HomeMy WebLinkAboutAgenda Report - July 17, 1991 (116)CITY OF LODI 'I
AGENDA TITLE: Retention of Consultant
Impact Report for White
Expansion Project
NIE ENG DATE: July 17, 1991
PREPARED BY: Publ ; c Worms Director
for Preparation of Supplemental Environmental
Slough Water Pollution' Control Facility
RECOMMENDED ACTION: That the City Council authorize retaining the firm of Whitley,
Burchett and Associates to prepare a supplemental Environmental
Impact Report (EIR) for the White Slough Expansion Project.
BACKGROUND INFORMATION: The California Regional Water Quality Control Board staff
is presently preparing a National Pollutant Discharge
Elimination System (NPDES) permit for our White Slough
Water Pollution Control Facility Expansion Project.
The present draft NPDES permit prepared by the Regional Board is proposing a 10/10
mg/L for BOD and suspended solids for all White Slough discharges. The City's
present discharge requirements are 20/20 mg/L for BOD and suspended solids in the
summer months, and 30/30 mg/L for BOD and suspended solids in the winter months.
The Regional Board has indicated that they are requiring the 10/10 mg/L discharge
requirement because there was a statement in the City's final EIR document that
indicated that, "Installation of the proposed clarifiers and other components, in
conjunction with aeration system improvements recently completed, would allow the
Water Pollution Control Facility to produce domestic effluent having 10 mg/L or less
of BOD and suspended solids more than 90 percent of the time." It is felt that wben
our my plant expansion comes on-line, NAe will initially be able to meet the 10/10
requirement; however, as the plant approaches 80%capacity (approximately 7 mgd) ,
the City would have to construct sand filters at a cost of $1.5 to $3 millionpplus a
substantial increase in annual maintenance costs in order to meet the 10/10 mg/L
requirement. W have been meeting and negotiating with the Regional Board staff on
this item for some time. The Regional Board's legal counsel has indicated that if
Nie provide additional CEQA documentation on a lesser discharge requirement, they
would be able to modify their proposed 10/10 mg/L discharge requirement.
NIK Burchett and my staff met with the Regional Board staff to discuss what
additional CEQA documentation was needed and the requirements for changing the 1988
EIR. Attached is a proposal from Whitley, Burchett and Associates which
accomplishes this task with the minimum amount of effort. The cost of this work
would be approximately $36,000. The proposal submitted has been reviewed by Lodi's
Community Development Director and it is felt that the procedure proposed is
APPROVED:
THOMAS A. PETERSON Vrl
City Manager
CC -1
CW5-,WPC24/TXTW.02M (C0. COM) July 5, 1991
r--
EIR for White Slough
July 17, 1991
Page 2
appropriate and the employee hours submitted are in line. I feel strongly that the
City should do whatever is possible to reduce the discharge requirements in the
proposed NPDES permit. I would therefore recommend that the City Council approve
the retention of Whitley, Burchett and Associates to accomplish the work shown in
their attached proposal.
FUNDING: 17.2 Wastewater Capital Reserve Fund n
:SJa k L. Ronsko
Pub is Works Director
JLR/mt
Attachment
cc: City Attorney
Water/Wastewater Superintendent
CWSWPC24/TXTW.02M (COMM) July 5, 1991
WHITLEY, BURCHETT
and Associates, Inc.
June 12, 1991
City of Lodi
City MU
221 West Pine Street
Lodi, California 95241
Attention: Jack Ronsko, Public Works Director
Fran Forkas, Water/Wastewater Superintendent
Subject: Proposed Scope and Budget
White Slough WPCF Supplemental EIR
Gentlemen:
..991
Based on our meeting with the staffof the Central Valley Regional Water Quality Control Board, I
have prepared a proposed scope of work and budget for a supplemental EIR for the White Slough
WPCF expansion pmect. This work will be carried out by Whitley, Burchett and Associates,
Inc.(WBA), in associationwith EIP Associates of San Francisco.
We have tied to tailor a scope of wk vilh the minimum effort possible to develop the
information needed by the RWQCB staffto finalize waste discharge requirements for White
Slough WPCF. We believe that the proposed technical analyses, based on statistical analysis of
the city's self-monitoring data, information frnmthe literature and theoretical calculations of future
water quality conditions will be sufficient. •The objective of the analyses will be to determine ifthe
discharge of 20/20 effluent at the design flow of 8S mgd will have a significant impact on the
quality of the receiving waters. It vOl also determine if the expanded facilities will have the
capacity to store or land dispose of the treated effluentwhenever the dissolved oxygen
concentration in the receiving waters falls below 5.0 mg/L, from whatever cause.
