AGENDA TITLE: Adopt Resolution Approving One -Year Extension of Fiscal Year 2009/10 Curb,
Gutter and Sidewalk Replacement Contract with Jeff Case Construction Company,
of Galt, for Fiscal Year 2010/11 ($46,570)
MEETING DATE: June 16,2010
PREPARED BY: PublicWorks Director
RECOMMENDED ACTION: Adopt a resolution approving a one-year extension of Fiscal Year
2009/10 Annual Curb, Gutter and Sidewalk Replacement contract
with Jeff Case Construction Company, of Galt, for Fiscal Year
2010/11 in the amount of $46,570.
BACKGROUND INFORMATION: The Annual Curb, Gutter and Sidewalk Replacement Contract is
administered by the Streets and Drainage Division. This contract
provides for the replacement of damaged sidewalk at various
locations as guided by the Sidewalk Replacement Program and
sidewalk inventory.
Jeff Case Construction Company is currently under contract to perform the above -referenced services.
Section 6-04.03 of the contract allows that "by mutual agreement, the City and Contractor may enter into
an agreement for an annual extension of this contract based upon the same terms and conditions set
forth herein." Jeff Case Construction Company has agreed to honor the prices from the FY 2009/10
contract with no increase for FY 2010/11. Jeff Case Construction Company has provided excellent
service and produced high-quality product underthe existing contract.
FISCAL IMPACT: This contract reducesthe potential for trip and fall claims resultingfrom
damaged or offset sidewalk panels.
FUNDING AVAILABLE: Fiscal Year 2010/11 Transportation Development Act Bicycle and Pedestrian
Funn:::4
46,570
Jordan Ay rs
Deputy City Manager/I ernal Services anager
C Q�tiL
FANally Sw lin
PublicWorks Director
Prepared by Curtis Juran, Streets and Drainage Superintendent
FWS/CJ/dsg
Attachment
cc: Curtis Juran, Streets and Drainage Superintendent
APPROVED:
Konrad Bartlam, Interim City Manager
K:\WP\COUNCIL\2010\ ContractExtension_JeffCase.doc 6/3/2010
CONTRACT EXTENSION AGREEMENT
2009/2010 CURB, GUTTER, AND SIDEWALK REPLACEMENT
ANNUAL CONTRACT
THIS CONTRACT EXTENSION AGREEMENT, made and effective this 1st day of July,
2010, by and between the CITY OF LODI, a municipal corporation, hereinafter called "Owner'.
and JEFF CASE CONSTRUCTION COMPANY, hereinafter called "Contractor."
WITNESSETH:
CONTRACT: Contractor and Owner, entered into the 2009/2010 Curb, Gutter, and
Sidewalk Replacement Annual Contract on July 1, 2009, providing that the contract
could be extended by mutual agreement of the parties.
2. TERM AND TERMS: The term of this Contract Extension Agreement shall be for a
period of one (1) year, commencing immediately and terminating June 30, 2011. The
Contract may be extended by mutual agreement of the parties, and with City Council
approval, for an additional term as specified. All other terms and conditions will remain
as set forth in the 2009/2010 Curb, Gutter, and Sidewalk Replacement Annual Contract,
attached hereto as Exhibit and made a part hereof as though fully set forth herein.
IN WITNESS WHEREOF, Owner and Contractor have executed this Contract Extension
Agreement on ,2010.
CITY OF LODI, a municipal corporation JEFF CASE CONSTRUCTION COMPANY
hereinabove called "Owner" hereinabove called "Contractor'
KONRADT BARTLAM, Interim City Manager
Attest:
RANDI JOHL, City Clerk
Approved as to Form:
JANICE D. MAGDICH, Deputy City Attorney tV
JEFF CASE, Owner
Exhibit A
2009/2010 CURB, GUTTER, and SIDEWALK REPLACEMENT
ANNUAL CONTRACT CONTRACT
CITY OF LODI, CALIFORNIA
THIS CONTRACT made by and between the CITY OF LODI, State of California, herein
referred to as the "City," and JEFF CASE CONSTRUCTION COMPANY, herein referred
to as the "Contractor."
WITNESSETH:
That the parties hereto have mutually covenanted and agreed, and by these presents do
covenant and agree with each other, as follows:
The complete Contract consists of the following documents which are incorporated
herein by this reference, to -wit:
Notice Inviting Bids
The July 1992 Edition,
Information to Bidders
Standard Specifications,
General Provisions
State of California,
Special Provisions
Business and Transportation Agency,
Bid Proposal
Department of Transportation
Contract
All of the above documents, sometimes hereinafter referred to as the "Contract
Documents," are intended to cooperate so that any work called for in one and not
mentioned in the other is to be executed the same as if mentioned in all said documents,
ARTICLE I - That for and in consideration of the payments and agreements hereinafter
mentioned, to be made and performed by the City, the Contractor agrees with the City,
at Contractor's cost and expense, to do ail the work and furnish ail the materials except
such as are mentioned in the specifications to be furnished by the City, necessary to
construct and complete in a good workmanlike and substantial manner and to the
satisfaction of the City the proposed improvements as shown and described in the
Contract Documents which are hereby made a part of the Contract.
