HomeMy WebLinkAboutAgenda Report - July 7, 2010 D-06AGENDA ITEM b4
CITY OF LODI
COUNCIL COMMUNICATION
9</FOK�
AGENDA TITLE: Adopt Resolution Awarding Two -Year Contractsfor Janitorial Services for City
Facilities to Korean Professional Building Maintenance, of Stockton ($192,514);
Advanced Property Services, of Sacramento ($52,588); and East Bay Building
Services, of San Leandro ($79,758); and Authorizing City Managerto Execute
Contract Changes and Extensions
MEETING DATE:
PREPARED BY:
July 7, 2010
PublicWorks Director
RECOMMENDED ACTION: Adopt a resolution awarding two-year contracts for janitorial services
for City facilities to Korean Professional Building Maintenance, of
Stockton, in the amount of $192,514; Advanced Property Services,
of Sacramento, in the amount of $52,588; and East Bay Building
Services, of San Leandro, in the amount of $79,758; and authorizing the City Managerto execute
contract changes and extensions.
BACKGROUND INFORMATION: This project consists of the janitorial specifications and contract
requirements to service City facilities. Within the past five years, the
City facilities have grown by a net 21,000 square feet, including the
additions of the new Transit shop facility and the County Criminal
Court (located in the Police Facility) and the relocation of the Finance Department. Growth and changing
expectations in the quality and frequency of janitorial service required an update to the specifications and
contract management requirements and re -bidding of the janitorial services contract.
The specifications provided for the City to award separate contracts for groups of facilities. In addition, the
bid allowed selection of service levels (frequency)to reduce the total cost, if needed. This format allowed
the City to pursue the highest quality work at the most reasonable cost. The contracts also include all
supplies and materials, paper products and consumables that had, in past years, been provided by the
City. The Public Works Facilities Services Division oversees the janitorial contracts for the City.
Plans and specifications for this project were approved on April 21, 2010. Four groups of facilities were
designated:
Group — Lodi Police Department, Lodi Court No. 1, and Library
Group B — City Hall, Finance Department, Carnegie Forum, and Public Safety Building
Group C — Fire Administration, Parks and Recreation, Parks Annex "B" Space, Municipal Service Center,
Transit Fleet Shop, and White Slough Water Pollution Control Facility
Group D —Hutchins Street Square
APPROVED:
Konr rtla_m_ dim City Manager
K:\WP\PROJ ECTS\M I S C \JAN I T O R L\2010\CAwa rd . d o c
6/30/2010
Adopt Resolution Awarding Two -Year Contracts for Janitorial Services for City Facilities to
Korean Professional Building Maintenance, of Stockton ($192,514); Advanced Property Services, of
Sacramento ($52,588); and East Bay Building Services, of San Leandro ($79,758); and Authorizing
City Manager to Execute Contract Changes and Extensions
July 7, 2010
Page 2
Three schedules of cleaning were designated:
Schedule — Standard Service (higher frequency of cleaning, generally five days per week)
Schedule B — Reduced Service (cleaning less often, generally three days per week)
Schedule C — Requested Service (lump -sum cleaning cost per request)
Additionally, the contractors were required to provide bids for estimated annual cost of paper products for
each Group and to provide square -foot cleaning costs for restrooms, offices, and elevators.
Contractors were required to bid both Standard and Reduced Services, Requested Services, and Square
Foot Cleaning Costs. Contractorswere allowed to bid one or more groups (A, B, C, and/or D), but could
not bid separate facilities. The lowest successful bids were determined by Group and level of service,
together with the estimated annual cost of paper products.
On May 26, 2010, the City received six bids, although only four of the janitorial contractors bid all four
groups. Two bidders subsequently withdrew their bids entirely. The following bids were considered for
this project, shown by Group and the Schedule that we propose to award, and including the estimated
annual cost of paper products.
Bidder
Advanced Property Services
East Bay Building Services
Kathleen's Kleaning Service, Inc.
Korean Professional Building Maintenance
Peninsula Mobile SeNiGe (bid withdrawn)
PRIDE Ind stFies (bid withdrawn)
Bidder
Group A. Schedule A
Korean Professional Building Maintenance
Advanced Property Services
East Bay Building Services
Kathleen's Kleaning Service, Inc.