We believe that the time schedule presented in our letterof May 71h remains reasonable and will
permit completion of the technical and environmental work necessary to support the required
modifications to the EIR.
Review documents, meet with RWQCB staff and
completeN3tiae of Preparation 2 weeks
Public review and comment for NOP and
technical studies and preliminary environmental 6 weeks (concurrently)
Complete Draft EIR (including city staff review) 6 weeks
Public review and comment period for Draft EIR 6 weeks
Prepare Final EIR (including cby staff review) 4 weeks
Total time 24 weeks
The proposed scope of work, estimated labor requirements and budget are attached for your review
and approval. Estimated labor costs are included at normal WBA and EEP billing rates.
Reimbursible expenses include printing, phone, fax, postage and otipsdirect project related
expenses at cost. Mileage would be billed at $0.25 per mile. If the City prefers, a "not -to -exceed"
fee of $35,800 (including a contingency allowance of 10%), would be acceptable. Billings would
not exceed this amount without prior approval of the city.
33 QUAIL COURT. SUITE 300. WALNUT CREEK, CA 94596 (415) 945-6850
Mf Jack Ronsko
June 6,1991
Page 2
We will be pleased to meet with you and your staff to discuss the details of this proposal at your
convenience. Please call me if you have any questions or to arrange any necessary meetings. We
look fozaard to your favorable consideration of this proposal.
Very truly yours,
WHITLEY, BURL TETT and ASSOCIATES, Inc.
Max E. Burchett, PR
cc: John Davis, ElP Associates
City of Lodi
White Slough WPCF SupplementalElR
PROPOSED SCOPE OF WORK
To determine whether there "I be a significant impact on the beneficial uses of the receiving
waters if revised Waste Discharge Requirements are adopted for the expanded White Slough Water
Pollution Control Facility (WPCF). Revised requirements would be as follows:
BOD5 Susoended Solids
1 June - 15 October 20 mg/L 20 mg/L
16 October - 31 May 30 mg/L 30 mgfL
Methodology:
The analysis ofcurrent and potential future impacts on the receiving waters will be carried out in
four parts:
1. Quantify existing conditions in the receiving waters
2. Quantify existing and fittae effluent characteristics
3. Predict impact of future discharges on the receiving waters
4. Evaluate existing effluent storage and land disposal facilities to accomodate design flow
if receiving water D.O. falls below 5.0 mg/L.
The results of the analytical work will be used to prepare a S upplemental EIR for the current White
Slough WPCF expansion and upgrading project. The revised EIR will provide the basis for the
adoption of final waste discharge requirements for the White Slough WPCF by the Central Valley
Regional Water Quality Control Board
Task Descriptions:
The following tasks will be performed to prepare the required supplemental EIR:
7mc 1 - Existing Receiving Water Conditions. Three separate analyses will be carried
out for this talc.
The fust analysis will quantify the existing conditions in the receiving waters resulting f3mn the
current effluent discharges faun the White Slough treatment plant. Approximately 4 years of
existing self -monitor i ng data will be analyzed for dissolved oxygen levels in Dredger Cut and
Bishop Curt. The data will tre statistically characterized for mean, standard deviation and frequency
of occurrence.
Secondly, a correlation between existing effluent BOD and receiving water D.O. concentrations
will be developed, if possible.
The third analysis will utilize the results of the recently completed dilution study to assess the
impact of physical di ludon on the concentration of BOD, suspended solids and D.O in the
receiving waters. Comparison of the results of the BOD/D.O. correlations from above with the
physical dilution estimates will provide an estimate of the effect of oxygen uptake in the receiving
L )D391 Page 1
6/12/91
waters, the so-called "oxygen sag" effect. In this analysis, any depression of D.O. greater than
would be predicted by physical dilution alone can be attributed to the exertion of BCD in the
receiving waters.
Task 2 - Existing and Future Effluent Characteristics. Existing and future effluent
characteristics will be statistically evaluated in this usk to provide the basis for assessing current
and future impacts cf the White Slough WPCF discharge on the receiving waters.
