Loading...
HomeMy WebLinkAboutAgenda Report - June 2, 2010 D-03�03AGENDA ITEM CITY OF LODI COUNCIL COMMUNICATION im AGENDA TITLE: Approve Plans and Specifications and Authorize Advertisement for Bids for Lockeford Street Railroad Crossing Removal Project MEETING DATE: June 2,2010 PREPARED BY: PublicWorks Director RECOMMENDED ACTION: Approve the plans and specifications and authorize advertisement for bids for Lockeford Street Railroad Crossing Removal Project. BACKGROUND INFORMATION: This project consists of removal of railroad tracks and equipment; construction of approximately 740 tons of asphalt paving, 4,670 square feet of asphalt concrete sidewalk, 810 linearfeet of concrete curb and gutter, 153 linearfeet of 10 -inch and 12 -inch storm drain pipes, 80 linearfeet of 8 -inch water pipe; and other incidental and related work, all as shown on the plans and specifications for the project. The location of the project is shown on ExhibitA. The existing railroad tracks crossing Lockeford Street, Main Street, Stockton Street, Washington Street and Cherokee Lane were abandoned by Union Pacific Railroad in 2004. The abandonment allows the City to remove the railroad tracks and the associated equipment at the locations mentioned above. The street pavement will be repaired after track removal resulting in a safer and smoother ride along Lockeford Street and the adjoining streets. The finished project will provide safer and improved travel on Lockeford Street. Funding for the project is provided by Measure K and it is a part in the Central City Rail Safety Project. The project has been delayed for several years hoping it could have been combined with the larger project that would widen Lockeford Street to four lanes. That is not feasible at this time due to right-of-way and funding constraints. The plans and specifications are on file in the Public Works Department. The planned bid opening date is June 22,2010. FISCAL IMPACT: The project will reduce the maintenancecost of the deteriorating pavement sections on Lockeford Street. FUNDING AVAILABLE: The moneyfor this projectwill be coming from Street Impact Fees and Measure K funds (Central City Railroad Safety Project). A request for appropriation of funds will be made at contract award. Project Estimate: $350,000 5 F. Wally Sandelin Public Works Director Prepared by Lyman Chang, Senior Civil Engineer FWSILCIpmf Attachment cc: Purchasing Division Deputy Public Works DirectorSwimley Senior Civil Engineer Chang APPROVED: Konrlff Bartlam, Interim City Manager K:IWPIPROJECTSISTREETSfLockeford StuockefordStRailroad RemovaINCPS&A.doc 512412010 n CITY OF LODI sl PUBLICWORKSDEPARTMENT E � av 0 3�p L DI Won LAK I I Won < \ \ \ J _J \ \ LOCKEFORD ST \ �� Ba be ELM ST LODI AVE EX MIT A Lockeford Street Railroad Removal Project Main Street to Cherokee Lane TOKAY ST VINE ST G �' � IN to I- L) I N 3 TAYLOR RD r TO HWY. LOWS S 12 KETTLEMAN LN E I-5 I - - 5 MI. _ E I- O Z LdLd 1n N la o! 3 = O J LODI AVE EX MIT A Lockeford Street Railroad Removal Project Main Street to Cherokee Lane TOKAY ST VINE ST �' � IN to I- L) I N r N z e I - - _ E I- 0 N la = U z I J Q 2 I CENTURY BLVD I I I I HARNEY LANE T TD SACRAMENTO 33 MI. rn rn TO STOCKTON 10 Mi. TURNER RD I I I S.P.R.R. I VICTOR RD. HWY. 12 Q tL U � 1 I PROJECT LOCAT� ON I UI i 0 1/8 1/4 3/8 1/2 MILE 0 1000 2000 3000 FEET