ARTICLE 11 - The City hereby promises and agrees with the Contractorto employ, and
does hereby employ, the Contractor to provide all materials and services not supplied by
the City and to do the work according to the terms and conditions for the price herein,
and hereby contracts to pay the same as set forth in Section 5,600, "Measurement,
Acceptance and Payment," of the General Provisions, in the manner and upon the
conditions above sat forth; and the said parties for themselves, their heirs, executors,
administrators, successors and assigns, do hereby agree to the full performance cf the
covenants herein contained.
R:lGROUP1STREETS1SIDEWALK1Annual Sidewalk Replacement Contracts & PO's12002.20101Contract42009.2010.doc 4.1 00104/2009
ARTICLE III - The Contractor agrees to conform 40 the provisions of Chapter 1, Part 7,
Division 2 of the Labor Code. The Contractor and any Subcontractor will pay the general
prevailing wage rate and other employer payments for health and welfare, pension,
vacation, travel time, and subsistence pay, apprenticeship or other training programs.
The responsibility for compliance with these Labor Code requirements is on the prime
contractor.
ARTICLE IV - And the Contractor agrees to receive and accept the following prices as full
Compensation for furnishing at materials and for doing all the work contemplated and
embraced in this agreement; also for all loss or damage arising out of the nature of the
work aforesaid or from the action of the elements, or from any unforeseen difficulties or
obstructions which may arise or be encountered in the prosecution of the work until Its
acceptance by the City, and for all risks of every description connected with the work;
also for all expanses incurred by or In consequence of the suspension or discontinuance
of work and for well and faithfully completing the work, and the whole thereof, in the
manner and according to the Contract Documents and the requirements of the Resident
Engineer underthem, to -wit;
Perform the work necessary to remove and replace curb, gutter and sidewalk in various
locations throughout the City and other incidental and related work, all as shown on the
plans and specifications for the above project. This is an annual unit price bid and the
work will be divided into purchase orders which will usually range in price between $500
and $20,000, all as shown on the plans and specifications for "200912010 Sidewalk
Repair Program and Miscellaneous Concrete Work".
Rt1QItOUP1STRrzETS1SIOE•WAI.K1Nnnual Sidewalk Replacement Contracts & PO'812008.20•I01Cnntract#2009.2010.doo 4.2 owdlanoo
60OZA119 E -V COP'O&OZ-600e=a4UO3\CWZ-60oaS,od 32 =e=o3zueulaoqda8 MPMaP!S]2nU�l-IVAA3(IISXS.L33ULMdrIOM:ZI
oo,00c-;,z
00.OL
_is
o9z
AePASALJCI 18!31;DLULUOO IleISUI
—E:
oo-c-;
(As ODE:<) 42-AA—GAIla je!jUaPjSGU JO 311'eAWp!S fj-P-�jU—j
ZL
oo-gzg 2
SE9
009 L
-flki i- 311SAA9p!S fleISUI
-9S OOE: -AP-PA-SAP(] kl
91 -P!Sei�l lo
)
oo"OS;Z't'L
0-2 * 6
005L
(jS AEM9Aljc[ fullueplSeE Jo )j]Waep!s flapul
OL
00,009
O
'le4n!D pue qjnojepun nS40ou
6
00,00t,
V2
0—
Beiv ielueij ul lo memems japunke-WnS looa
—9
00,0Z
0 —
lapnE) pue qjno ed eLUWOO 9AOW8�j
ie;4nE) pue qjno;@clA-AemeAp(3 aAowqE
_L
9
00'9L
Al
0
—
japnE) pue qjno adA_L-1 aoqjeA 15A—owa-8
9
oo*gzz
00*0 L
is
AS
0
0s;
jagnE) pueqlno;@dA i enbS75mwa�
N18A&GP!S IE!OJZWUJOO QAOW%
9pjouo:D jjeT4d TO ifIF-Ift6PIS 9AOUJ8U
—I,
—Z
Pun
T
919JOU00 no meS
I Item
Description
Unit
Price
Total
14
Install Square-TyRe Curb and Gutter 7 -inch or less 0 - 20 L
20
LF
$ 30-00
$ 60€I.00
15
nstall Square -Type Curb and Gutter? -inch or less (>20 L
20
LF
25.00
500.00
16
Install Square -Type Curb and Gutter Greater than 7 -inch 0- 20 LF
20
LF
30.00
600.00
17
Square -Type Curb and Gutter Greater than 7 -inch >20 LF)
20
LF
25.00
500.00
118
Install Vertical -Type Curb and Gutter 0 - 20 L
20
LF
30.00
600.00
19
Install Vertical -Type Curb and Gutter (>20 LF)
20
LF
25.00
540.00
20
install Driveway -Type Curb and Gutter 0 - 20 LF
20
LF
30.00
600.00
21
Install Driveway -Type Curb and Gutter >20 LF
20
LF
25.00
500.00
22
install Tree Well
1
EA
350.00
358.00
23
install Furnished Side -Inlet Catch Basin Assembly
0
EA
700.00
I
{
24
Install Catch Basin Barrel
0
EA
1,200.00
25
install Furnished Street Name Sign Base
LF
200.00
200.00
26
Miscellaneous Concrete Saab rade Com action
s0
LF
2.95
147.50
f
27
Move -In Cost for Jobs <$200
2
FA
250.00
1 500.00
TOTAL BI®
1 $ 46,670.00
RAGROt1PWREETS4SIDEWALKAnnual Sidewalk Replacement Contracts & PO5520o9-20101Contmct,2009-2010.doc 4.4 6/4/2009
ARTICLE V - By my signature hereunder, as Contractor, I certify that I am aware of the
provisions of Section 3700 of the Labor Code, which requires every employer to be insured
against liability for workers' compensation or to undertake self-insurance in accordancewith the
provisions of that code, and I will comply with such provisions before commencing the
performance cf the work of this contract.