Group B. Schedule B
Advanced Property Services
Korean Professional Building Maintenance
Kathleen's Kleaning Service, Inc.
East Bay Building Services
Group C. Schedule B
East Bay Building Services
Advanced Property Services
Korean Professional Building Maintenance
Group D, Schedule A
Korean Professional Building Maintenance
Advanced Property Services
Location
Sacramento
San Leandro
Stockton
Stockton
Redwood City
Roseville
�_IGJ
$70,861.00
$85,346.75
$104,259.00
$152,813.22
$26,294.00
$27,909.00
$33,163.69
$36,143.00
$39,879.00
$40,562.86
$55,500.00
$25,396.00
$31,542.00
K:\WP\PROJECTSWIISC\JANITORL\2010\CAward,doc 6/30/2010
Adopt Resolution Awarding Two -Year Contracts for Janitorial Services for City Facilities to
Korean Professional Building Maintenance, of Stockton ($192,514); Advanced Property Services, of
Sacramento ($52,588); and East Bay Building Services, of San Leandro ($79,758); and Authorizing
City Manager to Execute Contract Changes and Extensions
July 7, 2010
Page 3
City staff is recommending that Korean Professional Building Maintenance be awarded a contract to
coverjanitorial services for Groups and D (Police Facility, Court No. 1, Library, and Hutchins Street
Square); Advanced Property Services be awarded a contractfor Group B (City Hall, Finance Department,
Carnegie Forum, and portions of the Public Safety Building); and East Bay Building Services be awarded
a contract for Group C (Fire Administration, Parks and Recreation Administration, Municipal Service
Center, Transit Fleet Shop, and White Slough Water Pollution Control Facility). The cleaning schedules
in the recommended contracts are the same as the existing contracts.
All contracts shall be for the initial term of two years, with the City Managergiven authority to negotiate
options to extend, to contract for additional services and/or add or delete portions of the contract that are
in the best interest of the City, and to accommodate additions or reductions of space or to change
cleaning frequencies and/or duties. The contractors will invoice the City monthly for actual work
performed, along with the actual cost for paper products used.
FISCAL IMPACT: The bids for janitorial services came in lowerthan anticipated (estimated at
$200,000 per year including paper products), resulting in a net budget
savings of approximately 15 percent.
FUNDING AVAILABLE: Funds for janitorial services are included in FY 2010/11 Operating Accounts
for Public Works Facilities Services (103511), Hutchins Street Square
(345525), Library Administration (210801), Recreation (346011), Parks
(107511), Water (180451), Wastewater (170401), White Slough Treatment
Plant (170403), Transit (125052), and Electric Utility (160601).
Jor an Ayers
Deputy City Manager/Internal Services Director
AV a-LZU I
IF.. Wally fttfd@lfn
PublicWorks Director
Prepared by Dennis J. Callahan, Fleet and Facilities Manager
FWS/DJC/pmf
cc: Community Center Director
Library Services Director
Interim Parks and Recreation Director
Electric Utility Director
Transportation Manager
Facilities Supervisor
K:\WP\PROJECTSWISCUANITORL\2010\CAward,doc 6/30/2010
2010 JANITORIAL SERVICES FOR CITY FACILITIES CONTRACT
CITY OF LODI, CALIFORNIA
THIS CONTRACT made by and between the CITY OF LODI, State of California, herein
referred to as the "City," and KOREAN PROFESSIONAL BUILDING MAINTENANCE, herein
referred to as the "Contractor."
WITNESSETH:
That the parties hereto have mutually covenanted and agreed, and by these presents do
covenant and agree with each other, as follows:
The complete Contract consists of the following documents which are incorporated herein by
this reference, to -wit:
Notice Inviting Bids
Information to Bidders
General Provisions
Special Provisions
Bid Proposal
Contract
Contract Bonds
Plans
Janitorial Maintenance Checklist for City of Lodi Facilities
All of the above documents, sometimes hereinafter referred to as the "Contract Documents,"
are intended to cooperate so that any work called for in one and not mentioned in the other is to
be executed the same as if mentioned in all said documents.
