HomeMy WebLinkAboutAgenda Report - July 1, 1992 (65)1-4 OF
o4�,coa�'`v
CITY OF LODI COUNCIL COMMUNICATION
AGENDA TITLE: Plans and Specifications and Advertisement for Fids for Church
Street Overlay, Lodi Avenue to Chestnut Street, Tokay Street Lo
Vine Street
MEETING DATE: July 1, 1992
PREPARED BY: Public Works Director
RECOMMENDED ACTION: That the City Council approve th , u - anu peci , ications for
the above project and authorize advertising for bids.
BACKGROUND INFORMATION: This project consists of overlaying Church Street with
asphalt concrete and pavement reinforce g fabric, repairing
existing damaged curb and gutter, insta ling two concrete
wheelchair ramps at Church Street and V tie Street, and
other incidental and related work, all as shown on the plans and specifications for
the project.
During the
paving
portion
of this project, traffic will be routed to Hutchins Street
and Church
Street
will be
closed between Vine Street and Lodi Avenue. The paving
operation
should
only take
on, day.
Staff reviewed alternate intersection lane configuration and widening plans on
Church Street approaching Lodi Avenue. The existir,; striping provides thy, h ,t
operating conditions for the intersection at present volumes. Widening mnv
needed in the future (15 years �).
One concern about. the existing striping was that the northbound approach does not
have a separate left -turn lane whereas the southbound approach does have a separate
left -turn lane. Staff reviewed accident records for a 5 -year period (1987-1991).
There hes been one reported accident which in.,olved a southbound left-turninq
vehicle and a northbound through vehicle. It i s not possible to determine if this
accident was caused by the dissimilar lane geometry.
Staff will recommend installing the existing striping with the addition of a raised
rnediar/bumpers to eliminate the southbound left turns into the Church Street
driveway of Longs Drugstore and Wells Fargo Bank. There have been a number of
rear -end accidents caused by drivers waiting for _a vehicle turning left into this
driveway. Staff will notify the adjacent businesses and bring this item to City
Council when the project is to be awarded.
APPROVED
THOMAS A PETERSON
`
City Manger
CCHURCl4%TY1W.02M (CO.COM) 1Q9:'
Plans and Specifications and Advertisement for gids for Church Street Overlay,
Lodi Avenue to Chestnut Street, Tokay Street :o Vine Street
July 1, 1992
Page 2
FUNDING: Originally Budgeted: Fiscal year 1991/92
Budgeted Fund: Gas Tax
Current Appropriation: $116,000
Total Project Estimate: 5117,000
Jack . Ronsko
Publi Works Director
Prepared by Lyman Chang, Assistant Civil Engineer
JLR/LC/lm
cc: Purchasing Officer
Longs Drugstore Manager, Lodi Avenue
Wells Fargo Bank Manager
CITY COUNCIL
JAMESW. PINKERTON, Mayor
PHILLIP A PGNNINO
Mayor Pro Yempore
DAVID M. HINCHMAN
JACK A SIEGLOCK
JOHNR (Randy) SNIDER
Wells Fargo Bank
Attn: Branch Manager
120 W. Lodi Ave.
Lodi, CA 95240
CITY OF LODI
CITY HALL, 221 WEST PINE STREET
RQ BOX 3006
LORI, CALIFORNIA 95241-1910
(209) 3345634
FAX (209) 333-6795
June 24, 1992
SUBJECT: Plans and Specifications and Advertisement for Bids for
Church Street Overlay, Lodi Avenue to Chestnut Street,
Tokay Street to Vine Street
THCNW A. PETERSON
City Manager
ALICE M. REIMCHE
City Clerk
BOB MCNATT
City Attorney
Enclosed is a copy of background information on an item that will be
discussed at the City Council meeting on Wednesday, July 1, 1992, at
7:30 p.m. The meeting will be held in the City Council Chamber,
Carnegie Forum, 305 West Pine Street. You are welcome to attend.
If you wish to communicate with the City Council, please contact
Alice Reimche, City Clerk, at (209) 333-6702.
If you have any questions about the item, please call Lyman Chang or
me at (209) 333- 706.
4LR
Ronsko
Works Director
Enclosure /
cc: City Clerk ✓
Mame
&Attn
&Add
&City
Wells
Fargo Bank
Attn:
Branch Manager
120 W.
Lodi Ave.
Lodi,
CA 95240
Longs
Drugstore
Attn:
Manager
100 W,
Lodi Ave.
Lodi,
CA 95240