HomeMy WebLinkAboutAgenda Report - June 2, 2010 D-06AGENDA ITEM b440
CITY OF LODI
COUNCIL COMMUNICATION
AGENDA TITLE: Adopt Resolution Approving the Purchaseof Padmount Transformers from Pacific
Utilities of Pleasant Hill, CA ($58,361.77) (EUD)
MEETING DATE: June 2,2010
PREPARED B Y Interim Electric Utility Director
RECOMMENDED ACTION: Adopt a resolution approving the purchase of padmount
transformers from Pacific Utilities of Pleasant Hill, CA ($58,361.77).
BACKGROUND INFORMATION: On February 17,2010, the City Council authorized the
advertisement for bids for padmount transformers.
On April 21, 2010, bids were opened for padmount transformers. Four suppliers submitted bid proposals.
Life -cycle costs (total purchase price plus cost of estimated power loss during the projected life of the
transformer) for responsive bids were evaluated. Pacific Utilities of Pleasant Hill, showed the lowest life-
cycle cost total for all advertised padmount transformers. A summary of the bid evaluation is attached to
this Council Communication.
12 each 37.5kVA, I -Phase
240/120V
Pacific Utilities
$17,395.65
9 each 50kVA, I -Phase
240/120V
Pacific Utilities
$15,111.90
leach 75kVA, I -Phase
240/120V
Pacific Utilities
$ 1,904.21
4 each 75kVA, 3 -Phase
208Y1120V
Pacific Utilities
$18,631.05
1 each 112.5kVA, 3 -Phase
480Y1277V
Pacific Utilities
$ 5,318.96
1 each 167kVA, I -Phase
240/120V
All Bidders
*Refected
$�8
*The 167kVA 1 -Phase 2401120V transforrnerwas rejected because all bidders provided the primary voltage of the tansfomreras delta instead
of wye.
FISCAL IMPACT: Purchase price is $58,361.77. Life -cycle cost is $85,548.03.
FUNDING AVAILABLE: Included in FY Budget 2009-10 Account No. 160651.7711.
Jordan Ayers, Deput City Manager
Kenneth A. Weisel, P.K.
Interim Electric Utility Director
PREPARED B Y Demy Bucaneg. Jr. -PE, Assistant Electric Utility Director
Weldat Haile—PE, Senior Power Engineer
Konridt Bartlam, Interim City Manager
RESOLUTION NO. 2010-82
A RESOLUTION OF THE LODI CITY COUNCIL
APPROVING THE PURCHASE OF PADMOUNT
TRANSFORMERS
WHEREAS, in answer to notice duly published in accordance with law and the order of
this City Council, sealed bids were received and publicly opened on April 21, 2010, at
11:00 a.m. for the purchase of padmount transformers for the Electric Utility Department,
described in the specifications therefor approved by the City Council on February 17, 2010; and
WHEREAS, said bids have been compared as to life -cycle costs, checked, and
tabulated and a report thereof filed with the City Manager as shown on Exhibit A attached.
NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby approve
the purchase of padmount transformers as follows:
12 each 37.5kVA, I -Phase
9 each 50kVA, I -Phase
leach 75kVA, I -Phase
4 each 75kVA, 3 -Phase
1 each 112.5kVA, 3 -Phase
240/120V
Pacific Utilities
$17,395.65
240/120V
Pacific Utilities
$15,111.90
240/120V
Pacific Utilities
$ 1,904.21
208Y/120V
Pacific Utilities
$18,631.05
480Y/277V
Pacific Utilities
$ 5,318.96
........------------
Total $58,361.77
to Pacific Utilities, of Pleasant Hill, CA, in the amount of $58,361.77; and
BE IT FURTHER RESOLVED that the Lodi City Council does hereby reject all bids for
the 167kVA I -Phase 240/120V transformer.
Dated: June 2, 2010
I hereby certify that Resolution No. 2010-82 was passed and adopted by the City
Council of the City of Lodi in a regular meeting held June 2, 2010, by the following vote:
AYES: COUNCIL MEMBERS — Hitchcock, Hansen, Johnson,Mounce, and
Mayor Katzakian
NOES: COUNCIL MEMBERS — None
ABSENT: COUNCIL MEMBERS — None
ABSTAIN: COUNCIL MEMBERS — None
RANDI JOHL
City Clerk
KIT[W YA
r Bid Evaluation
Padrrlount I
l
j
Tax (factor):;
1.0875 I
�..,.
Primary Winnings:; Three -Phase, 12000Volt,60Hz, Delta Connected
W April. 26, 2010
- >1: "I
No Load Loss$/wan:!
Load Loss $/watt: i
3.75
1.25
I
iSiagle�P}me, 12000Grd, Wye/6934 V It, 6OHz
Vendor
Unit
Extended
Price i_No
Load
i.oad No Load ' Load
Cost of
Life Cycle Delive
Height jimpedance I
1
Price $
Price S
w/tax $
Loss (watts)- Loss (watts)1 Loss value', Loss value I
Losses $
Cost S (weeks) !