ARTICLE I - That for and in consideration of the payments and agreements hereinafter
mentioned, to be made and performed by the City, at Contractor's cost and expense, to do all
the work and furnish all the materials except such as are mentioned in the specifications to be
furnished by the City, necessary to maintain in a good workmanlike and substantial manner and
to the satisfaction of the City the proposed maintenance of City facilities.
ARTICLE II - The City hereby promises and agrees with the Contractor to employ, and does
hereby employ, the Contractor to provide all materials and services not supplied by the City and
to do the work according to the terms and conditions for the price herein, and hereby contracts
to pay the same as set forth in Section 5.2,C, "Measurement, Acceptance and Payment," of the
General Provisions, in the manner and upon the conditions above'set forth; and the said parties
for themselves, their heirs, executors, administrators, successors and assigns, do hereby agree
to the full performance of the covenants herein contained.
ARTICLE III - The Contractor agrees to conform to the provisions of and all responsibility for
compliance with all Labor Code requirements.
ARTICLE IV - And the Contractor agrees to receive and accept the following prices as full
compensation for furnishing all materials and for doing all the work contemplated and embraced
in this agreement; also for all loss or damage arising out of the nature of the work aforesaid or
Contract Korean.doc 1 06/09/10
from the action of the elements, or from any unforeseen difficulties or obstructions which may
arise or be encountered in the prosecution of the work until its acceptance by the City, and for
all risks of every description connected with the work; also for all expenses incurred by or in
consequence of the suspension or discontinuance of work and for well and faithfully completing
the work, and the whole thereof, in the manner and according to the plans and contract
documents and the requirements of the Engineer under them, to -wit:
Perform the janitorial work necessary to maintain City of Lodi facilities and other incidental and
related work in accordance with these specifications. The areas to be maintained are shown in
Section 5, General Conditions, 5.1, Description of Work, and in the plans of the specifications
for "2010 Janitorial Services for City Facilities".
B. Lodi Court #1
217 West Elm Street
Service 3 dayslweek LS $450.00
C. Library
201 West Locust Street
Service 5 days/week LS $1,600.00
Group A Total Lump Sum
(TLS) for Each Schedule TLS $4,720.00 TLS $450.00 TLS $0.00
Group A Estimated Annual
Cost of Paper Products TLS $6,421.00
Total Lump Sum (TLS)
Group D
M. Hutchins Street Square
125 South Hutchins Street
1. Main Lobby Restrooms,
Thomas Theater
Restrooms, Kirst Hall
Kitchen and Restrooms
Service 5 dayslweek LS $720.00
Contract Korean.doc 2 06/09/10
Schedule A
Schedule B
Schedule C Annual
Standard
Reduced
Requested Estimated
Service
Service
Service Paper Products
LS/Month
LS/Month
LS/Month
Group A
A. Lodi Police Department
215 West Elm Street
Jail, Public Lobby, 6
LS $1,850.00
days/week
Operations, Staffing areas, 5
LS $1,270.00
days/wee k
B. Lodi Court #1
217 West Elm Street
Service 3 dayslweek LS $450.00
C. Library
201 West Locust Street
Service 5 days/week LS $1,600.00
Group A Total Lump Sum
(TLS) for Each Schedule TLS $4,720.00 TLS $450.00 TLS $0.00
Group A Estimated Annual
Cost of Paper Products TLS $6,421.00
Total Lump Sum (TLS)
Group D
M. Hutchins Street Square
125 South Hutchins Street
1. Main Lobby Restrooms,
Thomas Theater
Restrooms, Kirst Hall
Kitchen and Restrooms
Service 5 dayslweek LS $720.00
Contract Korean.doc 2 06/09/10
Additional Requested