Actual White Slough WPCF effluent quality data for a minimum of two years will be evaluated for
mean, standard deviation and frequency cf occurrence. The results of this analysis will be
compared with published data f3m the literature for other activated sludge plants similar to White
Slough WPCF.
Future effluent quality will be predicted using the above published data and design criteria for the
expanded FftA-- Slough WPCF. The results of the analysis will be presented as a frequency
distribution of expected future effluent BOD and suspended solids concentrations and mass
emission loadings on the receiving waters.
Task 3 - Estimated Impact of Future Discharges on Receiving Waters. This task will
consist of two separate analyses.
Fust, the results of the previous tasks will be used to predict the future impact of the treated
effluent on the receiving waters. Using projections of the future effluentcharacteristics (Task 2)
and the assessment of the impact of the curren t dischargeon the receiving waters (Task 1), it
shouldbe possible to estimatethe impact of the fu= dischargeon the receiving waters.
The results of this analysiswill be checked by performing theoretical calculationsof the effectof
the future discharge on the D.O. of the receiving waters. This analysiswill be the equivalentofthe
classical "oxygen sag" analysis, except that it will beper LOML - using steady-stateequations from
the literature developed for tidal estuaries. This analysis vin be carried out under the direction of
Dr. George Tchobanoglous, Professor of Civil Engineering at the University of California, Davis.
Values of the theoretical constants for dispersion of constituents in the tidally influenced receiving
waters will be derived San the actual field data taken during the recent Dredger Cu t dilution study.
If it is found that a significant impact will result fran the use of the revised waste discharge
requirements, the allowable concentrations of BOD and suspended solids to prevent adverse
impacts von be estimated.
Task 4 - Evaluate Existing Effluent and Land Disposal Facilities. The results of the
above analyses will be compared with design criteria in existing documents (e.g. contract
documents, planning and design reports, existing EIR, etc.) to determine if the existing effluent
storage and land disposal facilities are adequate to accomodate future design flow rates.
Task 5 - Prepare Supplemental EMR. The results from the above analyses will be used by
FKP Associates to prepare the required supplemental EIR. The wmk is divided into five subtasks,
as described below.
Subtask 5.1- Prepare Notice of Preparation. MmV governmental agencies will be involved in
the environmental process, some as permitting agencies and others as reviewers. When an EIR is
to be prepared oft a proposed project or action, it is normal to begin the environmental review
process by sending a Notice of Preparation (NOP)to all parties, including governmental agencies.
A NOP will be prepared by EM, together with an Initial Study. The NOP will include a brief
description of the proposed action, and an Initial Study will be included indicating the
environmental elements that might be significantly affected by the proposed action. The NOP and
LOD391 Page 2
6/12/91
Initial Stud will be sent to the State Clearinghouse and a mailing list of agencies, organizations
and individualsdeveloped by the City of Lodi for the cdigi al EIR. Recipientscf the NOP have M
days within which to respond with comments and suggestions.
Subtask S.' Review Responses to the NOP. EIP Associates will review the responses to the
NOP to ensure that all issues are addressed in the Supplemental Draft EIR. Although contacts with
government agencieswill be made formally through the NOP process as described above, it is
usually worthwhile to meet with certain agency staff members to discuss their concerns. The
following agencies will be contacted directly:
• California Regional Water Quality Control Board, Central Valley Region
• CaliforniaDepartmentof Fish and Gam
• San Joaquin County Halli41'lanning and Public Works Departments
In addition tithe government agencies, it may also be useful to establish lines of
communication with other interestedparties.
SubtasL 5.3 - Prepare Administrative Sunt lemental Draft M. EIP staff will utilize the data
gathered ft,an the resul is of the studies conducted in M3 is 1, 2, 3 and 4 above to prepare an
Administrative Supplemental Draft Environmental Impact Report (ASDEIR) fwtheproposed
aetim. The analysis TAM focus on flee potential effects cf the proposed discharge on receiving
water quality, particularly biochemical oxygen demand, suspended solids and dissolved oxygen.
Three copies of the ASDEIR w i I I be submitted for review by the City of Lodi.
Subtask 5.4 -gpare $Qlemental Draft EIR. Following Ci review of the ASDEIR, EIP
will prepare and publish the Supplemental Draft EIR ( . Fi y copies of the SDEIR will be
printed. EIP will be responsible for distributing the 3=. A Notice of Completion will be f fled
the State OfficeofpPlanning and Research.
