Loading...
HomeMy WebLinkAboutAgenda Report - June 1, 2011 C-09AGENDA ITEM%m*40 • '• CITY OF LODI COUNCIL COMMUNICATION AGENDA TITLE: Adopt Resolution Authorizing City Manager to Execute Contract for Van Buskirk Park Playground Replacement, 600 North PleasantAvenue, with A. M. Stephens Construction Company, Inc., of Lodi ($47,410) MEETING DATE: June 1,2011 PREPARED BY: Public Works Director RECOMMENDEDACTION: Adopt resolution authorizing City Manager to execute contract for Van Buskirk Park playground replacement, 600 North Pleasant Avenue, with A. M. Stephens Construction Company, Inc., of Lodi, in the amount of $47,410. BACKGROUND INFORMATION: This project is part of the Parks and Recreation Department's 2010/11 Community Development Block Grant (CDBG) allocation. The work consists of removal and disposal of the existing playground equipment, 3,000 square feet of existing poured -in-place surfacing material and two concrete ramps. New work will include providing and installing one matrix net cable climber, one two -bay arched swing, two concrete ramps, new engineered wood Fibar safety surfacing material and turf. The projectwill also remove approximately 600 square feet of concrete walkway and replace it with approximately 540 square feet of a new redesigned concrete path of travel from PleasantAvenue to the playground equipment. The specifications were approved on April 6, 2011. The City received the following nine bids on May 4, 2011: Bidder Location Bid Engineer's Estimate $79,900.75 A. M. Stephens Construction Lodi $47,410.00 Playscape Construction Tracy $52,650.00 Harris Builders, Inc. Hilmar $54,400.41* WhoBuilt Creative Petaluma $57,512.00* Diede Construction Woodbridge $61,332.09 Haskell & Haskell Engineering Knights Ferry $64,928.98* Elite Landscaping Clovis $67,809.00 Community Playgrounds Novato $68,649.70* McNabb Construction Lafayette $84,385.00 " Corrected figure FISCAL IMPACT: Funds for this projectwill be from the 2010/11 Urban County CDBG allocation and there will be no direct impact to the Park Division budget for the playground replacement improvements at Van Buskirk Park. FUNDING AVAILABLE: Urban County DBG Funds (Project 10-04): $166,240.84 ds�� N --u . <-- Jordan Ayers Deputy City Manager/Internal Services Director gimes M. Rodems &7f F. Wally Sandelin Parks, Recreation& Cultural Services Director Public Works Director Prepared by Wesley K. Fujitani, Senior Civil Engineer cc: Joseph Wood, Service Manager APPROVED: Steve Virrey, Parks Project Coordinator Konradt Bartlam, City Manager K:\WP\PROJECTS\PARKS\Van Buskirk Park Playground Improvements\CAward.doo 5/23/2011 VAN BUSKIRK PARK PLAYGROUND IMPROVEMENTS 600 NORTH PLEASANTAVENUE CONTRACT CITY OF LODI, CALIFORNIA THIS CONTRACT made by and between the CITY OF LODI, State of California, herein referred to as the "City," and A. M. STEPHENS CONSTRUCTION COMPANY, INC., herein referred to as the "Contractor." WITNESSETH: That the parties hereto have mutually covenanted and agreed, and by these presents do covenant and agree with each other, as follows: The complete Contract consists of the following documents which are incorporated herein by this reference, to -wit: Notice Inviting Bids Information to Bidders General Provisions Special Provisions Bid Proposal Contract Contract Bonds Plans The July 2002 Edition, Standard Specifications, State of California, Business and Transportation Agency, Department of Transportation All of the above documents, sometimes hereinafter referred to as the "Contract Documents," are intended to cooperate so that any work called for in one and not mentioned in the other is to be executed the same as if mentioned in all said documents. ARTICLE I - That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the City and under the condition expressed in the two bonds bearing even date with these presents and hereunto annexed, the Contractor agrees with the City, at Contractor's cost and expense, to do all the work and furnish all the materials except such as are mentioned in the specifications to be furnished by the City, necessary to construct and complete in a good workmanlike and substantial manner and to the satisfaction of the City the proposed improvements as shown and described in the Contract Documents which are hereby made a part of the Contract. ARTICLE II - The City hereby promises and agrees with the Contractor to employ, and does hereby employ, the Contractor to provide all materials and services not supplied by the City and to do the work according to the terms and conditions for the price herein, and hereby contracts to pay the same as set forth in Section 5.600, "Measurement, Acceptance and Payment," of the General Provisions, in the manner and upon the conditions above set forth; and the said parties for themselves, their heirs, executors, administrators, successors and assigns, do hereby agree to the full performance of the covenants herein contained. ARTICLE III - The Contractor agrees to conform to the provisions of Chapter 1, Part 7, Division 2 of the Labor Code. The Contractor and any Subcontractor will pay the general prevailing wage rate and other employer payments for health and welfare, pension, vacation, travel time, CONTRACT.DOC 1 05/04/2011 and subsistence pay, apprenticeship or other training programs. The responsibility for compliance with these Labor Code requirements is on the prime contractor. ARTICLE IV - And the Contractor agrees to receive and accept the following prices as full compensation for furnishing all materials and for doing all the work contemplated and embraced in this agreement; also for all loss or damage arising