AGENDA TITLE: Plans and Specifications and Advertisement for Bids for
Poplar Street Wastewater Pipe Improvement, Cherokee Lane to
Cen t r a 1 Avenue
MEETING DATE: July 15, 1992
PREPARED BY: Public Works Directcr
RECOMMENDED ACTION: That the City C until approve the plans and specifications for
the above project and authorize advertising for bids.
BACKGROUND INFORMATION: This project consists of jacking 95 lineal feet and
trenching approximately 1,800 lineal feet of 10 -inch
diameter wastewater pipe parallel to the existir, 8 -inch
diameter wastewater pipe to improve the existing wastewater
flow and other incidental and related work, all as shown on the plans an4
specifications for the project. The existing 8 -inch diameter wastewater pipe will
be abandoned in place with control density fill upon the completion of the new
wastewater pipe.
The contractor will be given 36 working days to complete this project. During the
trenching operation, traffic on Poplar Street will be restricted to local use only.
FUNDING: Originally Budgeted:
Budgeted Fund:
Current Appropriation:
Total Prc,;,-tt Estimate:
Bid Opening Date:
1990
Sewer Capital Outlay
5159.000
$160,000
August I.?, 1992 7
!Jack .t . Ronsko
-;thl i( Works Director
Prepared by Lyman Chang, Assistant Engineer
,ILR/L/lm
cc: Purchasing Officer,
Water/Wastewater Superintendent
1 - - --
APPRC)vED
TliOMAS A. PETERSON
City hinnttger