Subtask !_S pare SupWen=tal Final ETR. Responses to all written comments on the
SEM will be prepared. It is proposed that one meeting be held by the project team to review
comments received, discuss approaches and methods to resolve sensitive or controversial issues,
and review the draft responses. EIP w i I I prepare the Response to Commentsdocw ent, which
together With the SDEIRwill constitute theSupplemental Final EIR (SFEIR). Fifty copies cfthe
Response to Comments documentwill be printed.
LOD391 Page 3
6/12/91
ESTIMATED LABOR REQUIREMENTS AND BUDGET
The labor requirements and budget for preparing the supplemental EI R are es ti mated as follows:
r, Management $ $
T otai Hours 16 220 1�
Unit cost, $/hr
Total labor cost, $
Expenses, $
Total budget, $
120 70
6,240 7,800
100
1,600 15,360* 31,000
1,600
32,600
* Includes markup of 7% tD cover WBA E&O insurance premium for subcontractorwark.
L OD391 Page 4
6/12/91
Estimated Labor Requirements, hours
Special Consultants
'rte
Project
Project
No.
Description
Mwager
Engineer
Engineering EIR
Ttal
1
Existing ecerving Water
Conditions
a. ExistingD.0. data
4
16
20
b. RODID.O. correlation
4
8
12
c. "Oxygen sag" effect
4
8
12
2
Exisftz & Future Effluent
Chara eristics
a. Existing effluent quality
4
16
20
b. Future effluent quality
4
8
12
3
Estimated Impact of Fu tuz e
Discha Receiving
pec on
waters -
a. Statistical analysis
b. Steady-statecalculations
4
6
12
28
16
16
50
4
Evaluate existing effluent
forage and land disposal
2
8
10
5
cilities
Pare SqWlernenta]ETR
a. Notice bf Preparation
2
10
12
b. Review responses to
2
16
18
NOP
c. Prepare Administrative
4
94
98
SupplementalDraft EIR
d . Prepare Supplemental
2
32
34
Draft EIR
e. Prepare Supplemental
2
68
70
Final EIR
r, Management $ $
T otai Hours 16 220 1�
Unit cost, $/hr
Total labor cost, $
Expenses, $
Total budget, $
120 70
6,240 7,800
100
1,600 15,360* 31,000
1,600
32,600
* Includes markup of 7% tD cover WBA E&O insurance premium for subcontractorwark.
L OD391 Page 4
6/12/91
SCHEDULE OF FEES
(Effective January 1, 1991)
Services described herein shall be provided on a time-and-materialsbasis, unless other methods of
compensation are identified for specific task authorizations. The following rates shall be in effect
through December 31,199 1, at which time they will be subject to change.
Direct costs, such as reproduction, postage, telephone, printing, etc.will be billed at cost.
Transportation will be billed at cost or25¢ per mile, whichever is less. Subconsultants will be
billed at cost plus 7 percent to cover the premium cost for WBA E&O insurance for suhcontractors.
Nom al Rate
Labor Category
For Employees
$/Hour
Partner
$ 120.00
Sgxrvising Engineer
$ 100.00
Principal Engineer
$ 90.00
M#itsw
$ 70.00
Assistant Engineer
$ 50.00
Draftsperson
$ 45.00
Clerical
$ 40.00
Direct costs, such as reproduction, postage, telephone, printing, etc.will be billed at cost.
Transportation will be billed at cost or25¢ per mile, whichever is less. Subconsultants will be
billed at cost plus 7 percent to cover the premium cost for WBA E&O insurance for suhcontractors.
wallWHITLEY,BURCHETT
and Associates, Inc. ? X991
June 12,1991
City of Lodi
City mn
221 West Pine Street
Lodi, California 95241
Attention: Jack Ronsko, Public Works Director
Fran Forkas, Water/Wastewater Superintendent
Subject: Proposed Scope and Budget
White Slough WPCF Supplemental EIR
Gentlemen:
Based on ourmeeting with the staff of the Central Valley Regional Water Quality Control Board, I
have prepared a proposed scope of work and budget for a supplemental Ei R for the White Slough
WPCF expansionprolect. This wadc'vElbecarried out by Whitley, Burchett and Associates,
Inc.(WBA), in associationwith EIP Associates of San Francisco.
