HomeMy WebLinkAboutAgenda Report - July 1, 1992 (65)1-4 OF o4�,coa�'`v CITY OF LODI COUNCIL COMMUNICATION AGENDA TITLE: Plans and Specifications and Advertisement for Fids for Church Street Overlay, Lodi Avenue to Chestnut Street, Tokay Street Lo Vine Street MEETING DATE: July 1, 1992 PREPARED BY: Public Works Director RECOMMENDED ACTION: That the City Council approve th , u - anu peci , ications for the above project and authorize advertising for bids. BACKGROUND INFORMATION: This project consists of overlaying Church Street with asphalt concrete and pavement reinforce g fabric, repairing existing damaged curb and gutter, insta ling two concrete wheelchair ramps at Church Street and V tie Street, and other incidental and related work, all as shown on the plans and specifications for the project. During the paving portion of this project, traffic will be routed to Hutchins Street and Church Street will be closed between Vine Street and Lodi Avenue. The paving operation should only take on, day. Staff reviewed alternate intersection lane configuration and widening plans on Church Street approaching Lodi Avenue. The existir,; striping provides thy, h ,t operating conditions for the intersection at present volumes. Widening mnv needed in the future (15 years �). One concern about. the existing striping was that the northbound approach does not have a separate left -turn lane whereas the southbound approach does have a separate left -turn lane. Staff reviewed accident records for a 5 -year period (1987-1991). There hes been one reported accident which in.,olved a southbound left-turninq vehicle and a northbound through vehicle. It i s not possible to determine if this accident was caused by the dissimilar lane geometry. Staff will recommend installing the existing striping with the addition of a raised rnediar/bumpers to eliminate the southbound left turns into the Church Street driveway of Longs Drugstore and Wells Fargo Bank. There have been a number of rear -end accidents caused by drivers waiting for _a vehicle turning left into this driveway. Staff will notify the adjacent businesses and bring this item to City Council when the project is to be awarded. APPROVED THOMAS A PETERSON ` City Manger CCHURCl4%TY1W.02M (CO.COM) 1Q9:' Plans and Specifications and Advertisement for gids for Church Street Overlay, Lodi Avenue to Chestnut Street, Tokay Street :o Vine Street July 1, 1992 Page 2 FUNDING: Originally Budgeted: Fiscal year 1991/92 Budgeted Fund: Gas Tax Current Appropriation: $116,000 Total Project Estimate: 5117,000 Jack . Ronsko Publi Works Director Prepared by Lyman Chang, Assistant Civil Engineer JLR/LC/lm cc: Purchasing Officer Longs Drugstore Manager, Lodi Avenue Wells Fargo Bank Manager CITY COUNCIL JAMESW. PINKERTON, Mayor PHILLIP A PGNNINO Mayor Pro Yempore DAVID M. HINCHMAN JACK A SIEGLOCK JOHNR (Randy) SNIDER Wells Fargo Bank Attn: Branch Manager 120 W. Lodi Ave. Lodi, CA 95240 CITY OF LODI CITY HALL, 221 WEST PINE STREET RQ BOX 3006 LORI, CALIFORNIA 95241-1910 (209) 3345634 FAX (209) 333-6795 June 24, 1992 SUBJECT: Plans and Specifications and Advertisement for Bids for Church Street Overlay, Lodi Avenue to Chestnut Street, Tokay Street to Vine Street THCNW A. PETERSON City Manager ALICE M. REIMCHE City Clerk BOB MCNATT City Attorney Enclosed is a copy of background information on an item that will be discussed at the City Council meeting on Wednesday, July 1, 1992, at 7:30 p.m. The meeting will be held in the City Council Chamber, Carnegie Forum, 305 West Pine Street. You are welcome to attend. If you wish to communicate with the City Council, please contact Alice Reimche, City Clerk, at (209) 333-6702. If you have any questions about the item, please call Lyman Chang or me at (209) 333- 706. 4LR Ronsko Works Director Enclosure / cc: City Clerk ✓ Mame &Attn &Add &City Wells Fargo Bank Attn: Branch Manager 120 W. Lodi Ave. Lodi, CA 95240 Longs Drugstore Attn: Manager 100 W, Lodi Ave. Lodi, CA 95240