt: 1.25 Bid Item 1: 50 kVA, 240/120 Volt, Single Phase Pad Number of units: 10 28 >1.5 Vendor Unit Extended Price No Load Load No Load Load Cost of CycleDeliveryHeight M28,645.93 Im edance Price $ Price $ w/tax $ Loss (watts oss watt Loss value Loss value Losses $ weeks inches % Hees Enterprises Inc. Ermco Transformers) 1,727.00 17,270.00 18,608.43 106 485 3,975.00 6,062.50 10,037.50 8-10 281 32 1.600 2.600 Howard Industries Inc. Silicon Core 1,835.001 18,350.00 19,772.131 111 504 4,162.50 6,300.00 10,462.50 30,234.63 6-8 32 2.000 Howard Industries Inc. (Amorphous Core 1,926.00 19,260.00 20,752.651 1,612.50 6,937.50 8,550.00 29,302.65 6-8 CG Power System USA Inc. No Offer 1,935.00 0.00 19,350.00 0.00 20,849.63 102 454 0.00 3,825.00 0.00 5,675.00 0.00 9,500.00 0.00 30,349.63 9-11 24 1.760 Pacific Utilities ABB, Inc. HD Supply Utility 1,892.00 18,920.00 20,386.30 93 571 3,487.50 7,137.50 10,625.00 31 011.30 12 241 2.410 Bid Item 2: 100WA, 2401120 Volt, Single Phase Pad, Number of units: 5 28 >1.8 Vendor Unit Extended Price No Load Load No Load Load Cost of Life Cycle Delivery Height Im edance Price $ Price $ w/tax $ oss watts oss watt Loss value Loss value Losses $ Cost $ weeks inches Hees Enterprises Inc. Ermco Transformers 2,440.00 12,200.00 13,145.50 185 863 3,468.75 5,393.75 8,862.50 22,008.00 8-10 6-8 28 1.900 32 2.500 Howard Industries Inc. Silicon Core).2,647.00 13,235.00 14,260.71 194 821 3,637.50 5,131.25 8,768.75 23,029.46 21,923.15 6-8 32 2.000 Howard Industries Inc. Am r hous Core 2,792.00 13,960.00 15,041.90 74 879 1,387.50 5,493.75 6,881.25 CG Power System USA Inc. No Offer 0.00 0.00 0 13,630.38 147 0 924 0.00 2,756.25 0.00 5,775.00 0.00 8,531.25 0.00 22,161.63 9-11 24 1.680 Pacific Utilities ABB, Inc. 2,530.00 2,575.00 12,650.00 12,875.00 13,872.811 137 9981 2,568.751 6,237.501 8,806.251 22 679.06 121 301 2.300 HD Supply Utility Bid Item 3: 112.5 kVA, 480/277 Volt, Three Phase Pad, Number of units: 2 65 >1.8 Vendor Unit Extended Price No Load Load No Load Load Cost of Life C cle Delive Hei ht Im edance Price $ Price $ w/tax $ oss watts oss watt Loss value Loss value Losses $ Cost $ weeks inches Hees Enterprises, Inc. Ermco Transformers) 5,365.00 10,730.00 11,561.58 262 1046 1,965.00 2,615.00 4,580.00 4,987.50 16,141.58 8-10 15,624.58 6-8 49 4.000 45 2.300 Howard Industries Inc. Silicon Core 4,936.00 9,872.00 10,637.08 267 1194 2,002.50 757.50 2,985.00 3,037.50 3,795.00 14,658.36 6-8 49 2.5 Howard Industries Inc. Am r hous Core 5, 41.001 10,082.00 10,863.36 I101 98.791 302 1215 I1198 2,265.00 2,995.00 5,260.00 15,058.79 7-9 48 2.300 CG Power System USA Inc. 4,547.00 6,045.00 9,094.00 12,090.00 1 13,026.98 264 846 1,980.00 2,115.00 4,095.00 17,121.98 9-11 47.94 2.660 Pacific Utilities ABB, Inc. 6,540.00 13,080.00 14,093.70 278 1171 2,085.00 2,927.50 5,012.50 19,106.20 12 2.760 D Supply Utility Total Price Total LCC c. Ermco Transformers [He 43,315.50 66,795.50 68,88867 nc. Silicon 44,669.92 65,884.16 Inc. Amorphous 46,657.91 9,798.79 Less Bid Items 1 8 14,658.36 Less Bid Items 1 & CG Power System USA Inc. 69,633.23 Pacific Utilities 47,506.98 72,796.56 HD Supply Utility Total Lowest Cost 48,352.81 44,513.68 Total Lowest Lifecycle Cost 65,227.43 Prepared by: Weldat Haile P.E. Senior Power Enginner BSU Account No. 160.1496 09-07-11 WH Padmount-Attach.xls