We have tried to tailor a scope of work with the minimum effort possible to develop the
information needed by the RWQCB staff ID finalize waste discharge requirements for White
SSloL#i WPCF. We believe that the proposed technical analyses, based on statistical analysis of
the city's self-monitoring data, informationfrom the literature and theoretical calculations of future
water quality conditions wi I I be sufficient. The objective of the analyses wi I I be to determine if the
discharge of 20/20 effluent at the design flow of 8-5 mgd will have a significant impact on the
quality of the receiving waters. It vEl also determine if the expanded facilities will have the
capacity to store or land dispose of, the treated effluent whenever the dissolved oxygen
concentration in the receiving waters falls below 5.0 mg/L, fran whatever cause.
We believe that the time schedulepresented in our letter of May 7th remains reasonable and will
permit completion of the technical and environmental work necessary to support the required
modifications to the EIR. .
Review documents, meet with RWQCB staff and
complete Notice of Preparation 2 weeks
Public review and comment period for NOP and
technical studies and preliminary environmental 6 weeks (concurrently)
Complete Draft ER (including city staffreview) 6 weeks
Public review and comment period for Draft E R 6 weeks
Prepare Final E1R (including city staff review) 4 weeks
Total time 24 weeks
The proposed scope of work, estimated laborrequirements and budget are attached for your review
and approval. Estimated labor costs are included at normal WBA and EIP billing rates.
Reimburs ible expenses includeprinting, phone, fax, postage and other direct project related
expenses at cost. Mileage would be billed at $0.25 per mile. If the City prefers, a "not -to -exceed"
fee of $35,800 (including a contingencyaliowance of 10%), would be acceptable. Billings would
not exceed this amount without prior approval of the city.
33 QUAIL COURT. SUITE 300, WALNUT CREEK. CA 94596 (475)945-6850
Mr. Jack Ronsko
June 6, 1991
Page 2
We will be pleased to meet with you and your staff is discuss the details of this proposal at your
convergence. Please call me if you have any questions or to arrange any necessary meetings. We
took forward m your favorable consideration of this proposal.
Very truly yours,
WHM.EY, BUM= and ASSOCLATES, Inc.
Max E. Burchett, P.E.
cc: John Davis, E P Associates
City of Lodi
White Slough WPCF Supplemental EIR
PROPOSED SCOPE OF WORK
To determine whether there will be a significant impact on the beneficial uses of the receiving
waters if revised VIEte Discharge Requirements are adopted for the expanded White Slough Water
Pollution Control Facility (V PC . Revised requirements would be as follows:
pcdQd BOD5 SusWnded Soli
1 June - 15 October 20 mg/L 20 mg/L
16October - 31 May 30 mg/L 30 mg/L
105 M RT P i
The analysis of current and potential future impacts on the receiving waters will be carried out in
four parts:
1. Quantify existing conditions in the receiving waters
2. Quantifyexisting and future effluentcharacteristics
3. Predict impact of future discharges on the receiving waters
4. Evaluate existing effluent storage and land disposal facilities to accomodate design flaw
if receiving water D.O. fallsbe m 5.0 mg/L.
The results of the analytical work will be used to prepare a Supplemental EIR for the current White
Slough WPCF expansion and upgrading project. The revised EIR will provide the basis for the
adoption of final waste discharge requirements for the White Slough WPCF by the Central Valley
Ronal Water Quality Control Board
TaskDescriptions:
The following tasks will be performed to prepare the required supplemental EIR:
Task 1- Existing Receiving Water Conditions. Three separate analyses will be carried
out for this task.
The fust analysis will quantify the existing conditions in the receiving waters resulting faun the
current effluent discharges from the White Slough treatmentplant. Approximately 4 years of
existing self -mon itori ng data will be analyzed for dissolved oxygen levels in Dredger Cut and
Bishop Cut. The data will be statistically characterized for mean, standard deviation and frequency
of occurrence.
Secondly, acomiationbetween existingeffluent BOD and receiving water D.O. concentrations
will be developed, if possible.