(inches} 1
Bi d Item- 1: 37.5 kV 24 112 Volt, Singe Ph
P
1,890.001
2,999.001
1
1751.001
2,164.13f
3_,261.41 [
2,178.26:
1,904.1
i
1
1421
142'
�
N m r f ni :•
12
I
1
65 >1.5
Vendor j
Unit
Extended
Price I No Load
Load
No Load
Load
Cost
LifeC a
Delivery
ry
Hei hl ;Impedance__
g
Price $
Pr ce $
wft'ax S Loss (watts) I
Loss (watts);
Loss value :
Loss value
Losses $ I
Cost S
weeks
inches j % j
Hees Enterprises, Inc. (Ermco Transformers) j
Howard Industries. Inc.
1,408.00;
1,460.001
16,896.001
17,520.00!
18,374.401 821
19,053.00i 811
4111
4301
3.690.00,
3,645.00;
6,165.001
6,450.00
9,855.00;
10,095.00€
28,229.4011
29,148.00_;
0,
6-81
281 2.0W—
24i 2.700;
HDSuppIKUliiitiesLtd. ooperPower Systerr
Pacific Utilities (AB8 Transformers)
1,408.561
1,333.00;
16,8 6.0 i
15,996.001
18,374.401 E
17,395-65! 791
420
377'.
3,960.00;
3,555.00;
6,300.00;
5,655.00;
10,260.00;
9,210.00;
28,634.40]
26,605.651
81
8-101
241 1.900
24; 1.7401E
Height Ilrnpedance !
inches %
1
ees n erprises, nc. rmco Transformers)
-ftwaupPy ustiiesUd. ooper ower ysteul
Pacific Utilities rans ormers
05
J2fi7"2.01 o
Z-5'6'0.55L�S0
1461
ia2€
2141
11 _
ca�ai 9 73n nnl 4 &70.001
621 i 3210-001 3.105.00'1
7 Bon.oDi
6.315.00!
I
31-224.85 6 8
24.946.05; 8 -141
4F3 1
481
2.200
3.1201E
I
71.61_
Bid Item 2: 50 kVA, 2401120 Volt, Single Phase
Pad,
Numberof
units:;
9
Bid Item 5; 112.5 kVA, 4BOY1277 Volt, Three Phase Pad, I
I Number of Unitsa
1
651
>2.0;
Vendor j
Unit
j Extended
Price No Load f
Load 11 No Load
Load
Cost of
Life Cycle 1
Delivery
Heighl 1 mpe ante'
Load 1 No Load Load '
Price S
Prices
wltax $ Loss (watts)!
Loss (watts);
Loss value 1
Loss value ';
Losses S :
Cost S
(weeks) (inches)
i %
Hees Enterprises, Inc. (Ermco Transformers) I
1,575.00!
14,175.00j
15,415.31; 1DD1
517:
3,375.00[
5,816.25
9,191.251
24,606.56E
81
i
28' 2.100;
Howard Industries,inc_ I
1,727.001
15,543.001
16,903.011 991
555!
3,341.25:
6,243.75;
9,585.001
26,488.011
6-81
241 2.800;
HD Supply Utilities Ltd. (Cooper Power System:
1,652.001
14,868.001
16,168.95'; 1041
5121
3,510.001
5,760.001!
9,270 00'
25,438.95-
84
241 2.0701 E
Pacific Utilities (ABB Transformers)
1,544.00€ 13,896.001
15,111.90; 107
mm 410
3,611.251
4,612.50,
8,223 751
23,335.65
1O -Aug-
241 1.940';�E
Bid Item 3 75 kVA, 2401120 Volt, Single Phase Pad,
-
Nur Units:
�..,.
651
- >1: "I
Vendor
Unit
Extended
Price i_No
Load
i.oad No Load ' Load
Cost of
Life Cycle Delive
Height jimpedance I
1
Price $
Price S
w/tax $
Loss (watts)- Loss (watts)1 Loss value', Loss value I
Losses $
Cost S (weeks) !
(inches} 1
ees nterpnses.nc- �rrtco ransormers
I Howard Industries. Inc. i
HD Supply Utilities Ltd. (Cooper Power System,
Parl 7ifi fflltles(ABBTransformers) i
1, D;
2999.00;
2,003.001
1,751.DO
1,890.001
2,999.001
1
1751.001
2,164.13f
3_,261.41 [
2,178.26:
1,904.1
i
1
1421
142'
�
(
—882.50'
=�:
710! 532.50; 887.50'
661: 532.501 826.25
7731 423.75: 966.2
1
1,420.00:
1,355.75:
1,390.006
8
_
4,681.411----6:61
3,537.01 i 81
3,294.21 8-10
281
24:
241
24'
2.1001
3.1001
1 9501
2140E
LE
Bid Item 4: 75 kVA, 208Y/120 Vo€t, Three Phase Pad I
-
Number of units:;
4 I
65
>1.81
Vendor
mm
Unit t --Extended !
