HomeMy WebLinkAboutAgenda Report - August 17, 2011 C-05AGENDA ITEM C05
CITY OF LODI
COUNCIL COMMUNICATION
Im
AGENDA TITLE: Adopt Resolution Authorizing City Managerto Execute Contract Change Order No. 1
with A. M. Stephens Construction Company, Inc., for 2011 Disabled Access
Improvements Project ($64,278)
MEETING DATE: August 17,2011
PREPARED BY: Public Works Director
RECOMMENDED ACTION: Adopt resolution authorizing City Managerto execute Contract
Change Order No. 1 with A. M. Stephens Construction Company,
Inc., for 2011 disabled access improvements project in the amount
of $64,278.
BACKGROUND INFORMATION: On July 20,2011, City Council awarded the 2011 disabled access
improvements project to A. M. Stephens Construction Company, Inc.,
of Lodi, in the amount of $59,572.30. This project is part of the City
of Lodi's 2009 Community Development Block Grant Recovery
(CDBG-R) allocation and consists of the modification of existing parking stalls for the purpose of
constructing Americans with DisabilitiesAct (ADA) compliant accessible parking stalls. The project cost
($71,000) is significantly lower than the allocated CDBG-R funds ($140,000). Staffrecommends
amending the contract to include Contract Change Order No.1 to install additional wheelchair ramp
improvements with in the Block Grant area.
Contract Change Order No. 1 would install additional wheelchair ramps at the following locations:
1. The southeast corner of Pine Street and Main Street. (This is the remaining corner at this
intersection which does not have a wheelchair ramp.)
2. All four corners at PleasantAvenue and Louie Avenue.
The cost of the additional work is $64,278.
FISCAL IMPACT: Not applicable.
FUNDING AVAILABLE: 2009 CDBG-R Funds: $64,278
CA4a��
Jordan Ayers
Deputy City Manager/Internal Services Director
F. Wally Wdelin
PublicWor s Director
Prepared by Lymain Chang, Senior Civil Engineer
FWS/LC/Dmf
cc: Neighborhood Services Manager
Senior Civil Engineer
City Manager
K:\WP\PROJECTS\STREETS\HANDICAP\201ldisabledaccess\C CCO1,doc
8/9/2011
CITY OF LODI
PROPOSED CHANGE ORDER AND REQUEST FOR PROPOSAL
PROJECT. Cite of Lodi 2011 ADA Improvenients C,0.N0
PCONO 1
CONTRACTOR: A.M. Stephens RFI NO:
ARCIHTECT/ENGiNEER: Lynlan Chan; FINO:
Chang Submit Proposal Within 15 Days Upon Receipt of This Request
Brief Description Of Work
Demo and off -haul existing concrete from 5 corners. Subgrade for new concrete ramps and walks. Install new storm
drain and inlets at Pine & Main. Place new concrete per drawings. Install decomposed granite. Patch pave at all 5
comers.
Requesting Official: Date of Request: Schedule Impact Days
Saw cut and demo concrete
$8,600.00
Subgrade for concrete
$5,840.00
Place decomposed granite
$600.00
Pave
$10,800.00
Utilities
$8,510.00
Concrete $25,800 x 16%
$29,928.00
Request Proposal, Recommendation And'Appxoyal
Requesting Official: Date of Request: Schedule Impact Days
ContractorProposal Date: Add Amount: $64,278.00 DeductAmount:
Reason For Change: Ar)%Wtivnl RAMQS To OC- 1Ns7Au.vas Account
Requested By:LYMAN e-1AANGt
CONTRACTORAGREES TO FURNISH ALL LABOR AND MATERLALS AND PERFORM ALL WORK REQUIRED TO COMPLETE THE
ABOVE DESCRIBED WORK CHANGE IN ACCORDANCE WITH THE REQUIREMENTS FOR SIMILAR WORK COVERED BY THE
CONTRACT EXCEPT AS OTHERWISE STIPULATED HEREIN FOR TILE STATED CONSIDERATION. TO PERFORM THE CHANGESFOR
THE AMOUNT INDICATED WHICH INCLUDES ANY EXTENDED OR JOBSI.TE OVERHEAD, DISRUPTION, RIPPLE EFFECT AND OTHER
IMPACT COSTS. NO WORK WILL BE STARTED UNTIL THIS PROPOSAL IS ACCEPTED.