The third analysis will utilize the results of the recently completed dilution study to assess the
impact of physical dilution on the concentration of BOD, suspended solids and D.0 in the
receiving waters. Comparison of the results of the BOD/D.O. correlations faun above vkh the
physical dilution estimates will provide an estimate of the effect of oxygen uptake in the receiving
IDD391 Page 1
6!12/91
waters, the so-called 'oxygen sag" effect. In this analysis, any depression of D.O. greater than
would be predicted by physical dilution alone can be attributed to the exertion of BOD in the
receiving waters.
Task 2 - Existing and Future Effluent Characteristics. Existing and future effluent
characteristics will be statisticallyevaluated in this task to provide the basis for assessing current
and future impacts of the White Slough WPCF discharge on the receiving waters.
Actual White SloughWPCF effluentquality data for a minimum of bloyears will be evaluated for
mean, standard deviation and frequency of occurrence. The results of this analysis will be
compared v&h published data fan n the literature for other activated sludge plants shUar to White
Slough WPCF.
Future effluent quality yin be predicted using the above published data and design criteria for the
expanded White Slough WPCF. The results of the analysis will be presented as a frequency
distribution of expected future effluent BOD and suspended solids concentrations and mass
emission loadings on the receiving waters.
Task 3 - Estimated Impact of Future Discharges on Receiving Waters. This task will
consist of two separate analyses.
First, the results of the previous tasks vein be used to predict the future impact of the treated
effluent on the receiving waters. Using projections of the future effluent characteristics (Task 2)
and the assessment of the impact of the current discharge on the receiving waters (Task 1), it
should be possible to estimate the impact of the futurs discharge on the receiving waters.
The results of this analysis will be checked by performing theoretical calculations of the effect of
the future discharge an the D.O. of the receiving waters. This analysis will be the equivalentof the
classical 'oxygen sag" analysis, except that it w i I I be performed using steady-stateequations fzxn
the literature developed fartidal estuaries. This analysis wM be carried outunder the direction of
Dr. George Tchobanoglous, Professor of Civil Engineering at the University of California, Davis.
Values of the theoretical constants for dispersion of constituents in the tidally influenced receiving
waters will be derived fan the actual field data taken during the recent Dredger Cut dilution study.
If it is found that a significant impact will result f3rnthe use of the revised waste discharge
requirements, the allowable concentrations of BOD and suspended solids to prevent adverse
impacts vOl be estimated.
Task 4 - Evaluate Existing Effluent and Land Disposal Facilities. The results of the
above analyses wM be compared with design criteria in existing documents (e.g. contract
documents, planning and design reports, existing EIR, etc.) to determine if the existing effluent
storage and land disposal facilities are adequate to accomodate future design flawrates.
7mc 5 - Prepare Supplemental EIR. The results from the above analyses will be used by
EIP Associates to prepare the required supplemental EIR. The work is divided into five subtasks,
as described below.
SUbtask 5.1 ■ Prepare Notice of Preparation. Many govemmenta] agencies will be involved in
the environmental process, some as permitting agencies and others as reviewers. When an EIR is
to be prepared on a proposed pmject traction, it is nonoral to begin the environmental review
process by sending a Notice of Preparation (N OP) to all parties, including governmental agencies,
A NOP will be prepared by EIP, together with an Initial Study. The NOP Vin include a brief
description of the proposed action, and an Initial Study will be included indicating the
environmental elements that might be significantlyaffected by the proposed action. The NOP and
rOD391 Page 2
6/12/91
Initial Stuffy va71 be sent to the State Cleatinghouse and a maililig list cf agencies, organizations
and individuals developed by the CHi cf ' for the original EN Recipients cf the NOP have 30
days within which to respond vitli comments and suggestions.
Subtask 5.2 - Review Restxmses to the NOP. EIP Associates will review the responses to the
NOP to ensure that all issues are addressed in the Supplemental Draft EIR. Although contacts vdh
government agencies vi.71 be made forntally through the NOP process as described above itis
usually worthwhile to meet vltth certain agency staffmembers 1D discuss their concems. fhe
following agencies will be contacted directly:
• California Regional Water Quality Control Board,Central VatIey Region
• CaliformaDepartment offish and Game
• San Joaquin CotmtyH§Wft�,Plaluungand Public WxcsDepartments
In addition iD the government agencies, it m y also be useful to establish lines of
communicationwith otherinterested parties.
