HomeMy WebLinkAboutAgenda Report - August 7, 1991 (83)01
y OF
Cil( OF LOM
i
COUNCIL COMMUNICATION
AGENDA TITLE: Contract Award for Church Street Reconstruction Swain Drive to
Kettleman Lane
NE IYD G DATE: August 7, 1991
PREPARED BY: Public Weis Director
RECOMMENDED ACTION That the City Council adopt the attached resolution awarding the
contract (Base Bid and Alternate B) for the above project to
Claude C. Wood Company in the amount of $207,104.50 and
appropriate $58,000 from the Gas Tax Fund to Complete the
Project.
BACKGROUND INFORMATION: This project will include the reconstruction of Church
Street between Swain Drive and Kettleman Lane, install new curb, gutter, and
sidewalks on west side of the unimproved section of Church Street, and other
miscellaneous and related works, all as shown in the plans and specifications of
this project.
Alternates A and B are different structural sections. Alternate A is a street
section of asphalt concrete and aggregate base. Alternate B is a full depth asphalt
concrete section.
We are asking that an additional $58,000 be appropriated from the Gas Tax fund to
complete this project. Once Church Street is reconstructed, the City will be
selling the parcel at 1775 South Church Street. Honey from this sale will be
returned to the Gas Tax fund.
Plans and specifications for this project were approved on July 17, 1991. The City
received the following 3 bids for this project:
Bidder
Engineer's Estimate
Claude C. Wood Company
Granite Construction
Teichert Construction
APPROVED.
Location Base Bid & A 1-t. B
$247,306.00
Lodi $207,104.50
Watsonville $230,276.00
Stockton $237,906.60
THOMAS A. PETERSON
City Manager
545
cc -1
CACHRCH/TXTW.02M (CO. COM) July 31, 1991
Council Communication
Contract Award - Church Street Reconstruction
August 7, 1991
Page 2
FUNDING: Originally Budgeted: 1989
Budgeted Fund: Transportation Development Act . Gas Tax
Current Appropriation: $190,500.00
Total Project Estimate: $248,500.00
Bid Opening Date: July 31, 1991
ck\L. Ronsko
b1'c Works Director
Prepared by Lyman Chang, Junior Civil Engineer
JLR/LC/cl
Attachment
cc = Purchasing Officer
CACHRCH/MW.02M (CO3 COM) July 31, 1991
Public works Department
Tabulation of BMs Reedved 7/31/91
Project: Church Street Reconstructir n, Swain - Kettleman
item Description Oty. Unit
BASE BtD
Engineers Estimate Claude C. Wood Co. GraniteConstruction Teichert Construction
Price Total Price TOW Price Total Price Total
1
Clearing and Grubbkng
1
LS
$1 t,000.00
2
Abandon D.I.C.B
3
EA
200.00.
3
CompactOrignal Ground
98,400
SF
020
4
Misc. Concrete Subgrade Compaction
5,840
SF
1.40
5
Pavement Grinding (6.0' x .10', Taper)
240
LF
5.00
6
Pavement GrkxkV (3.6 x ", Level)
38
LF
15.00
7
Vertical Crib & Gutter
710
LF
16.00
8
Ddvsvray Type Curb & Gutter
130
LF
18.00
9
Concrete Sidewalk / Driveway
3,5C0
SF
4.00
10-
Adjust Monument F&C to Grade
4
EA
270.00
11
Street S,Qn Post
1
EA
120.00
12
Furnish Water Valve F&C
•1
EA
150.00
13
Ad ust Water Valve F&C to Grade,
24
EA
270.00
14
Install 12' Storm Drain
60
LF
130.00
15
Install Sloe Inlet Catch Basler
2
EA
800.00
16
Furnish Manhole F&C
3
EA
250.00
17
• O
: A*mt Manhole F&C to Grade
T.�If.� /�...d.wl
15
EA
350.00
$11,000.00
1 $13,350.00
58,500.00
$8,500.00
$8.200.00
$8,200.00
6()0.001
170.00
510.00
' 4w.00
1200.00
820.00
2.460.00
19,680.00
0.10
9,840.00
0.20
19,680.00
0.30
29,520.00
8,176.00
2.65
15,476.00
0.40
2,336.00
1.30
7,592.00
1200.00
6.00
1,440.00
5.00
1,200.00
14.00
3,360.00
570.00
24.00
912.00
5.00
190.00
4.20
159.60
10,650.00
12.65
8,981.50
15.00
10,650.00
16.00
11,350.00
2,340.00
13.50
L755.00
30.00
3,900.00
15.00
1,950.00
14,000.00