ORIGINAL CONTRACT $ 6' 9, 15-7 2.30
Contractor Date
PREVIOUS ADDS $ ,19,.
PREVIOUS DEDUCTS $
Construction Manager Date
THIS CHANGE $ 6 41 2i L7. o
Project Boiler Plate PCO form 8/9/2011
Project Boiler Plate PCO form 8/9/2011
CONTRACT TO DATE $ I J3.1050 .30
Public Works Date
CONTRACT TE%4E ADJUSTMENT _ DAYS
ORIGINAL CONTRACT
COMPLETION DATE:
City Manager Date
ADJUSTED CONTRACT
COMPLETIONDATE:
Project Boiler Plate PCO form 8/9/2011
08/04/2011 87:48 20995413758 POPUCH CONCRETE PAGE 01/01
Z:uch
ncrete
tracting
COMMERCIAL • INDUSTRIAL • RESIDENTIAL
License#327940
Estimator & contact for bid day: John Popuch - 209-993-1633 Date 8/4/2011
Project name: Cites of Lodi Handicap Ramos
Inclusions:
• Furnish & install four handicap ramps at the corners of Pleasant & Louie
• Furnish & install one handicap ramp at the corner of Pine & Main
Exclusions:
• Staking & surweyiaug
• Sawcutting & demon
• Sealants & caulldng
• Grading and AR
• Backfill &. compaction
• Masonry, Light standards, bollards
• Bond, permits, inspections, SWPP
• All other. concrete
Base bid amount: $25,800
All grades within oue tenth
Spoils stockpiled an site
Price good for 30 days
P.O. Box 2570 - Lodi, CA 95241
Tel. (209) 389-0829 Fax (209)367-0865 • Cell (209) 993.1633
RESOLUTION NO. 2011-129
A RESOLUTION OF THE LODI CITY COUNCIL
AUTHORIZING CITY MANAGER TO EXECUTE CONTRACT
CHANGE ORDER NO. 1 WITH A. M. STEPHENS
CONSTRUCTION COMPANY, INC., FOR 2011 DISABLED
ACCESS IMPROVEMENTS PROJECT
WHEREAS, on July 20, 201 1 ,City Council awarded the 201 1 Disabled Access
Improvements Project to A. M. Stephens Construction Company, Inc., of Lodi, in the
amount of $59,572.30; and
WHEREAS, this project is part of the City of Lodi's 2009 Community
Development Block Grant Recovery (CDBG-R) allocation and consists of the
modification of existing parking stalls for the purpose of constructing Americans with
DisabilitiesAct (ADA) compliant accessible parking stalls; and
WHEREAS, the project cost ($71,000) is significantly lower than the allocated
CDBG-R funds ($140,000) and staff recommends amending the contract to include
Contract Change Order No.1 to install additional wheelchair ramp improvements within
the Block Grant area.
NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby
authorize the City Manager to execute Contract Change Order No. 1 with
A. M. Stephens Construction Company, Inc., of Lodi, California, for the 2011 Disabled
Access Improvements Project to install additional wheelchair ramp improvements within
the Block Grant area in the amount of $64,278.
Dated: August 17, 2011
-------------------------------------------------------------------
-------------------------------------------------------------------
hereby certify that Resolution No. 2011-129 was passed and adopted by the
City Council of the City of Lodi in a regular meeting held August 17, 2011, by the
following vote:
AYES: COUNCIL MEMBERS — Hansen, Katzakian, Mounce, Nakanishi,
and MayorJohnson
NOES: COUNCIL MEMBERS — None
ABSENT: COUNCIL MEMBERS— None
ABSTAIN: COUNCIL MEMBERS— None
r
OHL
City Clerk
2011-129