Price $ Price $
PriceNo
wAax $ _ p
Load j Load- No load Load j Cost of j
Loss (watts) I Loss (wafts); Loss value E Loss value I Losses5
Life Cycle I Delivery I
Cost S weeks
Height Ilrnpedance !
inches %
1
ees n erprises, nc. rmco Transformers)
-ftwaupPy ustiiesUd. ooper ower ysteul
Pacific Utilities rans ormers
05
J2fi7"2.01 o
Z-5'6'0.55L�S0
1461
ia2€
2141
11 _
ca�ai 9 73n nnl 4 &70.001
621 i 3210-001 3.105.00'1
7 Bon.oDi
6.315.00!
I
31-224.85 6 8
24.946.05; 8 -141
4F3 1
481
2.200
3.1201E
Bid Item 5; 112.5 kVA, 4BOY1277 Volt, Three Phase Pad, I
I Number of Unitsa
1
651
>2.0;
06-02-10 DB PaVePtfltlt TR Award -Exhibit Ails
Unit
Extended
Price
No Load 11
Load 1 No Load Load '
Cost of
Life e 1 Delivery 1
Height :Impedance I
six V }!q!14x3- pjemV a_L junowped So 0 i,-Zo-90
1,9ML
"ON junOOOV fISS
S0'849'q8$
saWMn OUPed
:Vj
wic4suaii Jun U -Ped uqi jol fL-,Odojd P?e Isamo-?
$ �,ie�4oj(slow �joisuej-L ��]Eiv)salilmn �,jy,oej
vz81,L6
S I laloi 'Pll Sat nwin Aid nS CJH
6£'CL4'C6
SnPul pJernaH
S elan ouj 'S&IJ ',Snpul
esz/z,u;
S j -L (sl9wJ01su2ii 0--WJ3) -aUl '$asj-) 04J3 8aOH
3100C7
tz
0�-2
00"G9E:,z
----iT6—ut
�00'917J7'� !00, L qg�L
IpFt?z
lon;go,c
00 E-o�
�i 1: eav) —SGIIII!ln
3 CTL'—Z',C)C
18 69,m,9
oo,gsg,z
100-599`4 [00"066 Zlcci
tlgz ?69-Ui;'S
04'g06`£
H
000-e
1 t7Z
12-9 lZWOWL
9L'£92 -
-Z
09�LLL �gZ.qZo Z?t,�
--- ---
Z 188-gSO,5;
67V
1 o —66 q 9
'ouf 's@PIsnPul PJL-mOH
tsjGw;ojSuLJ-L 0oLvjHj)cuj 'sasudalu3 s*31-1
%
(Sal oul
i SjGGh\) ljoS
S sassol
1 amen GSOJ aqLA sGorl S}jem) ssoj'(s,,jetA)
ss5'1�!S xe;IPA
S so!jd
$
—*)Oljd
aouepdw I: I46PH
AJaMI'90 alOA0 @J! --;o
isao
peO-PeOl ON peol
Pe<)-? ON
p0pvalX3
Pn
IOPuM
1:s;!un jo joq NI
PEd 9Sp4d a[BuIS II&A Oi --.9 -DII P!G
. ... .. .........
f
--3IO99 —Zev
Zn-v-oi, —igtggc'L
59
—(sjaw*JajsuE5-L gev) —saivilin ouioad
31DZ6Z
09
18 i60*L46'8
jgZ'9217'Z
09-1 w i, I S;L 890, ;BELL
12'a 2: j48,494,9
00, it,6,9
Do, L46,q
----------
',walsAs jamoj Jsd000) --pi-j-so!iimnTjddn—S
OH
!004'Z
S4loL-8
L17,099,L
00,gLI7,z
uwff`L 19Z'9L0'L 16LLL
LRz 1 ws;LVS
00'69L'17
100'69100'69L`4ou
I 'soP;snpul Pj8mOH
ooZ,Z
67
8 !4z-9Sz,3
9L-849'3
00-99L IL09L
/oz GV929's
oo'pZL'9
001C ,'S
(sJaWJ0lsul-li wJ3)'Oul 'SO3; d'D;u3 SGGH
—�W
-
(s a s isoo
s sasso,
sso-i ani EA SSO I (SIJI-W S�SO�Rsllum) =Sol =Xavm�l
� �-Ild
I�S e�ll�d
I
9z,
[:;Iem]8 ssoq Pal
oi,oz,9Z I!Jciv
F---T—gj-c
5iem sso-1 Poo -i 6N
Pa40GUUO0 MPCI 'ZH09 '110A COV 1, 'aSe46-@;)J4-L:; 'SB UIP UIAA "UuLutici gzwL
mm
;:{JmLj} Xeil
;Unowped
7—
oLozT'i,z lIAV',:Buivado p!g
UoijenjeAd p!q aaLULojSUeI.L