Subtask 5.3 - $spare Administrative Supplemental Draft EIR. EIP staff NAfll utilize the data
gathered from the results cf the studies conducted in 7bft I. 2, 3 and 4 above to prepare an
Administrative SupplementalDraftEnvironmentalImpact Report(ASDEIR) forthe proposed
action. The analysis uM focus on the potential effects cf the proposed discharge on receiving
water quality, particularly biochemical o�gen demand, suspended solids and dissolved oxygen.
Three copies of the ASTIR w i I I be submitted for review by the City cf Lodi.
Subtask 5.4 - Prepare Sugplemental Draft ET R . FollowingCity review of the ASDEIR, EIP
will prepare and publish the Supplemental Draft EIR (SDEIR). My copies of the SDEIRwill be
printed EIP von be responsible for distributingthe S EMR A Notice cf Completion AM be filed
Alh the State Office of Planning and Research
Subtask 5.5 = Prepare upplemental Final EI& Responses to all Written comments on the
SDE1Rwill be prepared. It is proposed that one meeting be held by the project team to review
comments received, discuss approaches and methods to resolve sensitive or controversial issues,
and review the draft responses. E: P An prepare the Respponse to Comments document, which
together v ffi the SDEIRwM constitute. ?heSupplemeri final. EIR (SF<EIR). Fifty copies of the
Response to Comments document will be printed.
LOD391 Page 3
6/12/91
ESTIMATED LABOR REQUIREMENTS AND BUDGET
The labor requirements and budget for preparing the supplemental EIR are estimated as follows:
C
Loral nours 5L IU4 lb LLLU 3JL
Unit cost, $/hr 120 70 100
T-tllabor cos t, $ 6,240 7,800 1,600 15,360* 31,000
Expenses, $ 1.600
Total budget, $ 32,600
Includes markup of 7% to coverWBA E&0 insurance premium for subcontractorwork.
LOD391 Page 4
6/12/91
Estimated Labor Requirements, hours
special Consultants
Project
Project
EIR
No .
Description
Manager
IIgftmw
Engineering
Total
1
Existing Receiving Water
conditions
a. Existing D.O. data
4
16
20
b. BOD/D.O. correlation
4
8
12
c. "Oxygen sag" effect
4
8
12
2
Existing & R-ihmp-Effluent
Characteristics
a. Existing effluent quality
4
16
20
b. Rib effluent quality
4
8
12
3
Estimated Imvact of Fut=
Discharges Receiving
on
waters -
a. Statistical analysis
4
12
16
b. Steady-stateca"lculations
6
28
16
50
4
Evaluate existing effluent
2
8
10
storage and land disposal
facilities
5
prepare Supplemental EIR
a. NYtiae of Preparation
2
10
12
b. Review responses to
2
16
18
NOP
c. Prepare Administrative
4
94
98
Supplemental Draft EIR
d . Prepare Supplemental
2
32
34
Draft EIR
e. Prepare Supplemental
2
68
70
»nal EIR
C
Loral nours 5L IU4 lb LLLU 3JL
Unit cost, $/hr 120 70 100
T-tllabor cos t, $ 6,240 7,800 1,600 15,360* 31,000
Expenses, $ 1.600
Total budget, $ 32,600
Includes markup of 7% to coverWBA E&0 insurance premium for subcontractorwork.
LOD391 Page 4
6/12/91
SCHEDULE OF FEES
(Effective January 1, 1991)
Services described herein shall be provided on a time -and -materials basis, unless other methods of
compensation are identified for specific task authorizations. The following rates shall be in effect
through December 31,1991, at which boos they will be subj ect to change.
Direct costs, such as reproduction, postsgge, telephone, printing, etc.will be billed at cost.
Transportation mall be billed at cost or 25¢ per mile, whichever is less. Subconsultants will be
billed at cost plus 7 percen t to cover the p mr dun cost for WBA E&O insurance for subcontractors.
Normal Rate
Labor Categ=
For Employees
$/Hour
Partner
$ 120.00
SupervisingEngineer
$ 100.00
Principal Engineer
$ 90.00
Engineer
$ 70.00 .
Assistant Engineer
$ 50.00
Draftsperson
$ 45.00
clerical
$ 40.00
Direct costs, such as reproduction, postsgge, telephone, printing, etc.will be billed at cost.
Transportation mall be billed at cost or 25¢ per mile, whichever is less. Subconsultants will be
billed at cost plus 7 percen t to cover the p mr dun cost for WBA E&O insurance for subcontractors.