Cleaning For:
Main Lobby Restrooms
Thomas Theater
Restrooms
Kirst Hall
2. Senior Center
Service 5 days/week
3. Administration Offices,
Arts Commission Office
and Classroom
Service 5 days/week
Additional Cleaning
Requested for Classroom
4. Green Room, Dressing Rooms
(Approximately 1,350 Square
Feet, Counters, Restrooms,
Showers)
Additional Requested
Cleaning
Group D Total Lump Sum
(TLS) for Each Schedule
Group D Estimated Annual
Cost of Paper Products
Total Lump Sum (TLS)
For Groups A. B. C and D
Include:
N. Square Foot Cleaning Cost
1. Restrooms
Service 5 days/week
Service 3 days/week
Schedule A
Standard
Service
LS/Month
LS $600.00
LS $550.00
Schedule B
Reduced
Service
LS/Month
Schedule C
Requested
Service
LS/Month
LS $50.00
LS $50.00
LS $80.00
LS $50.00
LS $80.00
TLS $1,870.00 TLS $0.00 TLS $310.00
Schedule A
Standard
Service
LS/Month
$0.312/SF
Schedule B
Reduced
Service
LS/Month
$0.200/SF
Schedule C
Requested
Service
LS/Month
Annual
Estimated
Paper Products
TLS $2,956.00
Annual
Estimated
Paper Products
Contract Korean.doc 3 06/09/10
2. Offices
Service 5 days/week
Service 3 days/week
3. Elevator
Service 5 days/week
Service 3 days/week
O. 24/7 Emergency Call -Out
Response
(1 Hour Response, Applies to
All Facility Groups)
Minimum Charge per Call, per
Person and Rate per Hour, per
Person
ScheduleA
Standard
Service
LS/Month
$0.1045/SF
$0.1045/SF
Schedule B
Reduced
Service
LS/Month
$0.0816/SF
$0.0816/SF
Schedule C
Requested
Service
LS/Month
Minimum Charge $100.00
Rate per Hour $100.00
Annual
Estimated
Paper Products
ARTICLE V - By my signature hereunder, as Contractor, I certify that I am aware of the
provisions of Section 3700 of the Labor Code, which requires every employer to be insured
against liability for workers' compensation or to undertake self-insurance in accordance with the
provisions of that code, and I will comply with such provisions before commencing the
performance of the work of this Contract.
ARTICLE VI - It is further expressly agreed by and between the parties hereto that, should
there be any conflict between the terms of this instrument and the Bid Proposal of the
Contractor, then this instrument shall control and nothing herein shall be considered as an
acceptance of the said terms of said proposal conflicting herewith.
ARTICLE VII - The Contractor agrees to commence work pursuant to this Contract within 10
calendar days after the City Manager has executed the Contract.
OPTION TO RENEW - By mutual agreement, the City and Contractor may enter into an
agreement to extend this Contract.
ASSIGNMENT — The Contractor shall not assign nor shall not attempt to assign this agreement
without the written consent of the City having been first obtained.
DAMAGES — The Contractor will report to the Facilities Manager any damages caused by the
Contractor's employees or equipment to any public facilities and equipment
WHEN SIGNING THIS CONTRACT, THE CONTRACTOR AGREES THAT THE PERIOD FOR
THIS CONTRACT IS AUGUST 1,2010 THROUGH JULY 31,2012, AND THE CONTRACTOR
AGREES TO SUBMIT MONTHLY BILLINGS NO LATER THAN THE 10T" OF EACH MONTH.
Contract_Korean.doc 4 06/10/10
IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands the year
and date written below.
C�Z�1i•Y�:7_L�C�1:�
KOREAN PROFESSIONAL
BUILDING MAINTENANCE
CITY OF LODI
By:
Konradt Bartlam
Interim City Manager
By: Date:
Title
(CORPORATE SEAL)
Attest:
Randi Johl
City Clerk
Approved As To Form
D. Stephen Schwabauer
City Attorney
vn��
Contract_Korean.doc 5 06/09/10
2010 JANITORIAL SERVICES FOR CITY FACILITIES CONTRACT
CITY OF LODI, CALIFORNIA
THIS CONTRACT made by and between the CITY OF LODI, State of California, herein
referred to as the "City," and ADVANCED PROPERTY SERVICES, herein referred to as the
"Contractor."