ARTICLE VI - it is further expressly agreed by and between the parties hereto that, should there
be any conflict between the terms of this instrument and the Bid Proposal of the Contractor,
then this instrument shall control and nothing herein shall be considered as an acceptance of
the said terms of said proposal conflicting herewith.
ARTICLE VII - The City is to furnish the necessary rights-of-way and easements and to
establish lines and grades for the work as specified under tho Special Provisions. All labor or
materials not mentioned specificallyas being done by the City will be supplied by the Contractor
to accomplish the work as outlined in the specifications.
ARTICLE VIII - The Contractor agrees to commence work pursuant to this contract as directed
by the City during the 2009/2090 fiscal year,
R:ICROUP\STREETS1SIDEWALK\Annual Sidewalk Replacement Contracts & PO's12009.20101Contmct#2000.2010.doe 4.6 6!9/2009
WHEN SIGNING THIS CONTRACT, THE CONTRACTOR AGREES THAT THE TIME OF
COMPLETION FOR THIS CONTRACT IS REASONABLE AND THE CONTRACTOR AGREES
TO PAY THE CITY LIQUIDATED DAMAGES AS SET FORTH IN SECTION 6-04.03 OF THE
SPECIAL, PROVISIONS. CONTRACTOR AGREES THAT THIS AMOUNT MAY BE
DEDUCTED FROM THE AMOUNT DUE THE CONTRACTOR UNDER THE CONTRACT.
IN WITNESS WI--IEREOI!', the parties to these presents have hereunto set their hands the year
and date written below.
CONTRACTOR:
By:
t (("s
Jill
f
Title
(CORPORATE SEAL)
CITY OF LODI
By:
Blair King
City Manager
4 — c'
Date:
At
Ran ,lohl
City Clerk
Approved as to form:
D. Stephen) Schwabouer
Gity A -ttorney
"'Idpwalk Rep!"Acemont Contracts FA 4.6 0111/2009
RESOLUTION NO. 2010-92
A RESOLUTION OF THE LODI CITY COUNCIL APPROVING
ONE-YEAR EXTENSION OF 2009/10 ANNUAL CURB, GUTTER,
AND SIDEWALK REPLACEMENT CONTRACT WITH JEFF
CASE CONSTRUCTION COMPANY FOR FISCAL YEAR 2010/11
WHEREAS, the Annual Curb, Gutter, and Sidewalk Replacement Contract is for
replacement of existing damaged sidewalk locations as guided by the sidewalk
replacement program and sidewalk inventory; and
WHEREAS, Jeff Case Construction Company, of Galt, California, is the company
currently under contract; and
WHEREAS, Section 6-04.03 of the contract allows that "by mutual agreement,
the City and Contractor may enter into an agreement for an annual extension of this
contract based upon the same terms and conditions set forth herein"; and
WHEREAS, Jeff Case Construction Company has agreed to honor the prices
from the 2009/10 contact with no increase for the 2010/11 fiscal year and has provided
excellent service and a very good product during the existing contract.
NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby
approve a one-year extension of the 2009/10 Annual Curb, Gutter, and Sidewalk
Replacement Contract with Jeff Case Construction Company, of Galt, California, in the
amount of $46,570.
Dated: June 16,2010
-------------------------------------------------------------------
...................................................................
hereby certify that Resolution No. 2010-92 was passed and adopted by the City
Council of the City of Lodi in a regular meeting held June 16, 2010, by the following vote:
AYES: COUNCIL MEMBERS — Hansen, Hitchcock, Johnson, and Mounce
NOES: COUNCIL MEMBERS— None
ABSENT: COUNCIL MEMBERS— Mayor Katzakian
ABSTAIN: COUNCIL MEMBERS— None
&JOHIL
City Clerk
2010-92