Loading...
HomeMy WebLinkAboutAgenda Report - September 5, 1990 (69)e COUNCIL C1 TO: THE CITY COUNCIL " FROM: THE CITY MANAGER'S OFFICE RJBWr'. PURCHASE OF 56 POLEMOUNT TRANSFORMERS COUNCIL MEETING DATE NO. SEPTEMBER 5, 1990 RECOMMENDED ACTION: That the City Council award the bid for the purchase of 56 polemount transformers to the bidders whose roposals and equipment met all Electric Utility Department specifications, and whose transformers yielded the lowest overall life -cycle costs: Cooper Power Systems, Burlingame: 6 ea 15 KVA.Circuit Protected $ 3,257.63 11 ea 15 KVA Conventional 5,177.56 9 ea 37.5 RVA Conventional 6,770.25 3 ea 37.5 KVA Conventional, 277V 2,234.44 3 ea 50 KVA Conventional, 277V 2,256.75 3 ea 50 KVA Conventional 2.820.94 3 ea 75 KVA Conventional, 277V 5,227.50 TOTAL $27,745.07 Westinghouse Utilities, Concord: 18 ea 25 KVA Conventional $11,704.50 GRAND TOTAL, POLEMOUNTS $39,449.57 BACKGROUND INFORMATION: On June 6, 1990, the City Council approved specifications and authorized advertisement for bid. Bids were opened on August 7, 1990. A summary of the results of the bid and of the evaluation are shown on Attachment 1. Transformer proposals are evaluated by combining estimated costs of t losses during operation with the bid price to yield an estimated total life -cycle cost. Bidders proposing equipment which have the lowest life -cycle cost while meeting specifications are recommended to be awarded the bid. Funding for this purchase is available in the Electric Utility Department's Operating Fund. J e Harris P chasing 0 f ficer cc: Electric Utility Director Assistant Electric Utility Director Electrical Engineer RESOLUTION NO. 90-137 ' A RESOLUTION OF THE L00I CITY COUNM AWARDIlVC THE BID FOR THE PURCHASE OF 56 POLE -MOUNT TRANgUOA ZS VEW_A� in answer to notice duly puolished in accordance with law and the order of this City Council, sealed bids were received and publicly opened on August 7, 1990 at 11:00 a.m. for the bid for the purchase cf 56 pole -mount transformers, described in the specifications therefor approved by the City Council on June 6, 1990; and W11atM said bids have been compared, checked, and tabulated and a report thereof filed with the City Manager as shown on Exhibit A attached hereto: and WHEREAS,, the City Manager recommends that award of the bid for 56 pole -mount transformers, be made to bidders whose proposals and equipment met all specifications and yielded the lowest overall life -cycle casts, as follows: Cooper Power Systems, Burlingame 6 Ea 15 KVA Circuit Protected S 3,257.63 11 Fa 15 KVA Conventional 5,177.56 9 Ea 37.5 KVA Conventional 6,770.25 3 Ea 37.5 KVA conventional 277V 2,234.44 3 Ea 50 KVA Conventional 277V 2,256.75 3 Ea 50 KVA Conventional 2.820.94 3 Ea 75 KVA Conventional 277V 5 227.50 Total $27,74tO7 Westinghouse Utilities, Concord 18 Ea 25 KVA Conventional 511,704.50 GRAND TOTAL $39,449.57 NOW, THEREFORE, BE IT RESOLMD by the Lodi City Council that award of bid for 56 pole -mount transformers be and the same is hereby awarded as shown above in the amount of $39,449.57. Dated: September 5, 1990 I hereby certify that Resolution No. 90-137 was passed and adopted by the City Council of the City of Lodi in a regular meeting held September 5, 1990 by the following vote: Ayes : Council Members - Olson, Pinkerton, Reid and Snider (Mayor) Noes : Council Members - None Absent: Council Members - H i n0ma n ;�j�,Cc• Ih l,�GYc�.:� Alice M. Re imche City Clerk 90-137 RES90137/TXTA.02J 0 FOOTNOTES: * BIDS RECEIVED ARE TOTAL BID PRICES FOR EACH SIZE, TAXES INCLUDED, DELIVERED (1) ERMCO DISQUALIFIED DUE TO LACK OF SERVICE FACILITIES WITHIN 200 MILES OF LODI. (2) WESTERN STATES' PROPOSAL FAILS TO PROVIDE TEST DATA AT OR BEFORE TIME OF SHIPMENT OF TRANSFORMERS; PROPOSED PRESSURE RELIEF VALVE DIFFERS FROM SPECIFICATIONS; PRICE QUOTED IS F,0.6. PLANT, FREIGHT ALLOWED (SPECIFICATIONS ARE F.O.B. DEL'D). ATTACHMENT 1 SUMMARY BIDS RECEIVED -/LIFE CYCLE COSTS POLEMOUNTED TRANSFORMERS BIDS OPENED AUGUST 7, 1990 COOPER POWER WESTINGHOUSE ERMCO BEST. STATES BURLINGAMIE CONCORD TENNESSEE PORTLAND TRANSFORMER DESCRIPTION------------ ------------ ------------ ------------- 6 EA 15KVA CP, 120/240V $3,251.63/ $3,525.37/ $3,442.) 50/ $3,506}25/ $6,821.63 $6,933.37 $5,962.50 $7,262.25 11 EA 15KVA, CONV, 120/240V $5,177.56/ $5,960.62/ $5,715.19/ $5,528.18/ $11_,46.56 $11,856.62 $12,403.19 $12,128.18 18 EA 25KVA, CONY, 120/240V $9,925,88/ $11,704.50/ $10,308.38/ $10,614.37/ $26,341,88 $25,708.50 $28,416.38 $27,498.37 9 EA 37.5KVA, CONV, 120/240V $6,770,25/ $6,789.37/ $7,334.44/ $6,722.43/ $17 .25 $17,571.37 $18,134.44 $18,368.43 3 EA 37.5KVA, CONY, 277V $2,234.44/ $2,642.44/ $2,518.13/ $2,543.62/ $5,766.44 $5,912.44 $6,022.13 $5,873.62 3 EA 50KVA, CONV, 277V $2,256.75/ $2,585.06/ $2,613.75/ $2,703.00/ $7,110.15 $7,235.06 $7,335.75 $7,353.00 3 EA 50KVA, CONV, 120/240V $2,820,94/ $2,476.69/ $2,572.31/ $2,817.75/ S2,19-.94 $7,228.69 $7,486.31 $7,401.75 3 EA 75KVA, CCNV, 277V $5,227.50/ $4,080.00/ $3,923.81/ $3,904.68/ $12,;17.50 $10,380.00 $10,085.81 $9,904.68 FOOTNOTES: * BIDS RECEIVED ARE TOTAL BID PRICES FOR EACH SIZE, TAXES INCLUDED, DELIVERED (1) ERMCO DISQUALIFIED DUE TO LACK OF SERVICE FACILITIES WITHIN 200 MILES OF LODI. (2) WESTERN STATES' PROPOSAL FAILS TO PROVIDE TEST DATA AT OR BEFORE TIME OF SHIPMENT OF TRANSFORMERS; PROPOSED PRESSURE RELIEF VALVE DIFFERS FROM SPECIFICATIONS; PRICE QUOTED IS F,0.6. PLANT, FREIGHT ALLOWED (SPECIFICATIONS ARE F.O.B. DEL'D). ATTACHMENT 1