WITNESSETH:
That the parties hereto have mutually covenanted and agreed, and by these presents do
covenant and agree with each other, as follows:
The complete Contract consists of the following documents which are incorporated herein by
this reference, to -wit:
Notice Inviting Bids
Information to Bidders
General Provisions
Special Provisions
Bid Proposal
Contract
Contract Bonds
Plans
Janitorial Maintenance Checklist for City of Lodi Facilities
All of the above documents, sometimes hereinafter referred to as the "Contract Documents,"
are intended to cooperate so that any work called for in one and not mentioned in the other is to
be executed the same as if mentioned in all said documents.
ARTICLE I - That for and in consideration of the payments and agreements hereinafter
mentioned, to be made and performed by the City, at Contractor's cost and expense, to do all
the work and furnish all the materials except such as are mentioned in the specifications to be
furnished by the City, necessary to maintain in a good workmanlike and substantial manner and
to the satisfaction of the City the proposed maintenance of City facilities.
ARTICLE II - The City hereby promises and agrees with the Contractor to employ, and does
hereby employ, the Contractor to provide all materials and services not supplied by the City and
to do the work according to the terms and conditions for the price herein, and hereby contracts
to pay the same as set forth in Section 5.2,C, "Measurement, Acceptance and Payment," of the
General Provisions, in the manner and upon the conditions above set forth; and the said parties
for themselves, their heirs, executors, administrators, successors and assigns, do hereby agree
to the full performance of the covenants herein contained.
ARTICLE III - The Contractor agrees to conform to the provisions of and all responsibility for
compliance with all Labor Code requirements.
ARTICLE IV - And the Contractor agrees to receive and accept the following prices as full
compensation for furnishing all materials and for doing all the work contemplated and embraced
in this agreement; also for all loss or damage arising out of the nature of the work aforesaid or
Co ntract_AdvancedPrope rty.doc 1 06/09/10
from the action of the elements, or from any unforeseen difficulties or obstructions which may
arise or be encountered in the prosecution of the work until its acceptance by the City, and for
all risks of every description connected with the work; also for all expenses incurred by or in
consequence of the suspension or discontinuance of work and for well and faithfully completing
the work, and the whole thereof, in the manner and according to the plans and contract
documents and the requirements of the Engineer under them, to -wit:
Perform the janitorial work necessary to maintain City of Lodi facilities and other incidental and
related work in accordance with these specifications. The areas to be maintained are shown in
Section 5, General Conditions, 5.1, Description of Work, and in the plans of the specifications
for "2010 Janitorial Services for City Facilities".
Group B
D. City Hall
221 West Pine Street
Service 3 days/week
E. Finance Department
310 West Elm Street
Service 3 days/week
F. Carnegie Forum
305 West Pine Street
Service 3 days/week
Requested Cleaning
G. Public Safety Building
230 West Elm Street
Electric Utility Meter Readers
and Restrooms, Pistol Range
Restrooms
Service 3 days/week
Total Lump Sum (TLS) for
Each Schedule
Group B Estimated Annual
Cost of Paper Products
Total Lump Sum (TLS)
Schedule A
Schedule B
Schedule C
Annual
Standard
Reduced
Requested
Estimated
Service
Service
Service
Paper
LS/Month
LS/Month
LS/Month
Products
LS $820.00
LS $325.00
LS $588.00
LS $45.00
LS $121.00
TLS $0.00 TLS $1,854.00 TLS $45.00
TLS $4,046.00
Contract—Advanced Property. doc 2 06/09/10
For Groups A, B, C and D Include:
N. Square Foot Cleaning Cost
1. Restrooms
Service 5 days/week
Service 3 days/week
2. Offices
Service 5 days/week
Service 3 dayslweek
3. Elevator
Service 5 days/week
Service 3 days/week
O. 2417 Emergency Call -Out
Response
(1 Hour Response, Applies to
All Facility Groups)
Minimum Charge per Call, per
Person and Rate per Hour, per
Person
Schedule A
Standard
Service
LS/Month
Schedule B
Reduced
Service
LS/Month
$0.14/S F
$0.10/SF
$0.85/SF
$0.59/S F
$0.14/SF
$0.10/SF
Schedule C
Annual
Requested
Estimated
Service
Paper
LS/Month
Products
Minimum Charge $65.00
Rate per Hour $18.00
ARTICLE V - By my signature (hereunder, as Contractor, I certify that I am aware of the
provisions of Section 3700 of the Labor Code, which requires every employer to be insured
against liability for workers' compensation or to undertake self-insurance in accordance with the
provisions of that code, and I will comply with such provisions before commencing the
performance of the work of this Contract.