2.50
8,750.00
3.20
11,200.00
3.30
11,550.00
1,080.00
200.00
800.00
150.00
600.00
300.00
1,200.00
120.00
50.00
50.00
200.00
200.00
220.00
220.00
150.00
150.00
150.00
130.00
130.00
100.00
100.00
6,480.00
200.00
4.800.00
175.00
4.200.00
360.00
8,640.00
7,800.00
50.00
3.000.00
50.00
3,000.00
30.00
1,800.00
1,600.00
670.00
1.340.00
700.00
1,400.00
1,200.00
2.400.00
750.00
225.00
675.00
170.00
510.00
250.00
780.04
5,250.00
200.00
3,000.00
350.00
5,250.00
420.00
6,300.00
10.00 47,240,00 4.50 21,258.001 12.00 56,608.001 625 29,525.00
12.00 48,480.00 15.00 60.600.00 13.50 54,540.00 13.00 52,520.00
32.00 60.800.00 1 32.00 60.800.00 1 28.00 53.200.00 31.70 60.230.00
1 Roadway Excavation (F)' 3,630 CY 12.00 42,3$0.00 5.00 17,650.00 11.00 .830.00 6.50 22,945.00
2 Asphalt Concrete 3.550 TON 30.00 106,500.00I 38 31.50 111,825.00 26.00 92,300.001 29.40 104,370.00
TOTAL BASE BID AND ALTERNATE A $254,966.00 5220,287.50 $263,574.00 $252,866.60
TOTAL BASE BIDAND ALTERNATE B $247,306.00 $207,104.50 5230,276.00 $237,906.60
RESOLUTION NO. 91-149
------------------------
------------------------
A RESOLUTION OF THE LODI CITY COUNCIL
AWARD>IVCi THE CONTRACT FOR CHURCH STREET RE00NSIRUCTI0N -
SWAN DRIVE TO KETTL MN LANE
WHa2EASy
in answer to notice duly
published in accordance with
law and
the order of this City Council,
sealed bids
were received and
publicly
opened on July 31, 1991 at 11:00
a.m. for
the contract for
Church
Street Reconstruction - Swain
Drive to
Kettleman Lane,
described in the specifications therefor
approved by
the City Council
on July
17, 1991; and
WHEREAS, said bids have been compared, checked, and tabulated and
a report thereof filed with the City Manager as follows:
Bidder
Claude C. Wood Company
Granite Construction
Teichert Construction
Location
Base Bid & A 1 t . B
Lodi $207,104.50
Watsonville $230,276.00
Stockton $237,906.60
WHEREAS, the City Manager recommends that award of the contract
for Church Street Reconstruction, be made to the low bidder, Claude
C. Woad Company;
NOW, THEREFORE, BE TT RESOLVED by the Lodi City Council that
award of contract for Church Street Reconstruction be and the same i s
hereby awarded to Claude C. Wood Company, the low bidder, in the amount
of $207,104.50.
Dated: August 7, 1991
I hereby certify that Resolution No. 91-149 was passed and
adopted by the City Council of the City of Lodi in a regular meeting
held August 7, 1991 by the following vote:
Ayes: Council Mernbers - Pennino, Pinkerton, Sieglock, Snider
and H i nchman (Mayor)
Noes: Council Members - None
Absent: Council Members - None
Alice M. Re�mche
City Clerk
RES91149/TXTA.02J
TO: Finance Director
FROM: City Clerk
CITY OF LCDI
SPECIAL ALLOCATION REQUEST
DATE: August 7, 1991
PIZQIDCT NUMBER: NC).D- GZo.oS -399
Request is made for funds to accomplish the following project which was not included in
the current budget:
Description of Proiect Estimated Cost
Funds needed for contract with Jones, Hall, Hill
and White for arbitrage services
Funding
source
Sewer
(If you need more space, use additional sheet and attach to this form)
Date of Approval - 8/7/91 Amount Approved - $8,000
Counci1 XXXXX City Manager
FUND OR ACCOUNT TO BE CHARGED
Current Budget $ Prior Year Reserve $
Contingent Fund $_ — General Fund Surplus $
Capital Outlay Reserve $ Gas Tax Fund $
Uti 1 ity Outlay Reserve $
Hotel/Motel Tax Reserve - $
General Fund Operating Reserve $
Other (Election) $
Fund
t� �r �h
DA'xon Flynn, Fin ce D_� for Alice M. Reimche,
City Clerk
Submit this form in duplicate to the Finance Director. Distribution after approval will
be as follows: 1) Originating Department 2) Finance Department