out of the nature of the work aforesaid or from the action of the elements, or from any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution of the work until its acceptance by the City, and for all risks of every description connected with the work; also for all expenses incurred by or in consequence of the suspension or discontinuance of work and for well and faithfully completing the work, and the whole thereof, in the manner and according to the Plans and Contract Documents and the requirements of the Engineer under them, to -wit: Perform the work necessary to consist of removing and disposing of the existing playground equipment, 3,000 square of existing poured -in-place surfacing material, 600 square feet of concrete flatwork and two concrete ramps. New work will include providing and installing a matrix net cable climber, a 2 -bay arched swing, 540 square feet of concrete flatwork, two concrete ramps, turf and other incidental and related work, all as shown on the plans and specifications for "Van Buskirk Park Playground Improvements, 600 North Pleasant Avenue". CONTRACT ITEMS ITEM EST'D NO DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE 1. Furnish and Install Temporary Project Sign 2. Temporary Fencing EA 1 LF 230 3. Remove and Dispose of Poured - in -Place Playground Material and Base Rock Subgrade SF 3,000 4. Remove and Dispose of Playground Equipment Including Concrete Footings LS 1 5. Remove and Dispose of Concrete Flatwork SF 600 6. Remove and Dispose of Concrete Ramps EA 2 7. Sawcutting LF 21 $ 650.00 $ 650.00 $ 2.00 $ 460.00 $ 1.00 $ 3,000.00 $ 2,000.00 $ 2,000.00 $ 2.00 $ 1,200.00 $ 200.00 $ 400.00 $ 13.00 $ 273.00 VanBuskirkPark1mp4.Doc 2 05/04/11 ITEM NO. DESCRIPTION 8. Matrix Net Climber and 2 -Bay Arched Swing 9. Concrete Flatwork 10. Concrete Ramps EST'D. UNIT QTY UNIT PRICE TOTAL PRICE LS 1 $ 19,300.00 $19,300.00 SF 540 $ 7.55 $ 4,077.00 EA 2 $ 525.00 $ 1,050.00 11. Fibar System 300 CY 125 $ 112.00 $14,000.00 12. Construction Staking and Soils Testing LS 1 $ 500.00 $ 500.00 13. Furnish and Install New Turf Sod SF 250 $ 2.00 $ 500.00 TOTAL $47,410.00 ARTICLE V - By my signature hereunder, as Contractor, I certify that I am aware of the provisions of Section 3700 of the Labor Code, which requires every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract. ARTICLE VI - It is further expressly agreed by and between the parties hereto that, should there be any conflict between the terms of this instrument and the Bid Proposal of the Contractor, then this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said proposal conflicting herewith. ARTICLE VII - The City is to furnish the necessary rights-of-way and easements and to establish lines and grades for the work as specified under the Special Provisions. All labor or materials not mentioned specifically as being done by the City will be supplied by the Contractor to accomplish the work as outlined in the specifications. ARTICLE VIII - The Contractor agrees to commence work pursuant to this contract within 15 calendar days after the City Manager has executed the contract and to diligently prosecute to completion within 30 WORKING DAYS. WHEN SIGNING THIS CONTRACT, THE CONTRACTOR AGREES THAT THE TIME OF COMPLETION FOR THIS CONTRACT IS REASONABLE AND THE CONTRACTOR AGREES TO PAY THE CITY LIQUIDATED DAMAGES AS SET FORTH IN SECTION 6-04.03 OF THE SPECIAL PROVISIONS. CONTRACTOR AGREES THAT THIS AMOUNT MAY BE DEDUCTED FROM THE AMOUNT DUE THE CONTRACTOR UNDER THE CONTRACT. Van BuskirkParklmp4.Doc 3 05/04/11 IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands the year and date written below. CONTRACTOR: CITY OF LODI By: Konradt Bartlam City Manager By: Date: Title (CORPORATE SEAL) Attest: City Clerk Approved As To Form D. Stephen Schwabauer City Attorney�� Van BuskirkParklmp4.Doc 4 05/04/11 RESOLUTION NO. 2011-84 A RESOLUTION OF THE LODI CITY COUNCIL AUTHORIZING THE CITY MANAGER TO EXECUTE CONTRACT FOR VAN BUSKIRK PARK PLAYGROUND IMPROVEMENTS, 600 NORTH PLEASANT AVENUE WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened on May 4, 2011, at 11:00 a.m., for the Van Buskirk Park Playground Improvements, 600 North Pleasant Avenue, described in the specifications therefore approved by the City Council on April 6, 2011; and WHEREAS, said bids have been checked and tabulated and a report thereof filed with the City Manager as follows: Bidder Bid A. M. Stephens Construction Company, Inc. $47,410.00 Playscape Construction $52,650.00 Harris Builders, Inc. $54,400.41 WhoBuilt Creative $57,512.00* Diede Construction $61,332.09 Haskell & Haskell Engineering $64,928.98* Elite Landscaping $67,809.00 Community Playgrounds $68,649.70* McNabb Construction $84,385.00 " Corrected figure WHEREAS, staff recommends awarding the contract for the Van Buskirk Park Playground Improvements, 600 North Pleasant Avenue, to the low bidder, A. M. Stephens Construction Company, Inc., of Lodi, California, in the amount of $47,410. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby authorize the City Manager to execute the contract for the Van Buskirk Park Playground Improvements, 600 North Pleasant Avenue, with the low bidder, A. M. Stephens Construction Company, Inc., of Lodi, California, in the amount of $47,410. Dated: June 1, 2011 I hereby certify that Resolution No. 2011-84 was passed and adopted by the City Council of the City of Lodi in a regular meeting held June 1, 2011, by the following vote: AYES: COUNCIL MEMBERS — Hansen, Katzakian, Mounce, Nakanishi, and Mayor Johnson NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS— None ABSTAIN: COUNCIL MEMBERS— None City Clerk 2011-84