ARTICLE VI - It is further expressly agreed by and between the parties hereto that, should
there be any conflict between the terms of this instrument and the Bid Proposal of the
Contractor, then this instrument shall control and nothing herein shall be considered as an
acceptance of the said terms of said proposal conflicting herewith.
ARTICLE VII - The Contractor agrees to commence work pursuant to this Contract within 10
calendar days after the City Manager has executed the Contract.
OPTION TO RENEW — By mutual agreement, the City and Contractor may enter into an
agreement to extend this Contract.
ASSIGNMENT — The Contractor shall not assign nor shall not attempt to assign this agreement
without the written consent of the City having been first obtained.
DAMAGES — The Contractor will report to the Facilities Manager any damages caused by the
Contractor's employees or equipment to any public facilities and equipment
Contract_AdvancedProperty. doc 3 06110110
WHEN SIGNING THIS CONTRACT, THE CONTRACTOR AGREES THAT THE PERIOD FOR
THIS CONTRACT IS AUGUST 1,2010 THROUGH JULY 31,2012, AND THE CONTRACTOR
AGREES TO SUBMIT MONTHLY BILLINGS NO LATER THAN THE 10TH OF EACH MONTH.
IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands the year
and date written below.
CONTRACTOR:
ADVANCED PROPERTY SERVICES
IN
Title
(CORPORATE SEAL)
CITY OF LODI
By:
Konradt Bartlam
Interim City Manager
Date:
Attest:
Randi Johl
City Clerk
Approved As To Form
D. Stephen Schwabauer
City Attorney
Contract—Advanced Property, doc 4 06/09/10
2010 JANITORIAL SERVICES FOR CITY FACILITIES CONTRACT
CITY OF LODI, CALIFORNIA
THIS CONTRACT made by and between the CITY OF LODI, State of California, herein
referred to as the "City," and EAST BAY BUILDING SERVICES, herein referred to as the
"Contractor."
WITNESSETH:
That the parties hereto have mutually covenanted and agreed, and by these presents do
covenant and agree with each other, as follows:
The complete Contract consists of the following documents which are incorporated herein by
this reference, to -wit:
Notice inviting Bids
Information to Bidders
General Provisions
Special Provisions
Bid Proposal
Contract
Contract Bonds
Plans
Janitorial Maintenance Checklist for City of Lodi Facilities
All of the above documents, sometimes hereinafter referred to as the "Contract Documents,"
are intended to cooperate so that any work called for in one and not mentioned in the other is to
be executed the same as if mentioned in all said documents.
ARTICLE I - That for and in consideration of the payments and agreements hereinafter
mentioned, to be made and performed by the City, at Contractor's cost and expense, to do all
the work and furnish all the materials except such as are mentioned in the specifications to be
furnished by the City, necessary to maintain in a good workmanlike and substantial manner and
to the satisfaction of the City the proposed maintenance of City facilities.
ARTICLE II - The City hereby promises and agrees with the Contractor to employ, and does
hereby employ, the Contractor to provide all materials and services not supplied by the City and
to do the work according to the terms and conditions for the price herein, and hereby contracts
to pay the same as set forth in Section 5.2,C, "Measurement, Acceptance and Payment," of the
General Provisions, in the manner and upon the conditions above set forth; and the said parties
for themselves, their heirs, executors, administrators, successors and assigns, do hereby agree
to the full performance of the covenants herein contained.
ARTICLE III - The Contractor agrees to conform to the provisions of and all responsibility for
compliance with all Labor Code requirements.
ARTICLE IV - And the Contractor agrees to receive and accept the following prices as full
compensation for furnishing all materials and for doing all the work contemplated and embraced
in this agreement; also for all loss or damage arising out of the nature of the work aforesaid or
Contract_EastBay.doc 1 06/30/10
from the action of the elements, or from any unforeseen difficulties or obstructions which may
arise or be encountered in the prosecution of the work until its acceptance by the City, and for
all risks of every description connected with the work; also for all expenses incurred by or in
consequence of the suspension or discontinuance of work and for well and faithfully completing
the work, and the whole thereof, in the manner and according to the plans and contract
documents and the requirements of the Engineer under them, to -wit:
Perform the janitorial work necessary to maintain City of Lodi facilities and other incidental and
related work in accordance with these specifications. The areas to be maintained are shown in
Section 5, General Conditions, 5.1, Description of Work, and in the plans of the specifications
for "2010 Janitorial Services for City Facilities".
Service 3 dayslweek LS $692.00
B Spaces
Requested Additional Cleaning
of Annex "B Space" (Per
Request) LS $395.00
J. Municipal Service Center
1331 South Ham Lane
Public Works, Electric Utility,
Purchasing Warehouse, and
Fuel Island/Electricians' Shop
Service 5 dayslweek LS $1,143.00
K. Transit Fleet Shop
1331 South Ham Lane
Service 3 dayslweek LS $430.00
L. White Slough Water Pollution
Control Facility
12751 North Thornton Road
Service 3 dayslweek LS $435.00
Total Lump Sum (TLS) for TLS $1,143.00 TLS $1,965.00 TLS $395.00
Each Schedule
Contract_EastBay.doc 2 06/30/10
Schedule A
Schedule B
Schedule C Annual
Standard
Reduced
Requested Estimated
Service
Service
Service Paper Products
LS/Month
LS/Month
LS/Month
Group C
H. Fire Administration
25 East Pine Street
Service 3 dayslweek
LS $408.00
I. Parks and Recreation
111 & 125 North Stockton
Street
Service 3 dayslweek LS $692.00
B Spaces
Requested Additional Cleaning
of Annex "B Space" (Per
Request) LS $395.00
J. Municipal Service Center
1331 South Ham Lane
Public Works, Electric Utility,
Purchasing Warehouse, and
Fuel Island/Electricians' Shop
Service 5 dayslweek LS $1,143.00
K. Transit Fleet Shop
1331 South Ham Lane
Service 3 dayslweek LS $430.00
L. White Slough Water Pollution
Control Facility
12751 North Thornton Road
Service 3 dayslweek LS $435.00
Total Lump Sum (TLS) for TLS $1,143.00 TLS $1,965.00 TLS $395.00
Each Schedule
Contract_EastBay.doc 2 06/30/10
Group C Estimated Annual
Cost of Paper Products
Total Lump Sum (TLS)
For Groups A. B, C and D Include:
N. Square Foot Cleaning Cost
1. Restrooms
Service 5 dayslweek $0.08/S F
Service 3 dayslweek $0.08/S F
2. Offices
Service 5 dayslweek $0.08/S F
Service 3 dayslweek $0.08/S F
3. Elevator
Service 5 dayslweek $0.08/S F
Service 3 dayslweek $0.08/SF
O. 2417 Emergency Call -Out
Response
(1 Hour Response, Applies to Minimum Charge $35.00
All Facility Groups)
Minimum Charge per Call, per Rate per Hour $25.00
Person and Rate per Hour, per
Person
TLS $2,583.00
ARTICLE V - By my signature hereunder, as Contractor, I certify that I am aware of the
provisions of Section 3700 cf the Labor Code, which requires every employer to be insured
against liability for workers' compensation or to undertake self-insurance in accordance with the
provisions of that code, and I will comply with such provisions before commencing the
performance of the work of this Contract.
ARTICLE VI - It is further expressly agreed by and between the parties hereto that, should
there be any conflict between the terms of this instrument and the Bid Proposal of the
Contractor, then this instrument shall control and nothing herein shall be considered as an
acceptance of the said terms of said proposal conflicting herewith.
ARTICLE VII - The Contractor agrees to commence work pursuant to this Contract within 10
calendar days after the City Manager has executed the Contract.
OPTION TO RENEW - By mutual agreement, the City and Contractor may enter into an
agreement to extend this Contract.
ASSIGNMENT — The Contractor shall not assign nor shall not attempt to assign this agreement
without the written consent of the City having been first obtained.
DAMAGES — The Contractor will report to the Facilities Manager any damages caused by the
Contractor's employees or equipment to any public facilities and equipment
Contract_EastBay.doc 3 06130110
WHEN SIGNING THIS CONTRACT, THE CONTRACTOR AGREES THAT THE PERIOD FOR
THIS CONTRACT IS AUGUST 1, 2010 THROUGH JULY 31, 2012, AND THE CONTRACTOR
AGREES TO SUBMIT MONTHLY BILLINGS NO LATER THAN THE 10T" OF EACH MONTH.
IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands the year
and date written below.
CONTRACTOR:
EAST BAY BUILDING SERVICES
la
Title
(CORPORATE SEAL)
CITY OF LODI
By:
Konradt Bartlam
Interim City Manager
Date:
Attest:
Randi Johl
City Clerk
Approved As To Form
D. Stephen Schwabauer
City Attorney �e
Contract_EastBay.doc 4 06/30/10
RESOLUTION NO. 2010-104
A RESOLUTION OF THE LODI CITY COUNCIL AWARDING
TWO-YEAR CONTRACTS FOR JANITORIAL SERVICES FOR
CITY FACILITIES
WHEREAS, in answer to notice duly published in accordance with law and the order of
this City Council, sealed bids were received and publicly opened on May 26, 2010, at
11:00 a.m. for janitorial services for City facilities, described in the plans and specifications
therefore approved by the City Council on April 21, 2010; and
WHEREAS, said bids have been checked and tabulated and a report thereof filed with
the City Manager as follows:
Bidder
Location
Advanced Property Services
Sacramento
East Bay Building Services
San Leandro
Kathleen's Kleaning Service, Inc.
Stockton
Korean Professional Building Maintenance
Stockton
Peninsula Mobile Service (bid withdrawn)
Redwood City
PRIDE Industries (bid withdrawn)
Roseville
The following bids were considered for this project, shown by Group and the Schedule to
be awarded, including the estimated annual cost of paper products.
Bidder Bid (Annual Cost)
Group A. Schedule A
Korean Professional Building Maintenance $70,861.00
Advanced Property Services $85,346.75
East Bay Building Services $104,259.00
Kathleen's Kleaning Service, Inc. $152,813.22
Group B. Schedule B
Advanced Property Services $26,294.00
Korean Professional Building Maintenance $27,909.00
Kathleen's Kleaning Service, Inc. $33,163.69
East Bay Building Services $36,143.00
Group C. Schedule B
East Bay Building Services $39,879.00
Advanced Property Services $40,562.86
Korean Professional Building Maintenance $55,500.00
Group D, Schedule A
Korean Professional Building Maintenance $25,396.00
Advanced Property Services $31,542.00
WHEREAS, staff recommends that Korean Professional Building Maintenance, of
Stockton, be awarded a contract to cover janitorial services for Groups A and D (Police Facility,
Court No. 1, Library, and Hutchins Street Square); Advanced Property Services, of Sacramento,
be awarded a contract for Group B (City Hall, Finance Department, Carnegie Forum, and
portions of the Public Safety Building); and East Bay Building Services, of San Leandro, be
awarded a contract for Group C (Fire Administration, Parks and Recreation Administration,
Municipal Service Center, Transit Fleet Shop, and White Slough Water Pollution Control
Facility).
NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby award
two-year contracts for janitorial services for City facilities to Korean Professional Building
Maintenance, of Stockton, California, for Groups A and D in the amount of $192,514; Advanced
Property Services, of Sacramento, California, for Group B in the amount of $52,588; and East
Bay Building Services, of San Leandro, California, for Group C in the amount of $79,758; and
BE IT FURTHER RESOLVED that the City Council does hereby authorize the City
Manager to execute contract changes and extensions.
Dated: July 7, 2010
------------------
------------------
I hereby certify that Resolution No. 2010-104 was passed and adopted by the City
Council of the City of Lodi in a regular meeting held July 7, 2010, by the following vote:
AYES: COUNCIL MEMBERS— Hansen, Johnson, Mounce, and Mayor Katzakian
NOES: COUNCIL MEMBERS— None
ABSENT: COUNCIL MEMBERS— Hitchcock
ABSTAIN: COUNCIL MEMBERS— None
&JOHL
City Clerk
2010-104